Plater Work JSA.

The document outlines a Job Safety Analysis for plaster work conducted by Constro Engineering Solutions, detailing various sub-activities and associated hazards such as unskilled workers, slips, and dust inhalation. It provides control measures to mitigate risks, including deploying trained personnel, using personal protective equipment (PPE), and ensuring proper supervision. Additionally, it emphasizes the importance of safety protocols during scaffold erection and material handling to prevent accidents and injuries.

Uploaded by

raj.safetyehs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views6 pages

Plater Work JSA.

The document outlines a Job Safety Analysis for plaster work conducted by Constro Engineering Solutions, detailing various sub-activities and associated hazards such as unskilled workers, slips, and dust inhalation. It provides control measures to mitigate risks, including deploying trained personnel, using personal protective equipment (PPE), and ensuring proper supervision. Additionally, it emphasizes the importance of safety protocols during scaffold erection and material handling to prevent accidents and injuries.

Uploaded by

raj.safetyehs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Job Safety Analysis.

Activity Name - Plaster Work wor


Vendor Name - Constro Engineering Sol

SR NO. Sub - Activity Name

1 Manpower Mobilization

Material shifting to work


2
location Manually

3 Mixing cement.

4 Platering Work
5 Scaffold Erection & Dismantling

5 Height Work
Job Safety Analysis.
Activity Name - Plaster Work work.
Vendor Name - Constro Engineering Solutions.

Hazard

Unskilled/ Untrained workers

[Link] housekeeping
[Link] lifting and handling of materials.
[Link] and trip due to wet or uneven surface.
[Link] inhalations.

1) Inhalation of Dust.
2) Physical Injury
3) Tripping Hazard

1) Hand, eye and ear


injuries.
2) Inhalation of Dust.
3) Unskilled persons involve this activity
[Link] tools are using
[Link] Stress/Exhaustion
1. Collapse of scaffold
2. Fall of materials, hand tools
3. Fall of Person due to slip, trip, obstruction in access, openings, failure to anchor safety
harness
4. Protruding upright rebars
5. Usage of defective / damaged materials
6. Electrocution due to overhead lines
7. Uneven ground surface, loose soil
8. Deployment of untrained & unfit workforce
9. Overloading / lack of supports / fixing of bracings, ties, counter pins, jointers, etc.
10. Awkward posture
11. Inclement weather (hot, cold, humid)
12. Unsecured platform, walkways, MS perforated working platform, etc.
13. Horseplay
14. Poor visibility
15. Rusted Materials.
16. damaged Material

[Link] of person from


height

[Link] of materilas

Prepared By : Constro Engg. Solutions


Reviewed By :
Approved By :
k.
utions.
Risk Control
Control Measures Measures
Responsibility

[Link] only trained, safety inducted, medically fit workers to


work.
2. Ensure provision of approved gate passes & required PPE's. Safety Site Engineer/ Site
helmet, safety shoes, safety goggle & reflective jacket. EHS Engineer.
3. Work to be carried out under competent supervision.

1. Removal of obstruction from passage way/gangway


[Link] required & necessary PPE's shall be used.
3. supervisor will ensure the activity. Site Engineer/ Site
[Link] required manpower as per EHS Engineer.
weight & size of material. 5. Ensuring Proper
Access

1) Dust masks and hand glovs to be worn whilst opening cement Site Engineer/ Site
bags and mixing cement. EHS Engineer.

[Link] trained persons are to operate the saw with


the use of goggles and earmuffs.
[Link] should be trained & well orientated.
[Link] to work tools are inspected & colour coded.
[Link] of PPE'S like helmet, goggle, gloves, and dust Site Engineer/ Site
mask, safety shoes, jacket & covers all to save the EHS Engineer.
injuries.
[Link] potable water/sufficient shelter is available
each area where workers are doing the job.
1. Scaffold to be erected on levelled and firm ground with base plates
2. Screening of workers to be done along with height phobia test.
3. Trained & experienced workers to be engaged for erection and dismantling of scaffold
4. Access to be provided for reaching the work location.
5. Working Platform to be fully boarded / 600 mm width & secured, mid rails, handrails and toe
board to be provided.
6. Double lanyard full body harness with shock absorber to be used by the workers doing the
scaffolding.
7. Loose material not to be kept on top of scaffold and not to be overloaded.
8. Hand tools, materials to be secured so that it will not fall even if mishandled. Site Engineer/ Site
9. Training for scaffolders to be done by the vendors (weekly, fortnightly, monthly).
10. Safety Helmet, Shoes, Hand gloves to be used. EHS Engineer.
11. While erection and dismantling, safety watcher need to be deployed and barricading the
area below to be done and display of signage to be done as per the activity.
12. Material not to be thrown from the top of the scaffold / elevated levels.
13. Lifeline to be provided for anchoring the safety harness.
14. Electrical cables not to be routed / anchored through the scaffolds towers / frames.
15. Lighting to be provided for clear visibility.
16. Work not to be permitted in case of inclement weather conditions.
17. Training on emergency rescue to be conducted for the workers engaged in the activity.
18. Use only good condition of scaffolding components for the erection of scaffolding.

1. Provide barrication / safety signages to


avoid unauthorised entry at work location. 2.
Loose materilas will not be left on plateform. 3. Site Engineer/ Site
Adequate supervision to be provided at all time EHS Engineer.
4. Conduct job specific training to all crew.
5. Safety harness will be used