1.RCC Check List

The document is a pre-pour inspection checklist for a construction project at Lodha Park, detailing the necessary activities and requirements for reinforcement bars, shuttering, services, and safety. Each section outlines specific criteria that must be met before proceeding with concrete pouring. The checklist is designed to ensure compliance with approved drawings and standards, involving multiple contractors and quality control measures.

Uploaded by

apurv.jadhav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
120 views2 pages

1.RCC Check List

The document is a pre-pour inspection checklist for a construction project at Lodha Park, detailing the necessary activities and requirements for reinforcement bars, shuttering, services, and safety. Each section outlines specific criteria that must be met before proceeding with concrete pouring. The checklist is designed to ensure compliance with approved drawings and standards, involving multiple contractors and quality control measures.

Uploaded by

apurv.jadhav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Contract Ref:

LODHA Contractor Check list for Pre-pour


PARK logo Inspection
IR No.
Name of Contractor: Date:

Pre-pour check list


Element details: _______________________________________________________________________
Sr. Contr. Contr. Lodha Lodha
Activity
NO CM QC CM QA
A Reinforment bars
1 Approved drawings are available
2 Diameter of bars are as per approved drawing
3 Spacing/no. of bars are as per approved drawings
4 Cover to rebar is as required
5 Distribution of cover blocks is as per approved details.
6 Alignment of rebar is satisfactory.
7 Lap location is staggered and as per approved details.
8 Lap length is sufficient.
All dowel bars/couplers/addl. bars near openings are placed as
9
per approved details.
10 Coupler tightening is satisfactory.
11 Ensure continuity of earthing rebar.
12 Cleanliness is satisfactory
Approved to proceed with shuttering work (for vertical
13
elements)
B Shutter
1 Approved drawings are available
2 Materials used for shuttering work are as per approved details.
3 Dimensions of shutters are satisfactory
4 Cleanliness is satisfactory
5 Gaps in shutters are sealed properly.
6 Supports and bracings are as per approved details
7 Alignment of shutters are OK
8 Verticality of shutters are OK
9 Mould release agent is applied on the shutters.
10 Top level of concrete is marked on the shutters.
Contr. Lodha
C Services
MEP MEP
1 Electrical
2 Mechanical/Elevators
3 Plumbing
4 Only fixing of embedded items for concrete structure
Contract Ref:
LODHA Contractor Check list for Pre-pour
PARK logo Inspection
IR No.
Name of Contractor: Date:

5 Facade: inspection of completed works embedded item


6 Others
7 Builders openings are as per the approved details
D Safety requirements are OK
E Approved to proceed with the concrete pour
Comments

Contractor Surveyor Lodha Surveyor Lodha MEP

Contractor Contractor LODHA LODHA


CM QC CM QA

Name

Designation

Signature

Date and time