Form No MPP/QC/R/11
Inhouse Corrective Action Report Rev No 0
Date
Part Name Part Description
Problem Identified Operator Name
Shift Supervisor
SCAR Initiated Date Identification or Traciability
Machine No
1 ESTABLISH PROBLEM SOLVING TEAM
Team Leader : Champion :
Team Members :
2 PROBLEM DESCRIPTION (Attach Photographic details of failure, or Data etc)
3 CONTAINMENT ACTION / SHORT TERM ACTION
Stage Date Actions Planned / taken Implementation date Responsibility Remarks
4 ROOT CAUSE ANALYSIS (Attach -Cause & Effect)
WHY ~ WHY…... ANALYSIS
Root Cause Analysis Cause Action Resp. Target date
Probable Cause
1 WHY ?
2 WHY ?
3 WHY ?
4 WHY ?
5 WHY ?
4
5 PERMANENT CORRECTIVE ACTIONS / LONG TERM ACTION Process side and Detction Side (Attach Photographs of actions taken)
o
f
Date of
Corrective Actions Planned /
Identified Root Cause Error - Proofing Responsibility Implementatio 4
taken
n
6 IMPLEMENT PERMANENT CORRECTIVE ACTIONS (VERIFICATION)
Sr Corrective Actions Taken Target Actual Results of Action taken Date of Review Status
Action taken in Existing Stock
HORIZONTAL DEPLOYMENT/VERTICAL DEPLOYMENT (List other similar processes and parts with potential for the same defect)
Sr Part No. Corrective Actions Resp. Target Status
2
3
PREVENTATIVE ACTIONS TO AVOID RE-OCCURENCE - DOCUMENTS / SYSTEMS (Attach copies of all revised documents)
Planned
# QMS Document P if Yes Responsibility Actual Date Status
date
In-house
1 Quality Plan
Supplier
2 Setup Sheet
3 SOP
4 Drawing / Process Flow Diagram
5 PFMEA / DFMEA
6 Acceptance Standard
7 PM Checklist
8 Work Instruction/Calibration Plan 3
o
f
7 Corrective action effectiveness monitoring through next 3 settings:
4
Date Lot No Dispatch Qty Result Serial No Tracking Remarks
Complaint Status OPEN / CLOSE
PKF 022_R1
PKF 022_R1
Probable Cause 1
1 WHY ?
2 WHY ?
3 WHY ?
4 WHY ?
5 WHY ?
Cause And Effect Diagra
Management Man Method
Cause Cause
Cause Cause
Cause
Cause
Cause
Cause Cause Cause
Cause
Measurement Machine Material
d Effect Diagram Sheet
Effect
(Y)
erial