Inhouse Corrective Action Report FORMAT

The document is an Inhouse Corrective Action Report designed to identify and address problems related to part quality. It outlines a structured approach for problem-solving, including team establishment, root cause analysis, corrective actions, and preventative measures. The report also emphasizes the importance of monitoring corrective actions and documenting changes to avoid recurrence.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views11 pages

Inhouse Corrective Action Report FORMAT

The document is an Inhouse Corrective Action Report designed to identify and address problems related to part quality. It outlines a structured approach for problem-solving, including team establishment, root cause analysis, corrective actions, and preventative measures. The report also emphasizes the importance of monitoring corrective actions and documenting changes to avoid recurrence.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Form No MPP/QC/R/11

Inhouse Corrective Action Report Rev No 0

Date

Part Name Part Description

Problem Identified Operator Name

Shift Supervisor

SCAR Initiated Date Identification or Traciability

Machine No

1 ESTABLISH PROBLEM SOLVING TEAM

Team Leader : Champion :

Team Members :

2 PROBLEM DESCRIPTION (Attach Photographic details of failure, or Data etc)

3 CONTAINMENT ACTION / SHORT TERM ACTION

Stage Date Actions Planned / taken Implementation date Responsibility Remarks

4 ROOT CAUSE ANALYSIS (Attach -Cause & Effect)

WHY ~ WHY…... ANALYSIS

Root Cause Analysis Cause Action Resp. Target date

Probable Cause

1 WHY ?

2 WHY ?

3 WHY ?

4 WHY ?

5 WHY ?

4
5 PERMANENT CORRECTIVE ACTIONS / LONG TERM ACTION Process side and Detction Side (Attach Photographs of actions taken)
o
f
Date of
Corrective Actions Planned /
Identified Root Cause Error - Proofing Responsibility Implementatio 4
taken
n

6 IMPLEMENT PERMANENT CORRECTIVE ACTIONS (VERIFICATION)

Sr Corrective Actions Taken Target Actual Results of Action taken Date of Review Status

Action taken in Existing Stock

HORIZONTAL DEPLOYMENT/VERTICAL DEPLOYMENT (List other similar processes and parts with potential for the same defect)

Sr Part No. Corrective Actions Resp. Target Status

2
3

PREVENTATIVE ACTIONS TO AVOID RE-OCCURENCE - DOCUMENTS / SYSTEMS (Attach copies of all revised documents)

Planned
# QMS Document P if Yes Responsibility Actual Date Status
date
In-house
1 Quality Plan
Supplier

2 Setup Sheet

3 SOP

4 Drawing / Process Flow Diagram

5 PFMEA / DFMEA

6 Acceptance Standard

7 PM Checklist

8 Work Instruction/Calibration Plan 3

o
f
7 Corrective action effectiveness monitoring through next 3 settings:
4

Date Lot No Dispatch Qty Result Serial No Tracking Remarks

Complaint Status OPEN / CLOSE


PKF 022_R1

PKF 022_R1
Probable Cause 1

1 WHY ?

2 WHY ?

3 WHY ?

4 WHY ?

5 WHY ?
Cause And Effect Diagra

Management Man Method

Cause Cause

Cause Cause

Cause
Cause
Cause

Cause Cause Cause

Cause

Measurement Machine Material


d Effect Diagram Sheet

Effect
(Y)

erial