0% found this document useful (0 votes)
65 views105 pages

Wa0000.

The document outlines the Environmental Impact Assessment (EIA) process, including its importance, objectives, and components as mandated by Indian policies. It details the EIA cycle, procedures such as screening and scoping, and the roles of various stakeholders in the assessment process. Additionally, it discusses the advantages and disadvantages of EIA, as well as classifications of environmental impacts.

Uploaded by

babukondapaka8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
65 views105 pages

Wa0000.

The document outlines the Environmental Impact Assessment (EIA) process, including its importance, objectives, and components as mandated by Indian policies. It details the EIA cycle, procedures such as screening and scoping, and the roles of various stakeholders in the assessment process. Additionally, it discusses the advantages and disadvantages of EIA, as well as classifications of environmental impacts.

Uploaded by

babukondapaka8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
UNIT-1 Introduction: The Need for EIA, Indian Policies Requiring EIA, The EIA Cycle and Procedures, Screening, Scoping, Baseline Data, Impact Prediction, Assessment of Altematives, Delineation of Mitigation Measure and EIA Report, Public Hearing, Decision Making, Monitoring the Clearance Conditions, Components of EIA, Roles in the El Process. Government of India Ministry of Environment and Forest Notification (2000), List of projects requiring Environmental clearance, Application form, Composition of Expert Committee, Ecological sensitive places, International agreements. © scanned with OKEN Scanner Unit 1 * Introduction x 1) Environmental impact assessme” © scanned with OKEN Scanner Sn CA Ce eee ee eer) Soe earetra amen oo eno ean eee eee a oe eno oor Fess ee eee nce OCLs + Wi rates ha tomes? cee SE rg Sen coe eto re ee ree tee eee pao Deo eet een eee Aero Tod cod Powers eetecerennn! Cred Pees cod eee’ © scanned Cerner eerenn nes Erseidieniiesiaierenieeneneee tars ed ee ere ee nL eee ree PN Do een en Sd eee eee ene eet features of EIA © scanned with OKEN Scanner Soe ere Steet ee acs Ceara eee ered Be eo Sree ered OT at] ern arene eed eee eet en eens Pete eas ee ere ee era Oe ee ed earn onas eee 7. Selentiicend Systematic reer renereneniey 8. @ Covers Different Types of Impacts od Su Ly + Blological Impacts (on animals and plants) De ea A Re} BSC UAE od arty eal Ce Dee ates ere ee Cd Dale i eile a Cd eee td ented Cen eee ey Reese Se eet uy Reese) ee ead een ere er ere ‘canned with OKEN Scanner TARR i cs Dee ns ecg a TCR ct Te OR tg Coon ReU RT wey See een nes ee ru ar rea] Ce Se betes a4 od ed Oo CE Corey Sd Seeley aod Pee ord Doe ek eee ead Penne ey CT ecLLN Deen See ny eerie Can lead to rushed or unfair decisions N Seann Objectives (or)Goals: © scanned with OKEN Scanner @ Objectives of EIA (in an Easy Way) eet Senneterre td Bt eo) eee eer ny pennies ey Tot pein rte eft pet ng st hdc Bed ie te ee ar ou a ores snc Ctr) Sn eT peaesteterns eee Sennen tne ee a © scanned ate Ojebect ? Ce eer rercevorte Penner ny reer Oe eet ences ape Cecio eee a perenne eer ene ren Cy Pol de’ etorains pmeme aiiotey n deet Peereetey (© bonele seen crea) ote) eee een Soren eT ener Deena ee een on © scanned Dr eed See as Oa eee eet oa Dee Loren ee eee ees pee eee Lena ore ened Peon (i Redce gee pote ee) cee amen) ee reid Der Set ete res es Cad Pee So Secor ony + Share figs wit pute ed een eee etary components of EIA © scanned with OKEN Scanner Senin Cet eet) Poona Pea are ns orci ee te CT od rend Pree ooo eee eons ees Beret) ad De een need Soo ond Deanne’ See) cee og OT eee ered ee ta @ bare ee ees ed ere Seay Cr Pens Perec! Sey eee’ Coes oan ference eee acer) Sead eee ee et @ Sapte es Pees eres ray bat nots Da rer eens Sens Cena ey en creer ‘Scanned with OKEN Scanner Cees oreo) cerns arpa ed prey ed Decry ee Ld Pear Cee Sed ea cet Pere Can Ce ec Peer ces Ce Cee es onpeope Deeg ee ee ey i Simple Example Recap ree cog SE ee Sed epee Bree rete Oe nay ST ee Dea € Components of EIA are the different envronmental and socal areas studied to Nee ee ete ed Pe Factors that affect EIA © scanned with OKEN Scanner OL ota’ Assessment) eee eran Prey SE eles eee en eran Doe en See eee FE ee enn ce en Sete eee ee ad eres ee arene bron) ee ae ee eee eee er ee een eee oa ee nn ‘Scanned with OKEN Scanner eer me too Pee paneer Tenet erro Perey eed Peed ee Ls ee ee eee UL Pp erred Pees cos Crd ere as Pl eed Pe ad Cd aaa PT eid eer er Crd eC Ta Peed an experi te people in Amat ee ere eto Lia ee ee ete rd cate + gear st wie rah rhs CT en a ee Ce ene en Ch metend ot ae eee een en re ey ple er eee ee Seinen rateenete eater ne rs © scanned with OKEN Scanner 2)The Need for EIA: RU nde Dee ee ee eee ene eee eee Se GEE ong ed eee ee eee ets OR en Cen ae Bees eta eee tee tee at ee en Ce ets Pad ee rot ee eee etd feos Oe eee cn) SE ee eee ee Peet cred en ee ro A ed Ce Sead ee ee en LL ros ee enc © scanned FTCA Sod Deg Sa) Ce Ty eed Pett oy Md td Cn Prevent pollution and illness Approve or modify plans Ay Stn Required by government Sy Geet) Example er eete Lay forest ST EE cy De CR RC DC Legal step before mining or Cg RT era eu a led adavatages & disadvantages of EIA © scanned with OKEN Scanner peepee recent ec’ eee aa CT ceteeend ie ee eee @ carete ne Cee eta reer irenapnerieeaaese nnn ent eay etare oad aa Cereal eee paninerr Disarray © parole ed Deets reenneenene ent enna otic © cnnpte Perea reid PP ed es an peer PE eee] coeeatnePereneT © carole peer ee Pea) ee oon er co © scanned Secu’ cr cree ce ce ees Prenrny ee et naan’ a peveaerenerer eens Ped Po. oan Oey OT eeeteeed Peace SnEe tte tenn CT eenaemad a phate Cael os as Peed Pepieyeee ere a Peet eet cee’ ‘Scanned with OKEN Scanner no Dee eee er eee Ree secre Deon aud pated od + Expensive eet) Cans Sed Naas (@ EIA helps protect he environment, but needs time, money and honest effort, Poy [ore aed eee eT ed coo ee’ Perera rey nae y ‘Saves money lng tem enti) Cee ee Cie ela) Cy ey Ccamet pret everthing classifications of environment impact © scanned with OKEN Scanner Ce Cee ed Grouping the different types of effects a project can have onthe environment. eg Ro Rc eee Peres Ctr eerie Se eee eed De erg BE eg eid Rae Dees es Ree a ore De ete Pd ee ene toad Ter Bee een os Indirect Impacts Rts Pees A ee h OKEN Scanner DD eee ey See od Cr Beer tcs ord eed rea Sie Oe od Cenc Ce cree ed Cee oe een oo Cd Se Laas or eee os Deen Pret een @ Example Aeneid Peeled ane ee + Adar changing the rive ow downstream © scanned Deno! il bie eee nls — a ere Cee od Cert ey cy ee ce) ey Peet Reed Cee Ac Pee acc fee Permanent Cee coo red Deets fos Cree) Cec Cd Pee ed » feo] Pre a Cd fees Ce Ca cic mi Pyne eee na eu ro [Bre Pare eee ee ae ce FE eeu oud Scanned 3)Indian Policies Requiring EIA: sev cnn meet pe SenterneeT Tarr Pte e ener ere ee eee eeareie eee ren eee ed Penne Pienemaaieneeniay an eee) eer) Se yee rere) ee ‘Scanned with OKEN Scanner Tere ee De ee Le Td COs eer eee ener ence eet re Te etry Deer a en et Pettey nud, Cd te ee ean eC eee) eee ear Oe ee ee ee eee Ce De aa eee Ce en reer CT oot etry CEL eee eaten © Damp: See eet CD nae ee) CA eel CeCe tte pone Ca Cd aa Cd eed Cea) ee ee tcd Cod ere ee) Coney ened eee Ce aerea LD Cee Pon aey Ly ager) ee ey io Ce a Ta) Cea PE econ Pee neuer) eto Ee oad Dd Pee ee Dee oo ead Cee ed Pee aa Nee Cee eee Important questions Draft Environmental Impact Assessment (EIA) Notification, 2020 © scanned with OKEN Scanner Pent) Se er eee Ur pe eee ee ee oT Peers renter ros Cong Deere Pee eT ear Cn Here ae man ihn spe words: Oe ad ret) roar) ened panier a tert tay Pt ed ee eC oc rod ee Coy Cr oe eee oo Peed ee oe ero ed ren ee La © scanned Ce ioned Sd es + Cerin consrcton ects er tay © camps re Ce) Se ere eee eg ee ere ets Cee ee ead ee ee a See en) Cee eee eed eed ers Se anne Sean oad ee eee ees eed en rn 4)The EIA Cycle and Procedures : © scanned with OKEN Scanner ere) Cente enone ets I Steps inthe EIA Cycle (with Simple Explanation & Example) 1. Screening Ce carers Torey easier eet eterna coy Pane ee eee ereeeere et eee eee ney ee od eterna tee entra cone eerie Oe eset) Lerner ene en a ee nee eee © scanned with OKEN Scanner Cer ye) Saad eterno coe eee ee ene cnc ee ey Ce ee cons cee Ce er Oe rat) Dene nee ert Ls pare a ne cd anol omnes Pee err) ford creerrnany Pore ronnie) eed eee coated deormsparcange —Aopowewthcotns 5)Screening: Cee Cee Tne ee eee ee ee ee en Ed ere rere Ee ee eEeeLTS Ad ee er] err ee eee) enn ond 1. ear pete — Nad esa mane ponent eer Se eee eae eseeneaetrrN Cs Sree + BUAig che ft Non BA ray pets st) eer © scanned 6)Scoping: Penn Serevent mee een Tine eo See eae ee eee etd eeeereenerranearnrins eet ee oetrons Rees ni Oe eee eet eran’ Thay act ih pa en li pop) i be eee eee eens ny (E what scoping nce: SE ree ney eran eens Cees ee Seen ee + hese nda ten og eee © scanned Differences between screening & scoping © scanned with OKEN Scanner Q18. Write the difference between Screening and Scoping in the EIA process. 1. Screening: Screening is the first step in the EIA process. It helps to decide whether a project needs an EIA or not. Itis done by E1A authorities or consultants using expert teams (engineers, ecologists, scientists, etc.). Itis a quick and easy method to decide if a detailed study is needed. If the impact is likely to be significant, a full EIA is required. 2. Scoping: Scoping is the second step in the EIA process. It identifies the important environmental issues to focus on in the EIA study. Ithelps in site selection, checking technical options, and avoiding delays. It involves stakeholders, such as developers, environmental agencies, and local people. It makes the E1A focused, flexible, and transparent, and improves public understanding. © scanned with OKEN Scanner pe Lt eto ce ‘Screening and Scoping are two different steps in the EIA process. De rd Doe CC Loge Lt esas CR oe Sed Len a patie Caicos Pos Se sac Rog OD enc eee Rotten Ct Eee ecu Seer EE ere cea Se eos eS Cee Paes Sen Las | Oe utes @ scanned with OKEN Scanner Pod ed Sooping means ee eet Te eet ery Pees Ce En od Cod Sree er nd oa Cerny tc Prod eee cerns ey ed ey Perio) ed Ded Cee acd aeeeert eet] Sad eed omens) ed od od poet een heen eg ed coed co Pee) een 7)Baseline Data: Eee ee reer Prstanenaeneneisonaesr any Re ean eee en es See See Setter ae ee etn ceed oon oe eer) Se ern ee ees Se eae) + Nolet 55 48 fm) See eee ee ects Ce eee ee ety Paes eaneee er Tarn ond ret pad tno eg conons © scanned 8)Ilmpact Prediction: enn Sere eane ety Pamaienmnnneery imple Detnton: Eleanore tioamaatetiond Pal seaancanuersncserinteteir strana Cees eee eee ee er et Tey St eed oe eee es eee ed ey nn nom ee eter) Ce ee eee nd eens + tet fer eter ee © scanned ith OKEN Scanner Seu al) Tr Answer Red Estimating how a project will affect the environment Peed SO eg eS Dee ECR Ltd od Rd Dr Cad Te Rect a ore) OKEN Scanner 9)Assessment of Alternatives: © scanned with OKEN Scanner Se cement ry Se eubbanasieet oneal od Seapets tea ee eer + Topo commuter and ee aed Soren) framerees eee eeen en Seen oe ete ee ene ee eens ce © scanned 10)Delineation of Mitigation Measure: © scanned with OKEN Scanner Dee et eG Cee ee ee ete eee ees ead TT aserieabicteeaba eat ae) rae saree caren OL ee ey Se nd OR ee eee ood Bn no ol ood Coan ange ela ret een rod oe a roe eet) Py eed aan coy Sn Lae od od ceed coed eee © scanned What is delineation? OR What is the necessity of delineation of study areas for EIA? © scanned with OKEN Scanner ern ee ee ee aod See eee mene reenter ee erret rr ene) et) eer eer) 1 oyu eet (re ocean 0nd nd pet Ce) Peed Ce eee end ens enor @ boro: Cero reer © scanned Ce ng Eee eee Oe et Coe te Geena ad SG a ete rd See rg ey ort eet ee te try ee ag cree short Definition: Ce Te hae een Lent y Pe eee ences sens Cad Seer Sean STR) ee eed ard Det ee ny fa CT ee een ee eee 11)EIA Report(or)audit report: tr od ene ee toy a ety Se ed ree eet ey ed tee eet ranean nen eC ee et coe Peed ener ior ee pane eee pear renanes Sercacomneen Cee od eee ed eee ecg eee ee er eer Cry freer eg ed Serer ay Ce Ra Mee Been ee ee te eA ny Se ee ee me Ra + Mitigation: Dust filters, noise barriers, rainwater harvesting Te a eR aes ee eRe eee oll SRP eo Un eC Dos cl TE ee ee ean eco s CSU cr eine io Oe CT teni We OSU Le DR ee ca Sea Cy Cd oO ever One r ey en ees Wo reat? Goverment publ and deconnokera Cet Tohelp in making eco friendly decisions Dae eee pesherieenenatey eeesree reer) ME Simple Dot: TE oriedennenrietesubterencied peaenesreprormenedenaserwenneueion Sete tee Petrie eos + Tomgoet as oven on anf ne sere en Deen Pee ee rad ees ee eee nn eterna © scanned YEU ba rtd Se og oie ed Ore aT) Se notary Se enue | BS ah pone SNe en Cou ame eta Coun Se ete ad Ree et ed Ce ett © scanned y 12)Public Hearing: eee een te ed Coreen ee ened een tees Po een at ree eenameer Pereeeertey ee ee aed ao Seer ere eran eas eee eens Ped Serene) ce ered © scanned @ Simple Example Recap: Pa es eee ACS Oa RUC eh Ue HE A notice goes out: Public hearing on August 1st. | Be each Mo aR UC ee | Mennurks NAT eek ot R el cele meek UU Reel e i Officials record these concerns. i The committee considers these points before giving approval. LAD aSe eau elie V Gives transparency VAs ee Ta Cy VAN ee em MEM Ue y Importantance, processdure, adavatages & disadvantages © scanned with OKEN Scanner ‘030. Discuss the Importance, procedure, advantages and disadvantages ofthe public hearing process nA OD paswer © importance of Public Hearing in EIA (fevronmentalknpact Assessment) Pic hearings forms meeting where peple cn give ther opinions and suggestions about 3 proposed development project. Ie isimportant because: 4. Publecan ave concerns aout the projet 2. people can atk questions ad get larfations. 2 Mewistes oes cn beefed. 4 theps in fang solutions to problems ear 5. Iincresses publ awareness and involvement © Procedure of Public Heading 1. ube meetings or hearing are arange atthe project ste, 2. Advertisements ae pushed in newspapers to nfm the public 3, Pubic aes thelr opnions, feedback, and suggestions. 4 aa colts through surveys, hotlines or advisor cound 5. Publcinput i anayaed and sto decston-making autores. © pavantages 1. Inreses publeawarenes about enironmental impacts 2. Hepsunderstand problems rom ea people's point of view. 3. Encourages community partpation a environmental protection, 4. teaes inks for ature olaboratin (¢8, wth educators or ocal NGOS 5. Helps in beter decison making for sustansble development 6. Promotes poste environmental behaviour among cies. © Disdeantages 1. Some people maybe uniting attend or may not be interested. 2. The process canbe time-consuming and needs planning 2, Mein noiation an survey preparation ar needed 4. Sometimes, ts tcl to expan technical sues tothe publ 5. Public opinians may delay approval or cause oppesion tothe projet. © scanned with OKEN Scanner 13)Decision Making: nt Pha Pere eee rd eomeaneesereenyter teeter tein] td ey ny Sr enn Cents peer tnt eterna s ee Peed eee ee ee ee ed nang es oaityooe Beene ed eee eects oe cron ees ene eee nr eens eanpe aero Soe ees eee etn er rr Ce ee eee cent ate © scanned On Seu eo ots eens Seed ae Tey Coy ret Ge ne eee ae ees Len oe ae eu aoe ny ead ea i Issue Environmental Clearance if approved Pee Sa Dente Ved Pe a Vr) © scanned with o (EN Scanner (@36, What ae the steps Involved Inthe EIA clearance process? on ‘Write an account on the procedure for Environmental Clearance (EC to developmental projects Environmental Clearance (EC) is equired before stating any major project to ensure Iwill not harm ‘the envronment. It le made mandatory under the Enuvonment Protection Act, 1986. © Aimot ec: Tocheck how 9 proposed proc aft: + Theenvronment {a water, sol tc) + Human ag arial fe ‘Are. reduce the negative Impacts 2s much as possible. 1 steps in Enviconmental Clearance (Ec Process: 4 Sereoning © Checks the project needs environmental dearance oot (© Based on project st, oeaon, and ype 2. Scoping ‘© Usts the kay environmental sues to study nA (© Terms ofRlerence (To) are prepared forthe EIA tidy. 3. UA Report Preparation ‘9 The Emdeonmental impact Assessment (EA I conducted ‘0 tncudes data on ar water land, nose, bosversty ete Suggests mitigation measures to reduce harm. 4. Public consuitation / Public Hearing ‘2 Theloca people ghe ther oplnions and concerns about the projet (9 Thee feedbacks included inthe ial report 5. Appraisal ©. xert Appr Commitee (EAC) reviews the EA report an publ hearing deals Check fal envionmertal les and gldenes ae followed. 6. vironmental clearance (EC) Based on the EAC’ recommendation, the government grants or rejects EC, > fapproved, the project can bein with onditans to protact the environment. © Scanned with OKEN Scanner 14)Monitoring the Clearance Conditions: © scanned with OKEN Scanner

You might also like