0 ratings 0% found this document useful (0 votes) 65 views 105 pages Wa0000.
The document outlines the Environmental Impact Assessment (EIA) process, including its importance, objectives, and components as mandated by Indian policies. It details the EIA cycle, procedures such as screening and scoping, and the roles of various stakeholders in the assessment process. Additionally, it discusses the advantages and disadvantages of EIA, as well as classifications of environmental impacts.
AI-enhanced title and description
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here .
Available Formats
Download as PDF or read online on Scribd
Go to previous items Go to next items
Save DOC-20250630-WA0000. For Later
UNIT-1
Introduction: The Need for EIA, Indian Policies Requiring EIA, The EIA Cycle and Procedures,
Screening, Scoping, Baseline Data, Impact Prediction, Assessment of Altematives, Delineation of
Mitigation Measure and EIA Report, Public Hearing, Decision Making, Monitoring the Clearance
Conditions, Components of EIA, Roles in the El Process. Government of India Ministry of Environment
and Forest Notification (2000), List of projects requiring Environmental clearance, Application form,
Composition of Expert Committee, Ecological sensitive places, International agreements.
© scanned with OKEN ScannerUnit 1
* Introduction x
1) Environmental impact assessme”
© scanned with OKEN ScannerSn CA
Ce eee ee eer)
Soe earetra amen
oo
eno
ean
eee
eee a
oe eno oor
Fess
ee eee nce
OCLs
+ Wi rates ha tomes?
cee
SE rg
Sen coe eto
re ee ree tee eee
pao
Deo
eet
een
eee
Aero
Tod
cod Powers eetecerennn!
Cred Pees
cod eee’
© scannedCerner eerenn
nes
Erseidieniiesiaierenieeneneee tars
ed
ee ere ee
nL
eee
ree
PN
Do
een en
Sd
eee
eee ene eetfeatures of EIA
© scanned with OKEN ScannerSoe
ere
Steet
ee acs
Ceara eee ered
Be eo
Sree ered
OT at]
ern
arene
eed
eee eet en eens
Pete eas
ee ere ee era
Oe ee ed
earn onas
eee
7. Selentiicend Systematic
reer renereneniey8. @ Covers Different Types of Impacts
od
Su Ly
+ Blological Impacts (on animals and plants)
De ea A Re}
BSC UAE od
arty eal
Ce Dee ates
ere ee Cd
Dale i eile a
Cd eee td
ented Cen eee ey
Reese Se eet uy
Reese) ee ead
een ere er ere
‘canned with OKEN ScannerTARR i cs
Dee ns ecg a TCR ct Te
OR tg Coon
ReU RT wey
See een nes ee ru ar rea]
Ce
Se betes
a4
od ed Oo
CE Corey
Sd Seeley
aod Pee
ord Doe ek eee
ead Penne
ey CT ecLLN
Deen See ny
eerie Can lead to rushed or unfair decisions
N SeannObjectives (or)Goals:
© scanned with OKEN Scanner@ Objectives of EIA (in an Easy Way)
eet
Senneterre td
Bt eo)
eee eer ny
pennies
ey
Tot pein rte eft pet ng st hdc
Bed
ie te ee ar ou a ores snc
Ctr)
Sn eT
peaesteterns
eee
Sennen tne
ee
a
© scannedate Ojebect ?
Ce eer
rercevorte
Penner
ny
reer
Oe
eet ences
ape
Cecio
eee
a
perenne eer ene ren
Cy
Pol de’ etorains pmeme aiiotey n deet
Peereetey
(© bonele
seen
crea)
ote)
eee een
Soren eT ener
Deena
ee een
on
© scannedDr eed
See as
Oa
eee eet oa
Dee Loren
ee eee
ees
pee eee Lena
ore
ened
Peon
(i Redce gee pote
ee)
cee
amen)
ee
reid
Der
Set ete res
es
Cad
Pee
So
Secor ony
+ Share figs wit pute
ed
een eee etarycomponents of EIA
© scanned with OKEN ScannerSenin
Cet eet)
Poona
Pea
are ns
orci
ee te
CT od
rend
Pree
ooo
eee eons
ees
Beret)
ad
De
een need
Soo
ond
Deanne’
See)
cee
og
OT eee
ered
ee ta
@ bare
ee ees
ed
ere
SeayCr
Pens
Perec!
Sey
eee’
Coes
oan
ference
eee
acer)
Sead
eee ee et
@ Sapte
es
Pees
eres
ray bat nots
Da
rer
eens
Sens
Cena
ey
en
creer
‘Scanned with OKEN ScannerCees
oreo) cerns arpa
ed prey ed
Decry ee Ld
Pear Cee Sed
ea cet Pere
Can Ce ec
Peer ces Ce
Cee es
onpeope
Deeg
ee ee ey
i Simple Example Recap
ree
cog
SE ee
Sed
epee
Bree rete
Oe nay
ST ee
Dea
€ Components of EIA are the different envronmental and socal areas studied to
Nee ee ete ed
PeFactors that affect EIA
© scanned with OKEN ScannerOL ota’
Assessment)
eee eran
Prey
SE eles eee en
eran
Doe en
See eee
FE
ee
enn
ce
en
Sete eee
ee ad
eres
ee
arene bron)
ee ae ee eee
eee er ee
een
eee
oa
ee nn
‘Scanned with OKEN Scannereer me too
Pee
paneer Tenet erro
Perey
eed
Peed
ee Ls
ee
ee
eee UL
Pp erred
Pees
cos
Crd
ere as
Pl eed
Pe ad
Cd
aaa
PT eid
eer er
Crd
eC Ta
Peed
an experi te people in Amat
ee
ere eto Liaee ee ete rd
cate
+ gear st wie rah rhs
CT en
a
ee Ce ene en
Ch metend
ot
ae
eee een
en
re ey
ple
er eee ee
Seinen rateenete eater
ne
rs
© scanned with OKEN Scanner2)The Need for EIA:RU nde
Dee ee ee eee ene
eee eee
Se GEE ong
ed
eee ee eee ets
OR en Cen
ae
Bees eta eee tee tee at
ee en Ce ets
Pad
ee
rot
ee eee etd
feos
Oe eee cn)
SE ee
eee ee
Peet cred
en ee ro
A ed
Ce Sead
ee ee en LL ros
ee enc
© scannedFTCA Sod
Deg
Sa)
Ce Ty
eed
Pett oy
Md
td
Cn
Prevent pollution and illness
Approve or modify plans
Ay
Stn
Required by government
Sy
Geet)
Example
er eete Lay
forest
ST EE cy
De CR RC
DC
Legal step before mining or
Cg
RT era eu a
ledadavatages & disadvantages of EIA
© scanned with OKEN Scannerpeepee recent ec’
eee aa
CT ceteeend
ie ee eee
@ carete
ne
Cee eta
reer irenapnerieeaaese nnn ent eay
etare
oad
aa
Cereal
eee paninerr Disarray
© parole
ed
Deets
reenneenene ent enna otic
© cnnpte
Perea reid
PP ed
es
an
peer
PE eee]
coeeatnePereneT
© carole
peer ee
Pea)
ee
oon
er co
© scannedSecu’
cr
cree
ce
ce
ees
Prenrny
ee
et naan’
a
peveaerenerer eens
Ped
Po.
oan
Oey
OT eeeteeed
Peace SnEe tte tenn
CT eenaemad
a
phate
Cael
os
as
Peed
Pepieyeee ere
a
Peet eet cee’
‘Scanned with OKEN Scannerno
Dee eee er
eee
Ree secre
Deon aud
pated
od
+ Expensive
eet)
Cans
Sed
Naas
(@ EIA helps protect he environment, but needs time, money and honest effort,
Poy
[ore aed
eee eT
ed coo
ee’ Perera
rey nae y
‘Saves money lng tem enti)
Cee ee
Cie ela) Cy
ey Ccamet pret everthingclassifications of environment impact
© scanned with OKEN ScannerCe
Cee ed
Grouping the different types of effects a project can have onthe environment.
eg
Ro Rc
eee
Peres Ctr
eerie
Se
eee
eed
De erg
BE eg eid
Rae
Dees
es
Ree a
ore
De ete
Pd
ee ene toad
Ter
Bee een os
Indirect Impacts
Rts
Pees
A ee
h OKEN ScannerDD eee
ey
See od
Cr
Beer tcs
ord
eed
rea
Sie
Oe
od
Cenc
Ce
cree
ed
Cee
oe
een oo
Cd
Se Laas
or
eee os
Deen
Pret
een
@ Example
Aeneid
Peeled
ane
ee
+ Adar changing the rive ow downstream
© scannedDeno!
il bie eee nls —
a ere Cee
od Cert ey
cy ee ce)
ey Peet Reed
Cee Ac Pee acc
fee Permanent Cee
coo red Deets
fos Cree) Cec
Cd Pee ed
»
feo] Pre a
Cd fees Ce Ca
cic mi
Pyne eee na eu
ro
[Bre
Pare eee ee ae ce
FE eeu oud
Scanned3)Indian Policies Requiring EIA:sev cnn meet
pe SenterneeT Tarr
Pte e ener
ere ee
eee
eeareie
eee ren
eee
ed
Penne
Pienemaaieneeniay
an
eee)
eer)
Se yee
rere)
ee
‘Scanned with OKEN ScannerTere ee
De ee Le
Td
COs
eer
eee ener ence eet re
Te
etry
Deer
a en et Pettey
nud,
Cd
te
ee ean eC eee)
eee ear
Oe ee ee ee eee
Ce De aa eee
Ce
en reer
CT oot etry
CEL eee eaten
© Damp:
See eet
CD nae ee)
CA eel CeCe tte
poneCa
Cd aa
Cd eed
Cea) ee ee tcd
Cod ere
ee) Coney
ened eee
Ce aerea LD Cee
Pon aey Ly
ager) ee ey
io
Ce a Ta)
Cea
PE econ
Pee neuer)
eto
Ee oad
Dd
Pee ee Dee oo ead
Cee ed
Pee aa
Nee Cee eeeImportant questionsDraft Environmental Impact Assessment (EIA) Notification, 2020
© scanned with OKEN ScannerPent)
Se er eee Ur
pe eee ee ee oT
Peers
renter ros
Cong
Deere
Pee
eT
ear
Cn
Here ae man ihn spe words:
Oe ad
ret)
roar)
ened
panier a tert tay
Pt ed
ee eC oc
rod
ee Coy
Cr
oe eee oo
Peed
ee oe ero
ed
ren
ee La
© scannedCe ioned
Sd
es
+ Cerin consrcton ects
er tay
© camps
re
Ce)
Se ere
eee
eg
ee ere ets
Cee ee ead
ee
ee a
See en)
Cee eee eed
eed
ers
Se anne
Sean
oad
ee eee ees
eed
en rn4)The EIA Cycle and Procedures :
© scanned with OKEN Scannerere)
Cente enone ets
I Steps inthe EIA Cycle (with Simple Explanation &
Example)
1. Screening
Ce
carers Torey
easier eet eterna
coy
Pane ee eee
ereeeere et eee eee ney
ee od
eterna tee entra
cone
eerie
Oe eset)
Lerner ene en
a ee nee eee
© scanned with OKEN ScannerCer ye)
Saad
eterno
coe
eee ee ene cnc
ee ey
Ce
ee
cons
cee
Ce er
Oe rat)
Dene
nee ert Ls
pare
a ne
cd
anol
omnes Pee err)
ford creerrnany Pore
ronnie) eed eee
coated deormsparcange —Aopowewthcotns5)Screening:Cee
Cee Tne
ee
eee
ee ee
ee en
Ed
ere rere
Ee ee eEeeLTS
Ad
ee er]
err
ee eee)
enn
ond
1. ear pete — Nad esa mane ponent
eer
Se eee eae
eseeneaetrrN
Cs
Sree
+ BUAig che ft Non BA ray pets st)
eer
© scanned6)Scoping:Penn
Serevent mee een Tine
eo
See eae ee eee etd
eeeereenerranearnrins
eet
ee oetrons
Rees
ni
Oe
eee eet eran’
Thay act ih pa en li pop) i be
eee eee eens
ny
(E what scoping nce:
SE ree ney
eran
eens
Cees
ee
Seen
ee
+ hese nda ten og
eee
© scannedDifferences between screening & scoping
© scanned with OKEN ScannerQ18. Write the difference between Screening and Scoping in the EIA process.
1. Screening:
Screening is the first step in the EIA process.
It helps to decide whether a project needs an EIA or not.
Itis done by E1A authorities or consultants using expert teams (engineers, ecologists,
scientists, etc.).
Itis a quick and easy method to decide if a detailed study is needed.
If the impact is likely to be significant, a full EIA is required.
2. Scoping:
Scoping is the second step in the EIA process.
It identifies the important environmental issues to focus on in the EIA study.
Ithelps in site selection, checking technical options, and avoiding delays.
It involves stakeholders, such as developers, environmental agencies, and local people.
It makes the E1A focused, flexible, and transparent, and improves public understanding.
© scanned with OKEN Scannerpe Lt eto ce
‘Screening and Scoping are two different steps in the EIA process.
De rd
Doe CC Loge
Lt esas
CR oe
Sed
Len a patie Caicos
Pos
Se sac
Rog
OD enc eee
Rotten
Ct Eee
ecu
Seer EE ere cea
Se eos
eS
Cee
Paes
Sen Las
|
Oe utes
@ scanned with OKEN ScannerPod
ed
Sooping means
ee eet Te
eet ery
Pees
Ce En od
Cod
Sree er
nd
oa
Cerny
tc
Prod
eee cerns
ey
ed
ey
Perio)
ed
Ded
Cee
acd
aeeeert
eet]
Sad
eed
omens)
ed
od od
poet een
heen eg ed
coed
co
Pee) een7)Baseline Data:Eee
ee reer
Prstanenaeneneisonaesr any
Re ean
eee en es
See
See
Setter
ae ee
etn
ceed
oon
oe eer)
Se ern
ee
ees
Se eae)
+ Nolet 55 48 fm)
See eee
ee ects
Ce eee ee ety
Paes eaneee er Tarn
ond
ret pad tno eg conons
© scanned8)Ilmpact Prediction:enn
Sere eane ety
Pamaienmnnneery
imple Detnton:
Eleanore tioamaatetiond
Pal seaancanuersncserinteteir strana
Cees
eee eee
ee er et Tey
St eed
oe
eee
es
eee ed
ey nn
nom ee eter)
Ce ee
eee nd
eens
+ tet fer eter
ee
© scanned
ith OKEN ScannerSeu al)
Tr Answer
Red Estimating how a project will affect the environment
Peed SO eg eS
Dee ECR Ltd od Rd
Dr Cad Te Rect a ore)
OKEN Scanner9)Assessment of Alternatives:
© scanned with OKEN ScannerSe cement ry
Se eubbanasieet oneal
od
Seapets tea
ee
eer
+ Topo commuter and
ee aed
Soren)
framerees
eee eeen
en
Seen
oe
ete
ee ene
ee eens
ce
© scanned10)Delineation of Mitigation Measure:
© scanned with OKEN ScannerDee et eG
Cee ee ee ete
eee ees
ead
TT aserieabicteeaba eat ae)
rae saree caren
OL
ee ey
Se nd
OR ee eee ood
Bn no
ol ood
Coan ange ela ret
een rod
oe a
roe eet)
Py eed
aan coy
Sn Lae od
od ceed
coed eee
© scannedWhat is delineation? OR What is the necessity of delineation of study areas for EIA?
© scanned with OKEN Scannerern
ee ee ee
aod
See
eee
mene
reenter
ee erret rr
ene)
et)
eer eer)
1 oyu eet (re ocean 0nd nd pet
Ce)
Peed
Ce
eee
end
ens
enor
@ boro:
Cero
reer
© scannedCe ng
Eee eee
Oe et Coe te Geena
ad
SG a ete rd
See rg
ey
ort eet ee te try
ee ag cree
short Definition:
Ce Te hae een Lent y
Pe eee ences
sens
Cad
Seer
Sean
STR)
ee eed
ard
Det ee ny
fa
CT ee een ee eee11)EIA Report(or)audit report:tr od
ene ee toy
a
ety
Se ed
ree eet ey
ed
tee eet
ranean nen eC ee et
coe
Peed
ener ior
ee
pane
eee
pear renanes
Sercacomneen
Cee od
eee
ed
eee ecg
eee
ee
er eer Cry
freereg ed
Serer ay
Ce Ra Mee
Been ee ee te eA ny
Se ee ee me Ra
+ Mitigation: Dust filters, noise barriers, rainwater harvesting
Te a eR aes ee eRe eee oll
SRP eo Un eC
Dos cl
TE ee ee ean eco s
CSU cr eine io
Oe CT teni We OSU Le
DR ee ca
Sea
Cy Cd oO
ever One r ey
en ees
Wo reat? Goverment publ and deconnokera
Cet Tohelp in making eco friendly decisionsDae
eee
pesherieenenatey eeesree reer)
ME Simple Dot:
TE oriedennenrietesubterencied
peaenesreprormenedenaserwenneueion Sete tee
Petrie
eos
+ Tomgoet as oven on anf ne sere
en
Deen
Pee ee rad
ees
ee eee
nn eterna
© scannedYEU ba rtd
Se og oie ed
Ore aT)
Se notary
Se enue |
BS ah
pone
SNe en Cou ame eta
Coun
Se ete ad
Ree et ed
Ce ett
© scanned y12)Public Hearing:eee een te ed
Coreen
ee ened
een tees
Po
een
at ree eenameer
Pereeeertey
ee ee aed
ao
Seer ere eran
eas
eee eens
Ped
Serene)
ce ered
© scanned@ Simple Example Recap:
Pa es eee ACS Oa RUC eh Ue
HE A notice goes out: Public hearing on August 1st.
| Be each Mo aR UC ee
| Mennurks NAT eek ot R el cele meek UU Reel e
i Officials record these concerns.
i The committee considers these points before giving approval.
LAD aSe eau elie
V Gives transparency
VAs ee Ta Cy
VAN ee em MEM Ue yImportantance, processdure, adavatages & disadvantages
© scanned with OKEN Scanner‘030. Discuss the Importance, procedure, advantages and disadvantages ofthe public hearing
process nA
OD paswer
© importance of Public Hearing in EIA (fevronmentalknpact Assessment)
Pic hearings forms meeting where peple cn give ther opinions and suggestions about 3
proposed development project.
Ie isimportant because:
4. Publecan ave concerns aout the projet
2. people can atk questions ad get larfations.
2 Mewistes oes cn beefed.
4 theps in fang solutions to problems ear
5. Iincresses publ awareness and involvement
© Procedure of Public Heading
1. ube meetings or hearing are arange atthe project ste,
2. Advertisements ae pushed in newspapers to nfm the public
3, Pubic aes thelr opnions, feedback, and suggestions.
4 aa colts through surveys, hotlines or advisor cound
5. Publcinput i anayaed and sto decston-making autores.
© pavantages
1. Inreses publeawarenes about enironmental impacts
2. Hepsunderstand problems rom ea people's point of view.
3. Encourages community partpation a environmental protection,
4. teaes inks for ature olaboratin (¢8, wth educators or ocal NGOS
5. Helps in beter decison making for sustansble development
6. Promotes poste environmental behaviour among cies.
© Disdeantages
1. Some people maybe uniting attend or may not be interested.
2. The process canbe time-consuming and needs planning
2, Mein noiation an survey preparation ar needed
4. Sometimes, ts tcl to expan technical sues tothe publ
5. Public opinians may delay approval or cause oppesion tothe projet.
© scanned with OKEN Scanner13)Decision Making:nt
Pha
Pere eee rd
eomeaneesereenyter teeter tein]
td
ey
ny
Sr enn
Cents
peer tnt eterna s
ee
Peed
eee ee ee ee ed
nang es oaityooe
Beene
ed
eee
eects
oe
cron
ees
ene
eee nr eens
eanpe
aero
Soe
ees
eee
etn er rr
Ce ee eee cent ate
© scannedOn
Seu eo ots
eens
Seed
ae Tey
Coy
ret
Ge ne eee ae ees Len oe
ae
eu aoe
ny
ead
ea
i Issue Environmental Clearance if approved
Pee
Sa
Dente
Ved
Pe a
Vr)
© scanned with o
(EN Scanner(@36, What ae the steps Involved Inthe EIA clearance process?
on
‘Write an account on the procedure for Environmental Clearance (EC to developmental projects
Environmental Clearance (EC) is equired before stating any major project to ensure Iwill not harm
‘the envronment. It le made mandatory under the Enuvonment Protection Act, 1986.
© Aimot ec:
Tocheck how 9 proposed proc aft:
+ Theenvronment {a water, sol tc)
+ Human ag arial fe
‘Are. reduce the negative Impacts 2s much as possible.
1 steps in Enviconmental Clearance (Ec Process:
4 Sereoning
© Checks the project needs environmental dearance oot
(© Based on project st, oeaon, and ype
2. Scoping
‘© Usts the kay environmental sues to study nA
(© Terms ofRlerence (To) are prepared forthe EIA tidy.
3. UA Report Preparation
‘9 The Emdeonmental impact Assessment (EA I conducted
‘0 tncudes data on ar water land, nose, bosversty ete
Suggests mitigation measures to reduce harm.
4. Public consuitation / Public Hearing
‘2 Theloca people ghe ther oplnions and concerns about the projet
(9 Thee feedbacks included inthe ial report
5. Appraisal
©. xert Appr Commitee (EAC) reviews the EA report an publ hearing deals
Check fal envionmertal les and gldenes ae followed.
6. vironmental clearance (EC)
Based on the EAC’ recommendation, the government grants or rejects EC,
> fapproved, the project can bein with onditans to protact the environment.
© Scanned with OKEN Scanner14)Monitoring the Clearance Conditions:
© scanned with OKEN Scanner