Description
Item
Footing Column RRM Slab Staircase
Cement / (bag) 86.6 54.3 116.7 355.5 33.5
Sand / (cube) 1.01 0.61 2.62 3.99 0.38
Metal (20mm) / (cube) 1.78 1.22 7.98 0.74
Metal (40mm) / (cube) 0.24 0.01
T16 / (bar) 31.2 18.9
T12 / (bar) 37.8 47.0 28.3
T10 / (bar) 11.5
T8 / (bar) 91.3
T6 / (bar)
Rubble (225mm×150mm) / (cube) 5.24
Brick (20.5cm×9.5cm×7.5cm) / (No.)
ription
Beam Wall Total
129.2 624.2 1,400
1.4 17.5 27.6
2.9 14.6
0.25
38.4 88.5
88.8 201.9
11.5
138.0 229.2
91.7 91.7
5.24
29,722 29,722
Footing
F2
F1
Number of footings = 3
Length = 900 mm
Width = 900 mm
Number of footings = 9 Height = 300 mm
Length = 1,500 mm
Width = 1,500 mm
Height = 400 mm
Screed Concrete = 1.134 m3
Cement = 0.113 m3 7.14 bags
Sand = 0.340 m3 0.12 cubes
Metal (40mm) = 0.680 m3 0.24 cubes
Base Concrete = 8.829 m3
Cement = 1.261 m3 79.46 bags
Sand = 2.523 m 3
0.89 cubes
Metal (20mm) = 5.045 m 3
1.78 cubes
Base Reinforcement =
T12 (F1) = 202.5 m 33.75 bars
T12 (F2) = 24.3 m 4.05 bars
Column
C1 C2
Number of columns = 9 Number of columns = 12
Length = 300 mm Length = 225 mm
Width = 300 mm Width = 225 mm
Height = 4,800 mm Height = 3,300 mm
Concrete = 6.029 m3
Cement = 0.861 m3 54.26 bags
Sand = 1.723 m 3
0.61 cubes
Metal (20mm) = 3.445 m3 1.22 cubes
Reinforcement =
T16 (C1) = 187.2 m 31.2 bars
T12 (C1) = 93.6 m 15.6 bars
T8 (C1) = 312.0 m 52.0 bars
T12 (C2) = 188.4 m 31.4 bars
T8 (C2) = 235.5 m 39.3 bars
Random Rubble Masonry
Width = 350 mm
Height = 750 mm
1 15,000 mm
2 11,100 mm
3 15,000 mm
4 10,500 mm
5 5,025 mm
6 3,300 mm
7 5,025 mm
8 3,300 mm
9 3,000 mm
10 3,000 mm
11 3,300 mm
12 1,800 mm
13 1,800 mm
14 1,800 mm
15 3,150 mm
16 3,150 mm
17 2,475 mm
RRM = 24.078 m3
Cement = 1.852 m3 116.68 bags
Sand = 7.409 m 3
2.62 cubes
Rubble (225mm×150mm) = 14.817 m 3
5.24 cubes
Slab / Floor
Ground Floor Slab First Floor Slab
Thickness = 100 mm Thickness = 100 mm
Floor Area = 170 m2 Floor Area = 55 m2
Floor
Thickness = 100 mm
Floor Area = 170 m2
Concrete = 39.500 m3
Cement = 5.643 m3 355.50 bags
Sand = 11.286 m3 3.99 cubes
Metal (20mm) = 22.571 m3 7.98 cubes
Reinforcement =
T10 = 2,250 m 375.0 bars
Stair Case
Base Column
Thickness = 200 mm Length = 225 mm
Width = 1,000 mm Width = 225 mm
Length = 1,000 mm Height = 1,000 mm
Steps Landing
Riser = 150 mm Length = 900 mm
Width = 300 mm Width = 1,800 mm
Length = 3,354 mm Height = 150 mm
Screed Concrete = 0.050 m3
Cement = 0.005 m3 0.32 bags
Sand = 0.015 m 3
0.01 cubes
Metal (40mm) = 0.030 m 3
0.01 cubes
Concrete = 3.682 m3
Cement = 0.526 m3 33.14 bags
Sand = 1.052 m3 0.37 cubes
Metal (20mm) = 2.104 m3 0.74 cubes
Reinforcement =
T12 (B & C) = 24.8 m 4.1 bars
T16 (C) = 11.4 m 1.9 bars
T12 (S) = 80.5 m 13.4 bars
T16 (S) = 80.5 m 13.4 bars
T10 (S) = 69.0 m 11.5 bars
T12 (L) = 64.8 m 10.8 bars
T16 (L) = 21.6 m 3.6 bars
Beam
Tie Beam Wall Beam 1
Width = 225 mm Width = 300 mm
Height = 225 mm Height = 400 mm
Wall Beam 2
Width = 225 mm
Height = 300 mm
Concrete = 14.354 m3
Cement = 2.051 m3 129.19 bags
Sand = 4.101 m 3
1.45 cubes
Metal (20mm) = 8.202 m 3
2.90 cubes
Reinforcement =
T12 (TB) = 366.9 m 61.2 bars
T16 (W1) = 230.4 m 38.4 bars
T12 (W2) = 165.8 m 27.6 bars
R6 (TB) = 550.4 m 91.7 bars
T8 (W1) = 537.6 m 89.6 bars
T8 (W2) = 290.2 m 48.4 bars
Wall
Ground Floor First Floor
Total Length= 91,725 mm Total Length= 39,115 mm
Wall 341.800 m2
Cement = 9.907 m3 624 bags
Sand = 49.536 m3
17.50 cubes
Brick (20.5cm×9.5cm×7.5cm) = 29,722 No. 29,722 No.