7. ALL REINFORCING FIXING TO BE INSPECTED BY
THE ENGINEER PRIOR TO CASTING OF CONCRETE.
A A 8. SIX CUBES TO BE TAKEN PER POUR.
EXISTING FIRST FLOOR SLAB
THREE TO BE TESTED AT SEVEN DAYS, THE
3360 o/a steel angle
3015 o/a steel angle REMAINDER AT TWENTY EIGHT DAYS. THE RESULTS
180 500 500 500 500 500 500 180 TO BE FORWARDED TO THE ENGINEER.
200 500 500 500 500 500 315 M20 chemical anchors @ 500mm centres as shown. 9. CONTRACTOR TO CONSTRUCT A BLINDING LAYER
M20 chemical anchors @ 500mm centres as shown.
185
IF SOIL CONDITIONS RESULT IN REINFORCEMENT
I.J.
See chemical anchor specification. (Typical)
10
140
I.J.
500
500
a Slab Infilll Steel Support Angle : a
ll p
i ll p
i
A MINIMUM OF FIVE DAYS.
in f 100x100x10L welded to A in f
500
a
500
Slab Infilll Steel Support Angle : sl s 100x100x10mm thk. flat with
100x100x10L welded to r .c. n gle 6mm full penetration bevel weld .r c. ngle ALL LOAD BEARING BRICKWORK TO BE 14MPa NFX.
) a a) el a TOP OF ALL BRICKWORK TO RECEIVE 2 LAYERS OF
P a te e l
10380
10380
P
2870
500
2780
100x100x10mm thk. flat with fixed to the side of the existing r.c. slab M te
500
M
25 s (2 5 o n s 3 PLY MALTHOID ON SMOOTH RENDERED SURFACE.
6mm full penetration bevel weld k . ( d on with M20 chemical anchors. .
th k rte d
t h te 12. ALL SINGLE SKIN BRICKWORK TO BE STOPPED 2
m p or m
500
fixed to the side of the existing r.c. slab See chemical anchor specification. o
500
m A A 5m u pp A A COURSES BELOW SOFFIT OF SLAB AND COMPLETED
with M20 chemical anchors. 2 5 5 su
p
A Soffit of steel angle @ +1352,550 lvl. w
2 5 s A AFTER PROPS HAVE BEEN REMOVED.
ew Ne
500
See chemical anchor specification. (Typical).
500
N
Soffit of steel angle @ +1352,550 lvl. 13. ALL CONCRETE PLASTER AND BRICKWORK PLASTER
INTER-FACES TO RECEIVE V-JOINTS.
(Typical).
I.J.
I.J.
10
10
14. THE ENGINEER REQUIRES 24HRS NOTICE FOR ALL
185
140 INSPECTIONS.
200 500 500 500 500 500 315
3005 o/a concrete slab 10
180 500 500 500 500 500 500 180
3015 o/a steel angle I.J. 2510
3350 o/a concrete slab 10
EXISTING FIRST FLOOR SLAB I.J.
3360 o/a steel angle 2040
3780
3780
125 5400 5400
A A
REV DESCRIPTION BY DATE
O O J J
3 4
9 10 T1 FOR TENDER PURPOSES S.A. 24/06/2020
R.C. SLAB INFILL PANEL ON EXISTING FIRST FLOOR R.C. SLAB INFILL PANEL ON EXISTING FIRST FLOOR
CL CL CL
anchor anchor anchor
PROJECT
500 500 500 500 10mm deep x 10mm wide
centres centres 'Dow Corning 813C' silicone UMALUSI OFFICES
typical typical
All structural steel angles and flats New 255mm thk. (25MPa)
sealant (or equally approved) ADDITIONS AND ALTERATIONS
on 10mm thk. polystyrene backing.
100 to be grade S355JR hot-dipped r.c. slab infill panel
First floor t.o.c. Existing first floor slab. galvanised to ISO 1461 or EN 10240. supported on steel angles. First floor t.o.c. Existing first floor slab.
50 50 DETAILS
@ + 1352,805 lvl. @ + 1352,805 lvl.
EXISTING MAIN BUILDING
55
55
NEW R.C. SLAB IN-FILL PANELS
50 50
100
100
CL CL
ON THE EXISTING FIRST FLOOR SLAB
255
255
50
200
255
150
200
150
100
Slab Infill Steel Support Angle : 100x100x10mm thk. flat fixed to the side of the
100x100x10L welded to existing r.c. slab with 1 No. M20 chemical anchor. Slab Infilll Steel Support Angle : 100x100x10mm thk. flat fixed to the side of
100x100x10mm thk. flat with 100x100x10L welded to r.c. slab with 1 No. M20 chemical anchor.
6mm full penetration bevel weld.
Soffit of steel angle @ +1352,550 lvl.
TYPICAL ELEVATION See chemical anchor specification.
100x100x10mm thk. flat with See chemical anchor specification.
6mm full penetration bevel weld
R.C. SLAB INFILL PANEL fixed to the side of the existing r.c. slab
with M20 chemical anchors.
SUITE 106, ESSENVIEW BUILDING, STRATHMORE PARK,