The document outlines the construction specifications and responsibilities for a 500kg freight elevator project, emphasizing the importance of site verification and adherence to architectural plans. It details the materials and structural components required for the elevator's construction, including dimensions and safety considerations. The contractor is required to consult with the architect for any modifications and ensure compliance with all specifications to avoid additional costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views4 pages

Elevator Project

The document outlines the construction specifications and responsibilities for a 500kg freight elevator project, emphasizing the importance of site verification and adherence to architectural plans. It details the materials and structural components required for the elevator's construction, including dimensions and safety considerations. The contractor is required to consult with the architect for any modifications and ensure compliance with all specifications to avoid additional costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROJECT: INDEX SHEETS

NUMBER

500KG FREIGHT ELEVATOR


NAME SHEET
LAMINA

L-0 Cover Project Elevator


IT IS THE RESPONSIBILITY OF THE BUILDER TO MAKE A PREVIOUS SITE VISIT TO VERIFY THE CURRENT CONDITIONS, AND TO TAKE INTO ACCOUNT L-1 Assembly and Sizing of Internal Elevator Cage
CONSIDERATION: L-2 Design of External Structure of Elevators
1-VERIFY ALL DIMENSIONS ON SITE BEFORE CONSTRUCTION.
The model and location of the wiring must be reviewed with electrical plans.
L-3 Structural Details of the Work
The structure of the cage's ceiling must be made according to the design.
4 DIMENSIONS IN METERS, UNLESS OTHERWISE INDICATED IN PLANS.
5- THE ARCHITECTURAL PLANS TAKE PRECEDENCE, ANY DIFFERENCE IN DIMENSIONS MUST BE CONSULTED WITH THE DESIGNER.
6- THE GENERAL CONTRACTOR SHALL BE OBLIGED TO REQUEST ANY MISSING INFORMATION IN THESE PLANS FROM THE ARCHITECT WITHOUT
THIS SHALL NOT GENERATE ANY ADDITIONAL COSTS TO THE CONSTRUCTION CONTRACT BY THE BUILDER
GENERAL CONTRACTOR AND THE OWNER. PAINTING NOTE:
7- UNDER NO CIRCUMSTANCES AND AT NO TIME WILL THE GENERAL CONTRACTOR PROCEED TO ELABORATE ANY TYPE OF
CONSTRUCTION DUE TO LACK OF DETAILS IN THE PLANS AND SPECIFICATIONS WITHOUT THE APPROVAL OF THE ARCHITECT.
8- THE CONTRACTOR MUST VISIT THE WORK SITE, VERIFY AND CONFIRM ALL EXISTING CONDITIONS AND SITUATIONS THAT
DTM type paint should be applied by airless.
THEY CAN AFFECT THE CONSTRUCTION PROCESS AND MUST INCLUDE AND CONSIDER THESE COSTS IN YOUR PRICE PROPOSAL. APPROVED BY INSPECTOR. COLOR TO BE CHOSEN BY CLIENT.
9- THE CONCERNS, DOUBTS, OR POSSIBLE INFORMATION FAILURES THAT THE CONTRACTOR BELIEVES EXIST DURING THE PROCESS OF
BIDDING SHOULD BE CONSULTED WITH THE ARCHITECT, UNDER NO CIRCUMSTANCES SHOULD SOLUTIONS OR ANSWERS BE ASSUMED.
APPROVED. ALSO CARRY OUT PAINT ADHERENCE TESTS
10- ANY MODIFICATION THAT THE CONTRACTOR OR OWNER WISHES TO SUGGEST OR MAKE DURING THE EXECUTION PERIOD OF THE WORK TO APPLIED
DESIGN OR MATERIALS CONTAINED IN THE APPROVED PLANS MUST BE SUBMITTED IN WRITING TO THE ARCHITECT AND WILL ONLY BE DONE WITH
YOUR APPROVAL.
THE ENTIRE STRUCTURE MUST BE PAINTED
Bolted metal plate
with 12mm bolts where
a rod will be welded like
hook grip point TABLE OF PROFILES TO USE

1.27

Mallado Jordomex united 3" x 3" cross-shaped tubes L-shaped iron 100 x 100 x 6
frame and tubes 3" x 3" like soldiers to Marco mm (4" x 1/4") x 6 meters
0.59 protection against falling parts of the load
from 2nd level objects
3
L-3 3" x 3" tube frame with joints
soldiers at a 45° angle 2-) Square galvanized iron structural pipe 3" x 3"
(72 x 72 x 1.50 mm) 6 meters
0.59

Rotating wheels
fixed laterally
Structural square black iron tube 4" x 4"
with clamps (100 x 100 x 1.80 mm) 6 meters
1.40 screwed to tube

Structural tube 3" x 3"


as support in the 4 4-) Rectangular black iron structural tube 2" x 3"
corner points of the (48 x 72 x 1.50 mm) 6 meters
frame of the cage

Structural Plant Cage Grip


5-) Beam WF 6" x 12 lb/foot x 40 feet, A992 Grade 50
SCALE 1 : 25

Rectangular tube 2" x 3" for


access gate structure
lined in mesh Jordomex
0.59 0.59 4
L-3
Welded hinge to tube
3" x 3" con aletas para
0.61 0.61 access gates

Metal base plate


1.40m x 1.40m x 6mm
non-slip
Level 3 7.39 Level 3 7.39

Light wall Light wall


existing at 2nd level existing on the 2nd level
1.20

Wall cavity Wall cavity


for access in for access to
2nd level 2nd level

Block wall Block wall


of concrete of concrete

Level 2 3.48
Level 2 3.48

6
L-3
Beam WF of WF beam of
existing mezzanine existing mezzanine

Concrete beam Concrete beam


existing existing

Column of Column of
existing concrete existing concrete

Level 1 0.00 Level 1 0.00

Isometric Elevator on Level 1 Isometric Elevator on Level 2 Elevation Access 1 Elevation Access 2
SCALE SCALE SCALE 1 : 50 SCALE 1 : 50

1.74 0.26
Uplift of the brace
1.33

TABLE OF PROFILES TO USE

1-) Angle iron 100 x 100 x 6 mm (4" x 1/4") x 6 meters


0.64
1.56

2-) Square galvanized iron structural tube 3" x 3" (72 x 72 x 1.50 mm) 6 meters 0.65

1
Base structure for 0.07
Winch fixed to WF beam with
Lightened slab 2nd floor Lightweight Wall 2nd floor
bolts and welding 0.12
0.26 0.03

Beam WF 6 x 12 x 40
0.20 0.16 0.25

0.05

threaded rod or bar Existing WF beam Tube 3" x 3" x 1.50mm


• Voltaje: 220V a 60Hz;
Metal plate of folded in the shape of in the mezzanine
Motor: Single-phase
Capacity: 1 ton or 2200 pounds 16 x 16 x 1cm welded arch to plate Tubo cuadrado 3 x 3 x 1.50 mm
Basket: 150 Kg
Load: 150
metallica
Lift height: 6 m or 20 feet
Lifting speed: 3.9 meters per Metal plate
minute
Power: 0.65 kw screwed to a beam Hinge
Electric hoist Remote control: Up and Down and Stop
of brand chain Emergency. 20 x 20 x 1 cm
Prowinch, Model
PWHF1000i 1
Tonne Galvanized chain 1/4" grade 30
Bolts screwed to cross of
Beam WF 6 x 12 x 40
3" x 3" tubes from the cage ceiling
Plate screwed to beam 10 x 10 x 1 cm Tube 2" x 3" x 1.50 mm

0.60 0.60

0.10

0.10 0.10

0.07 Square tube 4 x 4 x 1.80 mm

0.26 0.07

0.10 0.10
1.26

Corrugated steel plate like


Tube 4" x 4" x 1.80mm base of the basket of the cage
Rotating wheels
Tube 3" x 3" x 1.50mm
laterally fixed Angular 100 x 100 x 6mm

Rectangular tube 2 x 3 x 1.50 mm