Pile Capacity via SPT Method

This document determines the pile capacity for a 450mm diameter pile using the SPT value method. It provides the borehole SPT values with depth, calculates the shaft and base resistances, and determines the short-term and long-term geotechnical capacities. The maximum pile capacity is determined to be 955kN based on a pile length of 15m from the cutoff level.

Uploaded by

KTMO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

Topics covered

  • average shearing resistance,
  • construction standards,
  • BCA limitations,
  • engineering calculations,
  • highrise building,
  • structural integrity,
  • cutoff level,
  • site investigation,
  • foundation stability,
  • load factors
0% found this document useful (0 votes)
151 views9 pages

Pile Capacity via SPT Method

This document determines the pile capacity for a 450mm diameter pile using the SPT value method. It provides the borehole SPT values with depth, calculates the shaft and base resistances, and determines the short-term and long-term geotechnical capacities. The maximum pile capacity is determined to be 955kN based on a pile length of 15m from the cutoff level.

Uploaded by

KTMO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

Topics covered

  • average shearing resistance,
  • construction standards,
  • BCA limitations,
  • engineering calculations,
  • highrise building,
  • structural integrity,
  • cutoff level,
  • site investigation,
  • foundation stability,
  • load factors

Determination of pile capacity using SPT value method

Bore Hole No : BH - 1
Diameter of Pile (mm) 450 fcu (N/mm2) 35

J TITLE ALEXANDRA LINK WAY

Limitation

Level SPT
3.5 14 1 - 1.5
6.5 14 2 - 4.5
9 24 3 - 7
12 29 4 - 10
15 84 5 - 13
18 100 6 - 16
21 100 7 - 19
24 100 8 - 22
25 100 9 - 23
26 100 10 - 24

BCA's limitation
Base resistance = 9000 kN/m2 for Normal Building
Base resistance = 7500 kN/m2 for Highrise Building

SPT (N) value for base resistance should not be greater than 100
Determination of pile capacity using SPT value method 8-Jul-19
Job Title : ALEXANDRA LINK WAY
Bore Hole No: BH - 1
Diameter of Pile: mm
Primeter area of the shaft = pi x 0 x h = 1.41h m2
Ultimate load carried by pile = shaft resistance + base resistance
shaft resistance = perimeter area of shaft x average value of shearing resistance per unit area
= As.fs (where fs = 2N Limited to 250 )
Base resistance = Ab.qf
qf = 12N(Db/B) <= 200N or limited to 9000 KN/m2

Level Depth SPT SPT fs Shaft resistance Cumulative shaft Remarks


in m in m (h) (N) (Average) 2N = fs.As Resistance
3.5 14
3 14 28 119 119 -
6.5 14
2.5 19 38 134 253 -
9 24

Qs = 253 KN

Base resistance = Ab.qf


qf = 12N (Db/B) or 200N limited to 9000 KN/m2
= 12 x 24(2.5/0) or 200N limited to 9000 KN/m2
= 1600 or 4800 limited to 9000 KN/m2

Base resistance = 254.469 KN

a) Geo technical capcity = Qs/2.5 + Qb/2.5


(short Term)
= (253 + 254) /2.5
= 203 KN

b) Geo Technical Capacity = Qs/1.5 + Qb/3.0


(long term)
= 253/1.5 + 254/3.0
= 253.5 KN

c) Structural Capacity of Pile = 0.21 x fcu x Ac


= 0.21 x 35x pi^2/4/10^3
= 1169 KN

Pile safe working load = 203 KN

Total Length of the Pile = 9 m


from cutoff level
Determination of pile capacity using SPT value method 8-Jul-19
Job Title : ALEXANDRA LINK WAY
Bore Hole No: BH - 1
Diameter of Pile: mm
Primeter area of the shaft = pi x 0 x h = 1.41h m2
Ultimate load carried by pile = shaft resistance + base resistance
shaft resistance = perimeter area of shaft x average value of shearing resistance per unit area
= As.fs (where fs = 2N Limited to 250 )
Base resistance = Ab.qf
qf = 12N(Db/B) <= 200N or limited to 9000 KN/m2

Level Depth SPT SPT fs Shaft resistance Cumulative shaft Remarks


in m in m (h) (N) (Average) 2N = fs.As Resistance
3.5 14
3 14 28 119 119 -
6.5 14
2.5 19 38 134 253 -
9 24
3 26.5 53 225 478 -
12 29

Qs = 478 KN

Base resistance = Ab.qf


qf = 12N (Db/B) or 200N limited to 9000 KN/m2
= 12 x 29(5.5/0) or 200N limited to 9000 KN/m2
= 4253.33 or 5800 limited to 9000 KN/m2

Base resistance = 676.463 KN

a) Geo technical capcity = Qs/2.5 + Qb/2.5


(short Term)
= (478 + 676) /2.5
= 461.7 KN

b) Geo Technical Capacity = Qs/1.5 + Qb/3.0


(long term)
= 478/1.5 + 676/3.0
= 544.0 KN

c) Structural Capacity of Pile = 0.25 x fcu x Ac


= 0.25 x 35x pi^2/4/10^3
= 1391.63 KN

Pile safe working load = 462 KN

Total Length of the Pile = 12 m


from cutoff level
Determination of pile capacity using SPT value method 8-Jul-19
Job Title : ALEXANDRA LINK WAY
Bore Hole No: BH - 1
Diameter of Pile: 450 mm
Perimeter area of the shaft = pi x 0 x h = 1.41h m2
Ultimate load carried by pile = shaft resistance + base resistance
shaft resistance = perimeter area of shaft x average value of shearing resistance per unit area
= As.fs (where fs = 2N Limited to 250 )
Base resistance = Ab.qf
qf = 12N(Db/B) <= 200N or limited to 9000 KN/m2

Level Depth SPT SPT fs Shaft resistance Cumulative shaft Remarks


in m in m (h) (N) (Average) 2N = fs.As Resistance
3.5 14
3 14 28 119 119 -
6.5 14
2.5 19 38 134 253 -
9 24
3 26.5 53 225 478 -
12 29
3 56.5 113 479 957 -
15 84

Qs = 957 KN

Base resistance = Ab.qf


qf = 12N (Db/B) or 200N limited to 9000 KN/m2
= 12 x 84(6/0) or 200N limited to 9000 KN/m2
= 13440 or 16800 limited to 9000 KN/m2

Base resistance Qb = 1431.39 KN

a) Geo technical capcity = Qs/2.5 + Qb/2.5


(short Term)
= (957 + 1431) /2.5
= 955 KN

b) Geo Technical Capacity = Qs/1.5 + Qb/3.0


(long term)
= 957/1.5 + 1431/3.0
= 1115.2 KN

c) Structural Capacity of Pile = 0.21 x fcu x Ac


= 0.21x 35x pi^2/4/10^3
= 1169 KN

Adopt pile working load as = 955 KN

Total Length of the Pile from = 15 m


cutoff level
Determination of pile capacity using SPT value method 8-Jul-19
Job Title : ALEXANDRA LINK WAY
Bore Hole No: BH - 1
Diameter of Pile: mm
Perimeter area of the shaft = pi x 0 x h = 1.41h m2
Ultimate load carried by pile = shaft resistance + base resistance
shaft resistance = perimeter area of shaft x average value of shearing resistance per unit area
= As.fs (where fs = 2N Limited to 250 )
Base resistance = Ab.qf
qf = 12N(Db/B) <= 200N or limited to 9000 KN/m2

Level Depth SPT SPT fs Shaft resistance Cumulative shaft Remarks


in m in m (h) (N) (Average) 2N = fs.As Resistance
3.5 14
3 14 28 119 119 -
6.5 14
2.5 19 38 134 253 -
9 24
3 26.5 53 225 478 -
12 29
3 56.5 113 479 957 -
15 84
3 92 184 780 1737 -
18 100

Qs = 1737 KN

Base resistance = Ab.qf


qf = 12N (Db/B) or 200N limited to 9000 KN/m2
= 12 x (11.5/0) or 200N limited to 9000 KN/m2
= 30667 or 20000 limited to 9000 KN/m2

Base resistance Qb = 1431.39 KN

a) Geo technical capcity = Qs/2.5 + Qb/2.5


(short Term)
= (1737 + 1431) /2.5
= 1267.5 KN

b) Geo Technical Capacity = Qs/1.5 + Qb/3.0


(long term)
= 1737/1.5 + 1431/3.0
= 1635.4 KN

c) Structural Capacity of Pile = 0.21 x fcu x Ac


= 0.21 x 35x pi^2/4/10^3
= 1169 KN

Adopt pile working load as = 1169 KN

Total Length of the Pile from = 18 m


cutoff level
Determination of pile capacity using SPT value method 8-Jul-19
Job Title : ALEXANDRA LINK WAY
Bore Hole No: BH - 1
Diameter of Pile: mm
Primeter area of the shaft = pi x 0 x h = 1.41h m2
Ultimate load carried by pile = shaft resistance + base resistance
shaft resistance = perimeter area of shaft x average value of shearing resistance per unit area
= As.fs (where fs = 2N Limited to 250 )
Base resistance = Ab.qf
qf = 12N(Db/B) <= 200N or limited to 9000 KN/m2

Level Depth SPT SPT fs Shaft resistance Cumulative shaft Remarks


in m in m (h) (N) (Average) 2N = fs.As Resistance
3.5 14
3 14 28 119 119 -
6.5 14
2.5 19 38 134 253 -
9 24
3 26.5 53 225 478 -
12 29
3 56.5 113 479 957 -
15 84
3 92 184 780 1737 -
18 100
3 100 200 848 2586 -
21 100

Qs = 2586 KN

Base resistance = Ab.qf


qf = 12N (Db/B) or 200N limited to 9000 KN/m2
= 12 x (14.5/0) or 200N limited to 9000 KN/m2
= 38667 or 20000 limited to 9000 KN/m2

Base resistance = 1431.39 KN

a) Geo technical capcity = Qs/2.5 + Qb/2.5


(short Term)
= (2586 + 1431) /2.5
= 1606.8 KN

b) Geo Technical Capacity = Qs/1.5 + Qb/3.0


(long term)
= 2586/1.5 + 1431/3.0
= 2200.9 KN

c) Structural Capacity of Pile = 0.21 x fcu x Ac


0.21 x 35x pi^2/4/10^3
1169 KN

Pile safe working load = 1169 KN

Total Length of the Pile = 21 m


from cutoff level
Determination of pile capacity using SPT value method 8-Jul-19
Job Title : ALEXANDRA LINK WAY
Bore Hole No: BH - 1
Diameter of Pile: mm
Primeter area of the shaft = pi x 0 x h = 1.41h m2
Ultimate load carried by pile = shaft resistance + base resistance
shaft resistance = perimeter area of shaft x average value of shearing resistance per unit area
= As.fs (where fs = 2N Limited to 250 )
Base resistance = Ab.qf
qf = 12N(Db/B) <= 200N or limited to 9000 KN/m2

Level Depth SPT SPT fs Shaft resistance Cumulative shaft Remarks


in m in m (h) (N) (Average) 2N = fs.As Resistance
3.5 14
3 0 0 0 0 -
6.5 14
2.5 19 38 134 134 -
9 24
3 26.5 53 225 359 -
12 29
3 56.5 113 479 838 -
15 84
3 92 184 780 1619 -
18 100
3 100 200 848 2467 -
21 100
3 100 200 848 3315 -
24 100

Qs = 3315 KN

Base resistance = Ab.qf


qf = 12N (Db/B) or 200N limited to 9000 KN/m2
= 12 x (17.5/0) or 200N limited to 9000 KN/m2
= 46667 or 20000 limited to 9000 KN/m2

Base resistance = 1749.47 KN

a) Geo technical capcity = Qs/2.5 + Qb/2.5


(short Term)
= (3315 + 1749) /2.5
= 2025.9 KN

b) Geo Technical Capacity = Qs/1.5 + Qb/3.0


(long term)
= 3315/1.5 + 1749/3.0
= 2793.3 KN

c) Structural Capacity of Pile = 0.21 x fcu x Ac


0.21 x 35x pi^2/4/10^3
1169 KN

Pile safe working load = 1169 KN

Total Length of the Pile = 24 m


from cutoff level
Determination of pile capacity using SPT value method 8-Jul-19
Job Title : ALEXANDRA LINK WAY
Bore Hole No: BH - 1
Diameter of Pile: mm
Primeter area of the shaft = pi x 0 x h = 1.41h m2
Ultimate load carried by pile = shaft resistance + base resistance
shaft resistance = perimeter area of shaft x average value of shearing resistance per unit area
= As.fs (where fs = 2N Limited to 250 )
Base resistance = Ab.qf
qf = 12N(Db/B) <= 200N or limited to 9000 KN/m2

Level Depth SPT SPT fs Shaft resistance Cumulative shaft Remarks


in m in m (h) (N) (Average) 2N = fs.As Resistance
3.5 14
3 14 28 119 119 -
6.5 14
2.5 19 38 134 253 -
9 24
3 26.5 53 225 478 -
12 29
3 56.5 113 479 957 -
15 84
3 92 184 780 1737 -
18 100
3 100 200 848 2586 -
21 100
3 100 200 848 3434 -
24 100
1 100 200 283 3717 -
25 100

Qs = 3717 KN

Base resistance = Ab.qf


qf = 12N (Db/B) or 200N limited to 9000 KN/m2
= 12 x (4/0) or 200N limited to 9000 KN/m2
= 10667 or 20000 limited to 9000 KN/m2

Base resistance = 1696.46 KN

a) Geo technical capcity = Qs/2.5 + Qb/2.5


(short Term)
= (3717 + 1696) /2.5
= 2165.2 KN

b) Geo Technical Capacity = Qs/1.5 + Qb/3.0


(long term)
= 3717/1.5 + 1696/3.0
= 3043.3 KN

c) Structural Capacity of Pile = 0.21 x fcu x Ac


= 0.21 x 35x pi^2/4/10^3
= 1169 KN

Pile safe working load = 1169 KN


Determination of pile capacity using SPT value method 8-Jul-19
Job Title : ALEXANDRA LINK WAY
Bore Hole No: BH - 1
Diameter of Pile: mm
Primeter area of the shaft = pi x 0 x h = 1.41h m2
Ultimate load carried by pile = shaft resistance + base resistance
shaft resistance = perimeter area of shaft x average value of shearing resistance per unit area
= As.fs (where fs = 2N Limited to 250 )
Base resistance = Ab.qf
qf = 12N(Db/B) <= 200N or limited to 9000 KN/m2

Level Depth SPT SPT fs Shaft resistance Cumulative shaft Remarks


in m in m (h) (N) (Average) 2N = fs.As Resistance
3.5 14
3 14 28 119 119 -
6.5 14
2.5 19 38 134 253 -
9 24
3 26.5 53 225 478 -
12 29
3 56.5 113 479 957 -
15 84
3 92 184 780 1737 -
18 100
3 100 200 848 2586 -
21 100
3 100 200 848 3434 -
24 100
1 100 200 283 3717 -
25 100
1 100 200 283 3999 -
26 100

Qs = 3999 KN

Base resistance = Ab.qf


qf = 12N (Db/B) or 200N limited to 9000 KN/m2
= 12 x (19.5/0) or 200N limited to 9000 KN/m2
= 52000 or 20000 limited to 9000 KN/m2

Base resistance = 1749.47 KN

a) Geo technical capcity = Qs/2.5 + Qb/2.5


(short Term)
= (3999 + 1749) /2.5
= 2300 KN

b) Geo Technical Capacity = Qs/1.5 + Qb/3.0


(long term)
= 3999/1.5 + 1749/3.0
= 3249 KN

c) Structural Capacity of Pile = 0.21xfcu xAc


2078
Pile safe working load = 2078 KN

You might also like