Final Estimates
Final Estimates
Isolated Foo
F1 4 1.2 1.25
F2 5 1.2 1.5
F3 6 1.2 1.8
F4 1 1.2 2
F5 1 1.2 2.5
CF1 1 1.2 2.5
Wall Footings
Depth ∑Length Width Side Allowance
∑Volume of Excavation =
Stair Footing
Depth Length Width Side Allowance
0.68 1.05 0.175 0.5
∑Volume of Excavation =
∑Volume of Gravel Bedding =
Summary:
Volume of Excavation = 131.92 m3
Volume of Embankment = 28.14 m3
Volume of Back Fill = 107.25 m3
Volume of Gravel Bedding = 6.74 m3
s otherwise noted.
herwise noted.
Isolated Footings
Volume of
Width Side Allowance Actual Length Actual Width Excavation
∑Volume of Excavation =
∑Volume of Gravel Bedding =
gs
Actual Length Actual Width
25.5 0.8
g
Actual Length Actual Width
1.55 0.675
0.63
1.13
1.94
0.40
0.63
1.25
114.89
5.97
Doors
Mark Description
D6 1/2" thk. Clear Glass with Analok Frame Sliding Glass Door
Windows
Mark Description
Ceiling
107.62 38 188.48 66
*Gypsum Board is 1/2" x 4' x8'
Summary:
Lumber = 36 pcs
Gypsum Board = 104 pcs
CWN = 1.44 kg
*See above for details of doors & windows.
Location Width Height N
Lumber =
Kitchen 1.2 1 1
Lumber =
N of Lumber for Jambs
& Headers
3 1 2.94
4 2 6.72
3 3 1.68
3 4 1.47
3 5 1.68
3 6 5.25
19
1 18.9
8
2 3.84
4
3 2.4
3
4 1.2
2
5 1.2
2
6 0.3
2
7 1.92
3
3
8 1.92
3
9 2.52
3
10 0.96
2
17
PAINTING
NEUTRALIZER 40 2.5 16
PAINTING
40 39.1865 40
40 39.1865 40
40 39.1865 40
40 39.1865 40
SAY
quartz = 4 gal 4
Tiles
Description Location
60 X 60 cm CERAMIC TILES HALLWAY, KITCHEN & DINING
Cement Mortar = 23
White Cement Filler = 130
Tile Adhesive = 29
Location AREA N
HALLWAY, KITCHEN & DINING 72.5 212
bags
kg
bags
Remarks
UNGLAZED
NON-SKID
UNGLAZED
UNGLAZED
UNGLAZED
Isolated Footings
Mark Length Width Thickness N
F1 1.25 1.25 0.3 4
F2 1.5 1.5 0.3 5
∑Volume =
Wall Footings
∑Length Width Thickness
25 0.3 0.2
∑Volume = 1.500
Beams
Mark Width Height Total Length Volume
B1 0.2 0.5 13.4 1.34
Columns
Mark Width Length Total Height N
C1 0.2 0.4 7.6 10
PC 0.2 0.4 3 5
∑Volume =
Slabs
Mark Area Thickness Volume
∑Volume = 34.299
Stair
Length Width Thickness Riser Thread
11.8 1.05 0.125 0.188 0.3
*"Length" includes the landings.
Stair Footing
Ftg Thickness Ftg Width Depth Width Length
0.18 0.4 0.5 0.175 1.05
∑Volume =
Concrete Canopy
Mark N Width Length Thickness
W3 2 2 0.45 0.15
W4 4 1.2 0.45 0.15
W5 2 1 0.45 0.15
W8 2 1.6 0.45 0.15
W10 2 0.6 0.45 0.15
∑Volume =
Summary:
Concrete = 79.23 m3
Cement = 714 bags
Gravel = 79.23 m3
Sand = 39.62 m3
5.832
1.200
2.500
6.250
11.082
Volume
6.080
0.600
1.184
2.208
1.200
6.680
N of Step Volume
17 2.05
Volume
0.167475
2.22
Volume
0.27
0.324
0.135
0.216
0.081
1.026
HT 1 HT 2
Cut Length N Cut Length
5.175 2 6
3 2 2.25
6 2 3
0.454 2 6
2.658 2 2.778
2.4 2 2.853
2.132 2 2.5
1.8 2 2.427
1.657 2 2
1.2 2 2.035
1.291 2 1.5
0.6 2 1.7
1
∑Length = 56.734 1.463
HT 2a ∑Length =
3 1 HT 3
1.6 1 Cut Length
4.094 1 3.965
2.84 1 2.085
2.534 1 4.48
2.433 1 1.85
2.067 1 1.562
2.051 1 1.438
1.042
∑Length = 24.464 1.12
Angle Bars =
HT 4
Cut Length N
3.175 2 HT 5
1.665 2 Cut Length
3.586 2 4.415
1.535 2 1.665
1.112 2 4.722
0.556 2 1.668
1.25
0.417
HT 6
Cut Length N ∑Length =
1.985 9 Angle Bars =
1.04 9
2.24 9
1.12 9
0.521 9
∑Length = 62.154
Angle Bars = 11
Summary:
Angle Bars = 102 50mm x 50mm x 6mm x 6m
C-Purlins = 63 50mm x 100mm x 6m
J Bolt = 96 pcs.
Self-tapping Tekscrew 2033 1½"
HT 2
N
3
3
3
3
3
3
3
3
3
3
3
3
3
3
114.018
19 TRUSS 1
Cut Length N
HT 3 6 6
N 3 3
6 6 6
6 0.664 6
6 2.679 6
6 2.4 6
6 2.158 6
6 1.8 6
6 1.69 6
6 1.2 6
6 1.333 6
0.6 6
108.378
18 ∑Length = 168.144
Angle Bars = 28
HT 5
N
3 J Bolt
3 16 6 96
3
3 Gutter
3 ∑Length Allowance (%) N
3 57 3 25
3
3
3
C-Purlins
16 0.075
F1
16 0.075
16 0.075
F2
16 0.075
16 0.075
F3
16 0.075
16 0.075
F4
16 0.075
16 0.075
F5
16 0.075
16 0.075
16 0.075
CF1
16 0.075
16 0.075
Brief Summary:
N Bar Size
24 16mmØ
6 16mmØ
8 16mmØ
26 16mmØ
34 16mmØ
Columns
N of Columns N Bar Diameter (mm)
11 6 16
6 6 16
5 6 16
Bar Diameter
Mark Cover (mm)
(mm)
3 12
10 75 75
Brief Summary:
N Bar Size Stock Length
38 12mmØ 12m
5 10mmØ 6m
Beams
Beam Grid D 4 16
Beam Grid D 4 16
Beam Grid A 4 16
Beam Grid A 4 16
Beam Grid D 4 16
Beam Grid A 4 16
Beam Grid C 4 16
Beam Grid A 4 16
Beam Grid A 4 16
Beam Grid 7 4 16
Beam Grid A 4 16
Beam Grid 3 4 16
Beam Grid 7 4 16
Beam B1-CB1 4 16
Beam Grid A 4 16
Beam Grid 3 4 16
Beam Grid A 4 16
Beam Grid 5 4 16
B5 2 4 25
B6 4 4 25
B7 4 25
B6 4 25
FTB Grid D 4 12
FTB Grid 2 4 12
FTB Grid 3 4 12
FTB Grid A 4 12
FTB Grid 4 4 12
FTB Grid D 4 12
FTB Grid C 4 12
FTB Grid C 4 12
FTB Grid 5 4 12
FTB Grid 7 4 12
FTB Grid C 4 12
FTB Grid A 4 12
RB Grid A 4 12
RB Grid A 4 12
RB Grid 1 4 12
RB Grid 4 4 12
RB Grid 4 4 12
RB Grid 1 4 12
RB Grid 2 4 12
RB Grid D 4 12
RB Grid A 4 12
RB Grid D 4 12
RB Grid C 4 12
RB Grid C 4 12
RB Grid 4 12
RB Grid 7 4 12
RB Grid 7 4 12
RB Grid 7 4 12
RB Grid C 4 12
RB Grid C 4 12
WF Grid 2 4 12
WF Grid C 4 12
WF Grid A 4 12
WF Grid D 4 12
WF Grid C 4 12
WF Grid C 4 12
WF Grid C 4 12
WF Grid 1 4 12
WF Grid C 4 12
Stair Beam 4 16
LB 4 12
LB 4 12
LB 12 12
LB 4 12
LB 4 12
LB 4 12
Bar Diameter
Mark Cover (m)
(mm)
B1 A 10 20
B1 B 10 20
B1 C 10 20
B1 D 10 20
B1 E 10 20
B2 A 10 20
B2 B 10 20
B2 C 10 20
B2 D 10 20
B2 E 10 20
B3 A 10 20
B3 B 10 20
B3 C 10 20
B3 D 10 20
B3 E 10 20
B3 F 10 20
B3 G 10 20
B3 H 10 20
B3 I 10 20
B3 J 10 20
B4 A 10 20
B4 B 10 20
B4 C 10 20
B4 D 10 20
B4 E 10 20
B4 F 10 20
B4 G 10 20
B5 A 10 20
B5 B 10 20
B5 C 10 20
B5 D 10 20
B5 E 10 20
B5 F 10 20
B5 G 10 20
B6 10 20
CB1 10 20
CB3 A 10 20
CB3 B 10 20
CB3 C 10 20
CB3 D 10 20
CB3 E 10 20
CB3 F 10 20
CB3 G 10 20
CB4 A 10 20
CB4 B 10 20
CB4 C 10 20
RB A 10 20
RB B 10 20
RB C 10 20
RB D 10 20
RB E 10 20
RB F 10 20
RB G 10 20
RB H 10 20
RB I 10 20
RB J 10 20
RB K 10 20
RB L 10 20
RB M 10 20
RB N 10 20
RB O 10 20
RB P 10 20
RB Q 10 20
RB R 10 20
CRB A 10 20
CRB B 10 20
CRB C 10 20
CRB D 10 20
FTB A 10 20
FTB B 10 20
FTB C 10 20
FTB D 10 20
FTB E 10 20
FTB F 10 20
FTB G 10 20
FTB H 10 20
FTB I 10 20
FTB J 10 20
FTB K 10 20
FTB L 10 20
FTB M 10 20
FTB N 10 20
FTB O 10 20
FTB P 10 20
FTB Q 10 20
FTB R 10 20
FTB S 10 20
FTB T 10 20
SB 10 25
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
LB 10 20
13.4
B1 A 0.2 0.5
B1 B 0.2 0.5
B1 C 0.2 0.5
B1 D 0.2 0.5
B1 E 0.2 0.5
B2 A 0.2 0.5
B2 B 0.2 0.5
B2 C 0.2 0.5
B2 D 0.2 0.5
B2 E 0.2 0.5
B3 A 0.2 0.5
B3 B 0.2 0.5
B3 C 0.2 0.5
B3 D 0.2 0.5
B3 E 0.2 0.5
B3 F 0.2 0.5
B3 G 0.2 0.5
B3 H 0.2 0.5
B3 I 0.2 0.5
B3 J 0.2 0.5
B4 A 0.2 0.5
B4 B 0.2 0.5
B4 C 0.2 0.5
B4 D 0.2 0.5
B4 E 0.2 0.5
B4 F 0.2 0.5
B4 G 0.2 0.5
B5 A 0.2 0.5
B5 B 0.2 0.5
B5 C 0.2 0.5
B5 D 0.2 0.5
B5 E 0.2 0.5
B5 F 0.2 0.5
B5 G 0.2 0.5
B6 0.2 0.5
CB1 0.2 0.5
RB A 0.2 0.4
RB B 0.2 0.4
RB C 0.2 0.4
RB D 0.2 0.4
RB E 0.2 0.4
RB F 0.2 0.4
RB G 0.2 0.4
RB H 0.2 0.4
RB I 0.2 0.4
RB J 0.2 0.4
RB K 0.2 0.4
RB L 0.2 0.4
RB M 0.2 0.4
RB N 0.2 0.4
RB O 0.2 0.4
RB P 0.2 0.4
RB Q 0.2 0.4
RB R 0.2 0.4
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
LB 0.15 0.2
Be
Bar Diameter
Mark N
(mm)
Bar Diameter
Mark N
(mm)
Brief Summary:
N Bar Size
21 12mmØ
11 12mmØ
9 12mmØ
8 12mmØ
12 12mmØ
39 16mmØ
10 16mmØ
25 16mmØ
45 16mmØ
15 16mmØ
9 25mmØ
10 25mmØ
8 25mmØ
Bar Diameter
Mark Cover (mm)
(mm)
Bar Diameter
Mark ∑Length
(mm)
12 2.063
12 0.183
12 1.213
12 0.75
12 1.875
12 1.488
12 1.013
12 0.675
12 0.525
12 0.85
2ND FLOOR TOP BAR
12 0.527
12 1.675
12 1.825
12 1.538
12 2.55
12 1.213
12 1.325
12 1.375
2ND FL
12 1.05
12 1.489
12 0.638
12 1.05
12 1.35
12 1.638
12 1.575
12 1.1
12 0.638
12 1.05
12 0.65
12 0.95
2ND FLOOR BOTTOM BAR
12 1.625
12 2.023
12 1.1
12 2.676
12 2.25
12 2.023
12 2.25
12 1.05
12 1.701
12 0.875
12 1.3
12 0.5
12 1.8
Brief Summary:
N Bar Size
40 10mmØ
30 10mmØ
39 10mmØ
54 10mmØ
20 10mmØ
13 12mmØ
10 12mmØ
14 12mmØ
18 12mmØ
12 12mmØ
Bar Diameter
Mark Cover
(mm)
12 0.02
W3
12 0.02
12 0.02
W4
12 0.02
12 0.02
W5
12 0.02
12 0.02
W8
12 0.02
12 0.02
W10
12 0.02
Brief Summary:
N Bar Size
17 12mmØ
1 12mmØ
4 12mmØ
3 12mmØ
Stair
Length Width Thickness
11.8 1.05 0.125
Number of
Spacing (mm) Cut Length
Bars
100 10 7.50
Temperatur
Number of
Spacing (mm) Cut Length
Bars
250 47 1.01
Step Ba
Number of
Spacing (mm) Cut Length
Bars
300 68 0.6
17 1.01 5.94
Brief Summary:
N Bar Size Stock Length
7 10mmØ 6m
7 10mmØ 10.5m
13 16mmØ 6m
10 16mmØ 7.5m
Summary of Rebars:
91 10mmØ 9m
366 10mmØ 10.5m
20 10mmØ 12m
984.28 22
Length Along Y Cut Length pe
N of Footings Cut Length
Width Along X 6.0m
1.25 4 7 1.1 5.45
1.25 4 7 1.1 5.45
2 1 11 1.85 3.24
2.5 1 20 2.35 2.55
5 1 25 4.85 1.24
5 1 25 4.85 1.24
Stock Length
6m
7.5m
9m Tie Wires:
10.5m Mass (kg)
12m 14.73
Main Bars
Cut Length per Stock Length
Bar Diameter (mm) Length
6.0m 7.5m 9.0m
Transverse Bars
50 4.10 14 41 1.02
50 4 1 40 1.02
50 3.9 2 39 1.02
50 5.2 2 48 1.02
50 2.6 11 31 1.02
50 2.6 5 31 1.02
6 50 6 100 17
6 50 6 100 16
6 50 6 100 15
6 50 6 100 24
6 50 6 100 7
6 50 6 100 7
Brief Summary:
Transverse Bars
Cut
Spacing Width N of Bar Cut Length
6.0m
Tie Wires:
Mass (kg)
2.52
Main Bars
Transverse Bars
50 3.4 1 28 1.34
50 1.75 1 20 1.34
50 2.7 1 25 1.34
50 1.9 1 21 1.34
50 3.65 1 30 1.34
50 2.8 1 25 1.34
50 3.4 1 28 1.34
50 4.3 1 33 1.34
50 2.2 1 22 1.34
50 2.2 1 22 1.34
50 3.25 1 28 1.34
50 2.2 1 22 1.34
50 4.3 1 33 1.34
50 1.55 1 19 1.34
50 2.1 1 22 1.34
50 2.1 1 22 1.34
50 2.2 1 22 1.34
50 2.4 1 23 1.34
50 2.6 1 24 1.34
50 3.4 1 28 1.34
50 3.4 1 28 1.34
50 3.75 1 30 1.34
50 1.875 1 21 1.34
50 1.9 1 21 1.34
50 4.3 1 33 1.34
50 3.65 1 30 1.34
50 3.45 1 29 1.34
50 5.35 1 38 1.34
50 1 1 16 1.34
50 3.6 1 29 1.34
50 3.4 1 28 1.34
50 2.8 1 25 1.34
50 3.4 1 28 1.34
50 1.75 1 20 1.34
50 5.35 1 38 1.34
50 0.8 1 11 1.34
50 0.4 1 9 1.34
50 0.2 1 13 1.34
50 1.25 1 18 1.34
50 1.3 1 18 1.34
50 1.3 1 18 1.34
50 0.4 1 9 1.34
50 0.4 1 9 1.34
50 1.1 1 17 1.34
50 0.2 1 5 1.34
50 0.2 1 5 1.34
50 5.35 3 38 1.14
50 3.4 2 28 1.14
50 4.3 2 33 1.14
50 2.2 2 22 1.14
50 1.75 1 20 1.14
50 1.45 1 19 1.14
50 3.75 1 30 1.14
50 2.5 1 24 1.14
50 2.6 1 24 1.14
50 2.7 1 25 1.14
50 2.1 1 22 1.14
50 1.9 1 21 1.14
50 3.25 1 28 1.14
50 4.05 1 32 1.14
50 3.45 1 29 1.14
50 3.375 1 28 1.14
50 2.37 1 23 1.14
50 4.153 1 32 1.14
50 0.4 2 9 1.14
50 0.5 1 10 1.14
50 0.8 1 11 1.14
50 1.2 1 17 1.14
50 3.4 2 28 1.14
50 2.2 3 22 1.14
50 5.35 3 38 1.14
50 2.025 1 22 1.14
50 2.1 1 22 1.14
50 1.75 1 20 1.14
50 1 1 16 1.14
50 2.6 1 24 1.14
50 1.25 1 18 1.14
50 3.75 1 30 1.14
50 2.3 1 23 1.14
50 1.9 1 21 1.14
50 2.7 1 25 1.14
50 0.7 1 11 1.14
50 4.175 1 32 1.14
50 3.45 1 29 1.14
50 4.3 1 33 1.14
50 4.28 1 33 1.14
50 3.65 1 30 1.14
50 3.25 1 28 1.14
50 1.01 1 17 1.05
50 6.8 1 45 0.64
50 1.95 1 21 0.64
50 3.7 1 30 0.64
50 2.05 1 22 0.64
50 2.4 1 23 0.64
50 4.78 1 35 0.64
50 2.43 1 24 0.64
50 2.40 1 23 0.64
50 4.78 1 35 0.64
50 2.43 1 24 0.64
50 3.85 1 31 0.64
50 5.75 1 40 0.64
50 3.65 1 30 0.64
50 3.85 1 31 0.64
50 4.78 1 35 0.64
50 2.43 1 24 0.64
50 2.80 1 25 0.64
50 3.99 1 31 0.64
50 2.76 1 25 0.64
50 4.78 1 35 0.64
72.32
4 50 4 100 12
4 50 4 100 4
4 50 4 100 9
4 50 4 100 5
4 50 4 100 14
4 50 4 100 9
4 50 4 100 12
4 50 4 100 17
4 50 4 100 6
4 50 4 100 6
4 50 4 100 12
4 50 4 100 6
4 50 4 100 17
4 50 4 100 3
4 50 4 100 6
4 50 4 100 6
4 50 4 100 6
4 50 4 100 7
4 50 4 100 8
4 50 4 100 12
4 50 4 100 12
4 50 4 100 14
4 50 4 100 5
4 50 4 100 5
4 50 4 100 17
4 50 4 100 14
4 50 4 100 13
4 50 4 100 22
4 50 4 100 0
4 50 4 100 13
4 50 4 100 12
4 50 4 100 9
4 50 4 100 12
4 50 4 100 4
4 50 4 100 22
4 50 3
4 50 1
2 50 4 1
4 50 4 100 2
4 50 4 100 2
4 50 4 100 2
4 50 1
4 50 1
4 50 4 100 1
2 50 1
2 50 1
4 50 4 100 22
4 50 4 100 12
4 50 4 100 17
4 50 4 100 6
4 50 4 100 4
4 50 4 100 3
4 50 4 100 14
4 50 4 100 8
4 50 4 100 8
4 50 4 100 9
4 50 4 100 6
4 50 4 100 5
4 50 4 100 12
4 50 4 100 16
4 50 4 100 13
4 50 4 100 12
4 50 4 100 7
4 50 4 100 16
4 50 1
4 50 2
4 50 3
4 50 4 100 1
4 50 4 100 12
4 50 4 100 6
4 50 4 100 22
4 50 4 100 6
4 50 4 100 6
4 50 4 100 4
4 50 4 100 0
4 50 4 100 8
4 50 4 100 2
4 50 4 100 14
4 50 4 100 7
4 50 4 100 5
4 50 4 100 9
4 50 3
4 50 4 100 16
4 50 4 100 13
4 50 4 100 17
4 50 4 100 17
4 50 4 100 14
4 50 4 100 12
4 50 4 100 1
4 50 4 100 29
4 50 4 100 5
4 50 4 100 14
4 50 4 100 6
4 50 4 100 7
4 50 4 100 19
4 50 4 100 8
4 50 4 100 7
4 50 4 100 19
4 50 4 100 8
4 50 4 100 15
4 50 4 100 24
4 50 4 100 14
4 50 4 100 15
4 50 4 100 19
4 50 4 100 8
4 50 4 100 9
4 50 4 100 15
4 50 4 100 9
4 50 4 100 19
Cut Length
6.0m 7.5m 9.0m 10.5m
Stock Length
6m
7.5m
9m
10.5m
12m
6m
7.5m
9m
10.5m
12m
6m
9m
10.5m
Cut
Hook (mm) ∑Length Cut Length N
6.0m
SLAB RSB
Cut Length N
6.0m 7.5m 9.0m
Stock Length
6m
7.5m
9m
7.5m
9m
10.5m
12m
Concrete Canopy
Length Along Y Cut Length pe
N of Windows Cut Length
Width Along X 6.0m
Stock Length
6m
9m Tie Wires:
Stair Footing
Riser Thread N of Step Ftg Thickness
0.188 0.3 17 0.18
16mmØ
1 7.5 10 100
30 12mmØ 9m
42 12mmØ 10.5m
1.30 1.48 9 66
2.06 2.35 10.5 18
3.22 3.68 10.5 10
s (mm)
150
150
150
150
150
150
Min Waste N of Stock Length
Stock Length
12.0m
2.08 12 38
0.95 1.09 12 4
2.08 2.38 10.5 2
0.99 1.13 12 4
1.24 1.41 9 4
1.35 1.54 9 4
1.75 2.00 6 4
1.25 1.43 9 4
0.93 1.06 12 4
1.13 1.29 10.5 4
2.50 2.86 9 2
1.65 1.89 7.5 4
1.65 1.89 7.5 4
1.35 1.54 9 4
1.56 1.78 7.5 4
0.96 1.10 12 4
0.99 1.13 12 4
0.99 1.13 12 4
2.08 2.38 10.5 2
0.99 1.13 12 4
1.93 2.20 6 4
1.93 2.20 6 4
1.27 1.45 9 4
1.33 1.52 9 4
3.00 3.43 10.5 2
1.96 2.24 6 4
1.60 1.83 7.5 4
1.43 1.63 7.5 4
2.61 2.98 9 2
2.84 3.24 7.5 2
7.00 8.00 6 1
2.88 3.29 7.5 2
4.20 4.80 7.5 2
6.46 7.38 12 1
1.45 1.66 7.5 4
1.20 1.37 9 4
1.84 2.11 6 4
1.09 1.25 10.5 11
0.91 1.04 12 4
56.13
Brief Summary:
s (mm) N
200 38
200 4
200 20
200 283
200 52
200 174
200 70
200 22
200 6
200 12
200 41
200 8
200 8
200
200
200
200
200
200
200
200
Mark N
200
200 GRND 162
200
200
200
200
Mark N
200
200 GRND 114
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
200
8.51 6 1 4.00
5.24 12 1 2.00
8.39 6 2 4.00
6.19 6 3 3.00
6.19 6 2 3.00
5.50 9 1 2.00
6.19 6 3 3.00
4.00 6 2 2.00
8.22 6 1 4.00
8.22 6 1 4.00
6.19 6 2 3.00
7.79 12 2 3.00
10.91 9 1 5.00
7.10 12 1 3.00
10.81 9 1 5.00
7.10 12 1 3.00
6.63 7.5 1 3.00
10.00 6 1 5.00
6.86 10.5 1 3.00
8.28 6 1 4.00
8.82 6 1 4.00
8.82 6 1 4.00
6.70 9 1 3.00
6.67 9 1 3.00
8.57 6 1 4.00
6.70 9 1 3.00
6.67 9 1 3.00
4.46 6 2 2.00
6.67 9 1 3.00
8.22 6 1 4.00
6.19 6 1 3.00
8.22 6 1 4.00
6.19 6 1 3.00
7.79 12 1 3.00
10.91 9 1 5.00
7.10 12 1 3.00
9.38 9 1 4.00
10.91 9 1 5.00
9.38 9 1 4.00
8.05 6 1 4.00
4.80 7.5 1 2.00
5.71 10.5 1 2.00
7.74 12 1 3.00
8.33 6 1 4.00
7.84 12 1 3.00
11.32 7.5 1 5.00
5.00 12 1 2.00
7.14 12 1 3.00
6.70 9 1 3.00
6.67 9 1 3.00
8.70 6 1 4.00
7.14 12 1 3.00
12.00 6 1 6.00
7.10 12 1 3.00
6.35 6 1 3.00
8.05 6 1 4.00
Min Waste N of Stock Length
Stock Length
12.0m
5.48 9 1 2.00
2.99 9 2 1.00
2.78 9 2 1.00
5.41 9 2 2.00
2.99 9 2 1.00
3.48 10.5 3 1.00
5.19 12 2 2.00
5.19 12 4 2.00
3.48 10.5 2 1.00
4.18 6 4 2.00
8.22 6 2 4.00
7.14 12 1 3.00
4.18 6 4 2.00
8.22 6 1 4.00
7.14 12 1 3.00
4.00 6 2 2.00
5.26 12 1 2.00
3.48 10.5 2 1.00
4.71 10.5 1 2.00
8.22 6 1 4.00
5.19 12 1 2.00
4.18 6 2 2.00
6.45 7.5 1 3.00
8.33 6 1 4.00
4.18 6 2 2.00
8.22 6 1 4.00
7.23 12 1 3.00
4.18 6 2 2.00
Cut Length per Stock Length
Min Waste
7.5m 9.0m 10.5m 12.0m Stock Length
gth
Min Waste Stock N of Stock Length
Length
10.5m 12.0m
14.00 16.00 6 1
5.60 6.40 7.5 2
7.06 8.06 6 1
10.37 11.85 10.5 1
15.56 17.78 7.5 1
19.92 22.77 9 1
6.27 7.16 12 2
5.75 6.58 7.5 4
6.83 7.80 12 2
4.12 4.71 10.5 2
16.46 18.81 9 1
10.00 11.43 10.5 1
7.78 8.89 6 2
6.41 7.33 12 2
6.67 7.62 12 1
9.55 10.91 9 2
16.46 18.81 9 1
10.00 11.43 10.5 2
6.46 7.38 12 1
5.19 5.93 10.5 1
9.55 10.91 9 1
3.92 4.48 6 4
4.67 5.33 9 3
6.17 7.05 12 3
12.00 13.71 10.5 1
N of Stock
Number of Bars Cut Length Factor Stock Length Length
10 3.50 1 6 10
10.5 5 200 14
6 7
N of Stock Length
2
N Bar Size Stock Length N
114 16mmØ 6m 17
33 16mmØ 7.5m 10
99 16mmØ 9m 8
99 16mmØ 10.5m 8
69 16mmØ 12m
N of Stock
Length
4
4
12
12
9
9
3
3
4
4
4
4
13
13
0.00 0.00
1.00 1.00
1.00 2.00
N of Stock
Length
5
0.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
1.00
2.00
1.00
1.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
0.00
0.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
0.00
0.00
1.00
1.00
4.00
1.00
2.00
0.00
2.00
4.00
3.00
0.00
0.00
1.00
0.00
0.00
6 7 4.00 5.00
6 5 4.00 5.00
6 7 4.00 5.00
6 6 4.00 5.00
6 8 4.00 5.00
6 7 4.00 5.00
6 7 4.00 5.00
6 9 4.00 5.00
6 6 4.00 5.00
6 6 4.00 5.00
6 7 4.00 5.00
6 6 4.00 5.00
6 9 4.00 5.00
6 5 4.00 5.00
6 6 4.00 5.00
6 6 4.00 5.00
6 6 4.00 5.00
6 6 4.00 5.00
6 6 4.00 5.00
6 7 4.00 5.00
6 7 4.00 5.00
6 8 4.00 5.00
6 6 4.00 5.00
6 6 4.00 5.00
6 9 4.00 5.00
6 8 4.00 5.00
6 8 4.00 5.00
6 10 4.00 5.00
6 4 4.00 5.00
6 8 4.00 5.00
6 7 4.00 5.00
6 7 4.00 5.00
6 7 4.00 5.00
6 5 4.00 5.00
6 10 4.00 5.00
6 3 4.00 5.00
6 3 4.00 5.00
6 4 4.00 5.00
6 5 4.00 5.00
6 5 4.00 5.00
6 5 4.00 5.00
6 3 4.00 5.00
6 3 4.00 5.00
6 5 4.00 5.00
6 2 4.00 5.00
6 2 4.00 5.00
10.5 13 5.00 6.00
10.5 7 5.00 6.00
9 2 9.00 11.00
9 3 9.00 11.00
9 2 9.00 11.00
9 2 9.00 11.00
9 3 9.00 11.00
9 2 9.00 11.00
9 2 9.00 11.00
9 3 9.00 11.00
9 2 9.00 11.00
9 3 9.00 11.00
9 3 9.00 11.00
9 3 9.00 11.00
9 3 9.00 11.00
9 3 9.00 11.00
9 2 9.00 11.00
9 2 9.00 11.00
9 3 9.00 11.00
9 2 9.00 11.00
9 3 9.00 11.00
16mmØ 6m
16mmØ 7.5m
16mmØ 12m
10mmØ 6m
10mmØ 9m
12mmØ 9m
12mmØ 10.5m
12mmØ 12m
25mmØ 6m
25mmØ 12m
10 97.1 4.60 6
10 78.203 4.60 6
CHB Horizontal Bars
10 97.1 3.70 6
10 78.203 2.60 6
Brief Summary:
N Bar Size
499 10mmØ
5.00 6.00 7.00 8.00
2
8
2
4
1
2
1
3
1
1
Main Bars Landing - 16mmØ
1.01 1 6 3
Bar Size Stock Length
25mmØ 6m
25mmØ 9m
25mmØ 10.5m
25mmØ 12m
1.00 1.00 1.00 0.74
1.00 2.00 2.00 0.18
2.00 3.00 3.00 0.84
1 1 1 1
0 0 0 1
N of Stock Length
162
131
N of Stock Length
114
92
Stock Length
6m
0.26 0.32 0.38 0.45 0.51
0.40 6 7.5
0.00 6 7.5
0.13 6 7.5
0.24 6 7.5
0.20 6 7.5
0.09 6 7.5
0.09 6 7.5
0.13 6 7.5
0.09 6 7.5
0.00 6 7.5
0.11 6 7.5
0.11 6 7.5
0.09 6 7.5
0.79 6 7.5
0.18 6 7.5
0.10 6 7.5
0.11 6 7.5
0.10 6 7.5
0.14 6 7.5
0.00 6 7.5
0.10 6 7.5
0.00 6 7.5
0.00 6 7.5
0.14 6 7.5
0.41 6 7.5
0.41 6 7.5
0.03 6 7.5
0.00 6 7.5
0.29 6 7.5
0.03 6 7.5
0.00 6 7.5
0.02 6 7.5
0.16 6 7.5
0.10 6 7.5
0.23 6 7.5
0.00 6 7.5
0.02 6 7.5
0.19 6 7.5
0.09 6 7.5
0.11 6 7.5
0.11 6 7.5
0.09 6 7.5
0.11 6 7.5
0.09 6 7.5
0.79 6 7.5
0.18 6 7.5
0.10 6 7.5
0.03 6 7.5
0.18 6 7.5
0.03 6 7.5
0.03 6 7.5
0.00 6 7.5
0.00 6 7.5
0.74 6 7.5
0.17 6 7.5
0.84 6 7.5
0.08 6 7.5
0.00 6 7.5
0.02 6 7.5
0.03 6 7.5
0.14 6 7.5
0.03 6 7.5
0.00 6 7.5
0.35 6 7.5
0.14 6 7.5
0.00 6 7.5
0.10 6 7.5
0.17 6 7.5
0.03 6 7.5
0.11 6 7.5
0.10 6 7.5
0.00 6 7.5
0.24 6 7.5
0.09 6 7.5
0.05 6 7.5
0.04 6 7.5
0.04 6 7.5
0.24 6 7.5
0.04 6 7.5
0.19 6 7.5
0.19 6 7.5
0.04 6 7.5
0.01 6 7.5
0.17 6 7.5
0.09 6 7.5
0.11 6 7.5
0.17 6 7.5
0.09 6 7.5
0.11 6 7.5
0.14 6 7.5
0.34 6 7.5
0.00 6 7.5
0.09 6 7.5
0.11 6 7.5
0.14 6 7.5
0.00 6 7.5
0.26 6 7.5
0.04 6 7.5
0.12 6 7.5
0.01 6 7.5
0.10 6 7.5
0.05 6 7.5
0.11 6 7.5
0.19 6 7.5
0.04 6 7.5
0.19 6 7.5
0.04 6 7.5
0.01 6 7.5
0.17 6 7.5
0.09 6 7.5
0.03 6 7.5
0.17 6 7.5
0.09 6 7.5
0.11 6 7.5
0.03 6 7.5
0.03 6 7.5
0.02 6 7.5
0.23 6 7.5
0.09 6 7.5
0.93 0.08 0.24 0.08
0.82 0.09 6
0.57 0.18 6
0.89 0.18 6
0.00 0.00 6
0.40 0.00 6
0.06 0.03 6
0.85 0.37 6
0.78 0.11 6
0.86 0.00 6
0.12 0.06 6
0.77 0.08 6
0.16 0.16 6
0.58 0.11 6
0.80 0.80 6
0.71 0.12 6
0.89 0.18 6
0.06 0.06 6
0.73 0.36 6
0.43 0.00 6
0.06 0.03 6
0.81 0.11 6
0.43 0.00 6
0.89 0.44 6
0.33 0.33 6
0.62 0.62 6
0.91 0.18 6
0.81 0.11 6
0.43 0.00 6
0.46 0.15 6
0.63 0.05 6
0.38 0.38 6
0.93 0.19 6
0.91 0.18 6
0.48 0.24 6
0.33 0.00 6
0.93 0.19 6
0.33 0.00 6
0.43 0.00 6
0.05 0.05 6
0.71 0.00 6
0.23 0.08 6
0.00 0.00 6
0.67 0.00 6
5.00
5.00
4.00
4.00
3.00
3.00
3.00
3.00
2.00
2.00
2
2
1
1
0.11
0.06
0.22
0.29
0.29
0.29
0.29
0.29
0.29
6 7.5 9 10.5 12
0.09
0.08
0.26
0.10
0.08
0.13
0.06
0.06
0.12
0.11
0.33
0.19
0.15
0.00
0.07
0.06
0.13
0.14
0.18
0.18
0.15
0.11
0.10
0.13
0.13
0.08
0.13
0.02
0.14
0.06
0.11
0.12
0.02
0.09
0.18
0.18
0.11
0.21
0.16
0.10
0.10
0.08
0.14
0.00
0.02
0.06
0.02
0.19
0.33
0.12
0.15
0.02
0.24
0.03
0.00
0.05
0.00
0.12
0.00
0.36
0.38
0.03
0.03
0.05
0.09
0.04
0.04
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
7.5 9 10.5 12
12.00 15.00 17.00 20.00
1 1 2 2
1 1 2 2
0.17 0.71 0.25 0.80 0.34
0.06 6 9
0.17 6 9
0.05 6 9
0.17 6 9
0.25 6 9
0.17 6 9
0.69 6 9
0.17 6 9
0.07 6 9
0.91 0.40 0.88 0.40
0.00 0.50 0.00 0.00
0.44 6
0.44 6
0.27 6
0.27 6
0.05 6
0.05 6
0.11 6
0.11 6
0.11 6
0.11 6
0.16 6
0.16 6
6 7.5 9 10.5 12
6 7.5 9 10.5 12
6 7.5 9 10.5 12
2.19
1.23
2.4
4.02
4.31
2.22
3.45
3.45
4.02
3.45
2.31
2.31
3.45
2.49
1.44
2.87
1.46
1.44
2.87
1.46
1.68
3.14
3
2.87
1.46
1.68
3
2.28
3.45
2.55
2.49
1.23
2.22
1.46
2.31
3.45
2.31
3.45
2.49
1.44
2.87
1.86
1.44
2.87
1.46
1.86
1.86
2.39
1.66
2.87
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
7.5 9 10.5
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
9 10.5 12
12
12
12
12
12
12
12
12
12
12
12
12
12
12
Project Name: PROPOSED TWO STOREY RESIDENTIAL BUILDING
Project Owner: MR. & MRS. JAMES IVAN MAGBANUA
Project Location: LOT 6, BLK-33 PUERTO REAL SUBDIVISION TABUC SUBA LA PAZ, Iloilo City
REBAR C
LOCATION/
Bar Diameter Quantity of
Cut Bars Cut Length (m)
ITEM No.
(mm) STRUCTURE
11 10 16 2.35 CF1
12 10 16 2.35 CF1
13 10 25 4.85 CF1
14 10 25 4.85 CF1
15 16 66 7.9 Columns/MainBars
24 16 4 11 Beam Grid D
37 16 4 6 Beam B1-CB1
42 25 4 6.35 B5 2
43 25 4 6.35 B6 4
44 25 4 7.8 B7
45 25 4 6.75 B6
58 12 4 6.35 RB Grid A
59 12 4 6.35 RB Grid A
60 12 4 6.75 RB Grid 1
61 12 4 4.75 RB Grid 4
62 12 4 4.85 RB Grid 4
63 12 4 5.45 RB Grid 1
64 12 4 5.45 RB Grid 2
65 12 4 8.3 RB Grid D
66 12 4 7.9 RB Grid A
67 12 4 3.5 RB Grid D
68 12 4 5.2 RB Grid C
69 12 4 7.1 RB Grid C
70 12 4 5.2 RB Grid
71 12 4 4.8 RB Grid 7
72 12 4 3.15 RB Grid 7
73 12 4 5.35 RB Grid 7
74 12 4 6.55 RB Grid C
75 12 4 7.35 RB Grid C
76 12 4 4.025 WF Grid 2
77 12 4 3.7 WF Grid C
78 12 4 1.5 WF Grid A
79 12 4 3.65 WF Grid D
80 12 4 2.5 WF Grid C
81 12 4 6.725 WF Grid C
82 12 4 2.1 WF Grid C
83 12 4 1.375 WF Grid 1
84 12 4 1.625 WF Grid C
85 12 4 7.25 Stair Beam
86 10 124 1.34 B1/Stirrups
87 10 130 1.34 B2/Stirrups
88 10 243 1.34 B3/Stirrups
89 10 192 1.34 B4/Stirrups
90 10 185 1.34 B5/Stirrups
91 10 38 1.34 B6/Stirrups
92 10 105 1.34 CB1/Stirrups
93 10 94 1.34 CB3/Stirrups
94 10 27 1.34 CB4/Stirrups
95 10 478 1.14 RB/Stirrups
96 10 47 1.14 CRB/Stirrups
97 10 506 1.14 FTB/Stirrups
98 10 17 1.05 Stair Beam/Stirrups
99 16 2 1.41 B1 Extra Top Bar Grid 1
100 16 2 1.01 B1 Extra Top Bar Grid D
101 16 2 1.5 B1 Extra Top Bar Grid 1
102 16 4 2.18 B2 Extra Top Bar Grid D
103 16 4 2.29 B2 Extra Top Bar Grid D
104 16 6 1.43 B3 Extra Top Bar Grid 1
105 16 8 1.94 B4 Extra Top Bar Grid 3
106 25 4 1.94 B5 Extra Top Bar Grid 2
107 25 4 2.18 B5 Extra Top Bar Grid 7
108 25 8 1.94 B6 Extra Top Bar Grid 1
109 16 3 3 CB3 Extra Top Bar Grid C
110 16 3 1.46 B3 Extra Top Bar Grid 1
111 16 4 1.46 B4 Extra Top Bar Grid 1
112 25 4 1.94 B5 Extra Top Bar Grid 2
113 16 8 1.54 B4 Extra Top Bar Grid 4
114 16 2 1.1 B2 Extra Top Bar Grid D
115 16 2 1.69 B3 Extra Top Bar Grid 1
116 16 2 1.11 B2 Extra Top Bar Grid 4
117 16 2 1.69 B4 Extra Top Bar Grid 2
118 16 3 1.81 B3 Extra Top Bar Grid 5
119 16 5 1.75 B4 Extra Top Bar Grid A
120 16 1 1.69 B4 Extra Top Bar Grid 3
121 16 3 1.2 B3 Extra Top Bar Grid 1
122 25 4 1.75 B5 Extra Top Bar Grid 4
123 16 1 1.45 B1 Extra Top Bar Grid A
124 16 3 1.36 B3-CB3 Extra Top Bar Grid C
125 16 4 1.36 B4-CB4 Extra Top Bar Grid A
126 16 2 1.79 B2-B3 Extra Top Bar Grid D
127 16 2 1.80 B3-B2 Extra Top Bar Grid D
128 16 3 1.40 CB3-B3 Extra Top Bar Grid 1
129 16 3 1.79 B3-B4 Extra Top Bar Grid C
130 16 3 1.80 B4-B3 Extra Top Bar Grid A
131 16 3 1.31 B3-B3 Extra Top Bar Grid A
132 16 3 1.90 B3-CB3 Extra Top Bar Grid C
133 16 3 2.56 B3-B4 Extra Top Bar Grid C
134 16 4 2.69 CB4-B4 Extra Top Bar Grid A
135 16 3 1.80 B4-B3 Extra Top Bar Grid A
136 16 3 1.31 B3-B3 Extra Top Bar Grid A
137 16 1 2.15 CB1-B1 Extra Top Bar Grid A
138 12 2 1.94 RB Extra Top Bar Grid 1
139 12 2 1.11 RB Extra Top Bar Grid C
140 12 2 1.46 RB Extra Top Bar Grid A
141 12 2 1.94 RB Extra Top Bar Grid 3
142 12 2 1.46 RB Extra Top Bar Grid A
143 12 2 1.94 RB Extra Top Bar Grid 3
144 12 2 1.54 RB Extra Top Bar Grid 4
145 12 2 1.1 RB Extra Top Bar Grid D
146 12 2 1.69 RB Extra Top Bar Grid D
147 12 2 1.28 RB Extra Top Bar Grid 3
148 12 2 1.1 RB Extra Top Bar Grid D
149 12 2 1.28 RB Extra Top Bar Grid 3
150 12 2 1.49 RB Extra Top Bar Grid 7
151 12 2 2.50 RB Extra Top Bar Grid D
152 12 2 2.10 RB Extra Top Bar Grid C
153 12 2 1.55 RB Extra Top Bar Grid C
154 12 2 1.44 RB Extra Top Bar Grid C
155 12 2 1.53 RB Extra Top Bar Grid C
156 12 2 1.06 RB-CRB Extra Top Bar Grid 1
157 12 2 2.40 RB Extra Top Bar Grid A
158 12 2 2.48 RB Extra Top Bar Grid A
159 12 2 1.79 RB Extra Top Bar Grid A
160 12 2 1.68 RB-CRB Extra Top Bar Grid 3
161 12 2 1.79 RB Extra Top Bar Grid 3
162 12 2 1.80 RB Extra Top Bar Grid 4
163 12 2 1.38 RB Extra Top Bar Grid 7
164 12 2 1.68 RB-CRB Extra Top Bar Grid A
165 12 2 1.00 RB-CRB Extra Top Bar Grid C
166 12 2 1.69 RB Extra Top Bar Grid 3
167 12 2 1.89 RB Extra Top Bar Grid 4
168 12 2 1.49 RB-CRB Extra Top Bar Grid D
169 16 2 2.19 B1 Extra Bottom Bar Grid 1
170 16 2 1.23 B1 Extra Bottom Bar Grid D
171 16 2 2.4 B1 Extra Bottom Bar Grid D
172 16 4 4.02 B2 Extra Bottom Bar Grid 7
173 16 4 4.31 B2 Extra Bottom Bar Grid 7
174 16 6 2.22 B3 Extra Bottom Bar Grid 1
175 16 8 3.45 B4 Extra Bottom Bar Grid 3
176 25 4 3.45 B5 Extra Bottom Bar Grid 4
177 25 4 4.02 B5 Extra Bottom Bar Grid 7
178 25 8 3.45 B6 Extra Bottom Bar Grid A
179 16 6 2.31 B3 Extra Bottom Bar Grid D
180 16 16 2.31 B4 Extra Bottom Bar Grid 2
181 25 4 3.45 B5 Extra Bottom Bar Grid 2
182 16 8 2.49 B4 Extra Bottom Bar Grid 3
183 16 4 1.44 B2 Extra Bottom Bar Grid D
184 16 6 2.87 B3 Extra Bottom Bar Grid D
185 16 4 1.46 B2 Extra Bottom Bar Grid D
186 16 6 1.44 B3 Extra Bottom Bar Grid C
187 16 8 2.87 B4 Extra Bottom Bar Grid 3
188 16 6 1.46 B3 Extra Bottom Bar Grid C
189 16 6 1.68 B3 Extra Bottom Bar Grid C
190 16 6 3.14 B3 Extra Bottom Bar Grid C
191 16 4 3 B4 Extra Bottom Bar Grid C
192 16 8 2.87 B4 Extra Bottom Bar Grid C
193 16 3 1.46 B3 Extra Bottom Bar Grid 5
194 16 6 1.68 B3 Extra Bottom Bar Grid A
195 25 4 3 B5 Extra Bottom Bar Grid 7
196 16 2 2.28 B1 Extra Bottom Bar Grid A
197 12 4 3.45 RB Extra Bottom Bar Grid 1
198 12 4 2.55 RB Extra Bottom Bar Grid 1
199 12 4 2.49 RB Extra Bottom Bar Grid 2
200 12 4 1.23 RB Extra Bottom Bar Grid 7
201 12 4 2.22 RB Extra Bottom Bar Grid 2
202 12 4 1.46 RB Extra Bottom Bar Grid 4
203 12 4 2.31 RB Extra Bottom Bar Grid 7
204 12 4 3.45 RB Extra Bottom Bar Grid 3
205 12 4 2.31 RB Extra Bottom Bar Grid 7
206 12 4 3.45 RB Extra Bottom Bar Grid 3
207 12 4 2.49 RB Extra Bottom Bar Grid 7
208 12 4 1.44 RB Extra Bottom Bar Grid 3
209 12 4 2.87 RB Extra Bottom Bar Grid D
210 12 4 1.86 RB Extra Bottom Bar Grid D
211 12 4 1.44 RB Extra Bottom Bar Grid D
212 12 4 2.87 RB Extra Bottom Bar Grid C
213 12 4 1.46 RB Extra Bottom Bar Grid A
214 12 4 1.86 RB Extra Bottom Bar Grid A
215 12 4 1.86 RB Extra Bottom Bar Grid A
216 12 4 2.39 RB Extra Bottom Bar Grid 4
217 12 4 1.66 RB Extra Bottom Bar Grid A
218 12 4 2.87 RB Extra Bottom Bar Grid C
219 10 14 9.71 Ground Floor/MainBars Grid 2-4
220 10 5 5.66 Ground Floor/MainBars Grid 1-2
221 10 8 9.00 Ground Floor/MainBars Grid C-D
222 10 8 4.71 Ground Floor/MainBars Grid C-D
223 10 3 7.50 Ground Floor/MainBars Grid A-C
224 10 3 5.11 Ground Floor/MainBars Grid A-C
225 10 8 11.14 Ground Floor/MainBars Grid A-C
226 10 6 10.10 Ground Floor/MainBars Grid 4-7
227 10 2 4.46 Ground Floor/MainBars Grid 5-7
228 10 3 4.14 Ground Floor/MainBars Grid 5-7
229 10 12 3.11 Ground Floor/MainBars Grid 2-1
230 10 6 11.91 Ground Floor/MainBars Grid A-C
231 10 12 6.87 Ground Floor/MainBars Grid 4-7
232 10 7 5.59 Ground Floor/MainBars Grid A-C
233 10 21 10.11 2nd Floor/MainBars Grid 1-3
234 10 3 8.01 2nd Floor/MainBars Grid 1-2
235 10 2 3.76 2nd Floor/MainBars Grid 1-2
236 10 7 12.00 2nd Floor/MainBars Grid A-C
237 10 7 4.61 2nd Floor/MainBars Grid A-C
238 10 14 7.41 2nd Floor/MainBars Grid C-D
239 10 6 7.50 2nd Floor/MainBars Grid A-C
240 10 6 6.41 2nd Floor/MainBars Grid A-C
241 10 5 12.00 2nd Floor/MainBars Grid A-C
242 10 5 6.11 2nd Floor/MainBars Grid A-C
243 10 1 3.71 2nd Floor/MainBars Grid 7
244 10 15 3.91 2nd Floor/MainBars Grid 7
245 10 18 5.86 2nd Floor/MainBars Grid 3-7
246 10 1 5.66 2nd Floor/MainBars Grid 5
247 10 1 2.06
248 12 6 0.18
249 12 1 1.21
250 12 4 0.75
251 12 7 1.88
252 12 7 1.49
253 12 2 1.01
254 12 2 0.68
255 12 2 0.53
256 12 6 0.85
257 12 14 0.53
258 12 6 1.68
280 12 7 2.68
281 12 8 2.25
282 12 9 2.02
283 12 9 2.25
284 12 20 1.05
285 12 10 1.70
286 12 6 0.88
2N
287 12 6 1.30
288 12 6 0.50
289 12 8 1.80
290 12 14 0.59
W3/Concrete Canopy
291 12 22 1.96
292 12 16 0.59
W4/Concrete Canopy
293 12 28 1.16
294 12 8 0.59
W5/Concrete Canopy
295 12 12 0.96
296 12 8 0.59
W8/Concrete Canopy
297 12 18 1.56
298 12 8 0.59
W10/Concrete Canopy
299 12 8 0.56
300 12 85 0.78 WF Stirrups
301 12 4 8.75 LB Main Bars
302 12 4 5.7 LB Main Bars
303 12 12 9.6 LB Main Bars
304 12 4 7.5 LB Main Bars
305 12 4 7.2 LB Main Bars
306 12 4 11.52 LB Main Bars
307 10 589 0.64 LB Stirrups
308 16 10 7.5 Stair Main Bars
309 16 10 3.5 Stair Main Bars
310 10 47 1.01 Temperature Bars
311 10 68 0.6 Step Bars
312 10 14 1.01 Main Bars Landing
313 10 17 1.01 Transverse Step Bars
TOTAL
Cut Length per Stock Length Selected Stock Quantity of Waste per Cut
6 7.5 9 10.5 12 Length (m) Stock Length (m)
*See summary in
Rebar Works 115.45
Steelman:
Mass of Waste (kg) REMARKS
0.71
12
0.71
12
6.39
12
6.39
12
3.60
12
3.60
12
0.27
12
0.27
12
1.58
12
0.89
12
0.62
12
0.62
12
6.41
12
6.41
12
114.59
12
8.52
11.17
10.73
0.74
1.48
1.85
6.47
2.96
6.31
1.26
3.79
3.47
4.42
8.84
3.16
2.53
1.89
0.95
3.31
2.84
7.58
0.00
3.79
4.42
7.58
1.89
17.73
17.73
18.50
11.56
3.91
4.97
4.97
0.71
4.97
0.18
3.91
1.42
2.66
2.31
0.18
3.55
4.08
4.08
2.66
1.78
1.42
1.95
1.95
2.49
3.91
0.00
0.18
1.42
0.18
1.60
1.86
2.31
3.37
0.53
1.69
0.18
0.00
0.36
0.00
2.75
0.00
0.44
0.55
0.89
12.23
13.02
24.07
18.94
18.55
3.95
10.65
9.47
2.76
7.99
0.89
8.43
0.00
0.57
0.63
0.00
0.44
0.87
0.88
0.85
1.39
1.08
2.08
0.00
0.25
0.25
1.39
3.85
0.32
0.27
0.19
0.27
0.41
0.00
0.27
0.00
0.00
0.32
0.88
0.88
0.08
0.00
0.63
0.08
0.00
0.03
0.47
0.41
1.96
0.00
0.03
0.63
0.16
0.11
0.14
0.16
0.14
0.16
1.08
0.18
0.15
0.04
0.18
0.04
0.04
0.00
0.00
1.02
0.21
1.15
0.07
0.00
0.05
0.04
0.21
0.04
0.00
0.43
0.21
0.00
0.15
0.29
0.04
0.38
0.19
0.00
3.03
1.20
0.38
0.71
1.16
7.40
1.73
1.42
2.84
1.16
0.14
0.38
1.23
0.25
0.76
1.64
0.51
0.38
3.41
0.00
1.64
0.25
0.38
0.00
0.95
0.27
0.27
0.05
0.11
0.11
0.14
0.40
0.27
0.40
0.27
0.05
0.21
0.46
0.05
0.21
0.46
0.14
0.05
0.05
0.04
0.34
0.46
6.82
1.05
0.00
2.66
0.00
0.35
4.24
1.48
0.05
0.89
2.89
0.33
4.66
1.77
5.05
1.83
0.44
0.00
3.16
0.78
0.00
4.03
0.00
4.28
0.05
0.83
1.55
0.21
0.11
0.03
0.20
0.00
0.00
0.09
0.33
0.07
0.00
0.04
0.07
0.21
0.16
2.17
0.53
0.43
0.03
0.85
0.00
0.07
0.04
0.00
0.53
0.46
1.67
0.18
0.04
0.00
0.18
0.04
1.57
0.36
0.18
2.30
0.00
0.71
0.00
0.00
0.18
0.18
0.09
0.00
0.00
0.18
0.85
0.18
0.21
0.09
0.43
0.09
2.88
0.09
0.04
1.60
0.89
1.07
9.59
0.00
1.07
1.70
1.06
0.00
0.00
1.23
0.00
0.49
0.49
693.01
5.00 6.00 8.00 9 10.00 0.45 0.82 0.18
- - - 0 1.00 1.00
- - - 0 1.00 1.00
- - - 0 1.00 1.00
- - - 1 1.00 1.00
- - - 0 1.00 1.00
- - - 0 1.00 1.00
- - - 0 1.00 1.00
- - - 0 1.00 1.00
- - - 1 1.00 1.00
1.00 1.00 2.00 2 2.00 2.00
1.00 1.00 2.00 2 2.00 2.00
- - - 0 1.00 1.00
1.00 1.00 1.00 2 2.00 2.00
- 1.00 1.00 1 1.00 1.00
- - - 0 1.00 1.00
- 1.00 1.00 1 1.00 1.00
1.00 2.00 2.00 2 3.00 2.00
107.62 656.48
*Cross section of lumber is 2 by 2 inch.
Summary:
547.56
*Note: Dimensions of Plywood is 0.012 by 1.2 by 2.4 meter.
Isolated Footings
F2 2 2
F3 2.2 2.2
F4 2.4 2.4
Beams
B1 0.25 0.4
B2 0.2 0.4
RBI 0.25 0.4
TB 0.2 0.4
Columns
Mark Width Length
C1 0.35 0.35
Slabs
Stairs
Stair Footing
Ftg Thickness Ftg Width Height
Summary:
Total Plywood = 123
Total Lumber = 2403.73
Lumber = 601
Common Wire Nails = 36.06
*Lumber is 2" x 2" x 12'.
Thickness N Perimeter Total Area
0.3 2 6.6 3.96
0.15 0 0.48 1
pcs
bd f
pcs
kg
N of Plywood Lumber (bd. ft.)
2 40.66
5 101.65
3 60.99
4 81.32
∑Plywood = 14 pcs
∑Lumber = 284.62 bd f
335.88
74.64
373.2
335.88
354.54
317.22
116 pcs
2164.56 bd f
∑Plywood = 70 pcs
∑Lumber = 1423.1 bd f
N of Plywood Lumber (bd. ft.)
4 81.32
20.33
∑Plywood = 5 pcs
∑Lumber = 101.65 bd f
Doors
Mark Width Height N
D1 1.4 2.1 1
D2 3.2 2.1 1
D3 0.8 2.1 1
D4 0.7 2.1 6
D5 0.8 2.1 6
D6 2.5 2.1 1
∑Area =
Windows
W2 1.6 2.4 1
W3 2 1.2 2
W4 1.2 1 1
W5 1 1.2 1
W6 0.6 0.5 6
W7 1.2 2.1 1
W8 1.6 1.2 2
W9 1.2 2.1 1
∑Area =
Concrete Hollow Blocks
TOTAL AREA ∑AREA OF C,B,LB,D AND W Allowance (%) N
672.06 127.483 3 7011.43
Rebars - 10mmØ x 6m
Vertical Bars Horizontal Bars
Area
spacing (mm) Length spacing (mm)
672.06 600 1431.49 600
Tie Wires
Area Length (cm) Mass (kg)
672.06 30 29.57
Summary:
CHB = 7011.43 pcs
5.25
35.49
Area
18.9
3.84
4.8
1.2
1.2
1.8
2.52
3.84
2.52
3.84
44.46
Ø x 6m
Horizontal Bars N of 6m Stock
Total Length Length
Length
2217.80 3649.29 609
Excavation
TOTAL LABOR COST
UNIT COST
Back Fill
TOTAL LABOR COST
UNIT COST
UNIT COST
ABOR COST ₱5,600.00 5600
T COST (TDC) ₱5,600.00
COST ₱7,526.40
COST ₱5,644.80
COST ₱13,440.00
Project Name: PROPOSED TWO STOREY RESIDENTIAL BUILDING
Project Owner: MR. & MRS. JAMES IVAN MAGBANUA
Project Location: LOT 6, BLK-33 PUERTO REAL SUBDIVISION TABUC SUBA LA PAZ, Iloilo City
BILL OF MAT
DESCRIPTION
1. Excavation
2. Embankment
3. Back Fill
4. Gravel Bedding
sub total
D. CONCRETE WORKS
1. Cement (Portland Type 1)
2. Sand (Washed)
3. Gravel (20mmØ)
4. Ordinary Plywood (1/2" x 4' x 8')
1.1. 10mmØ x 6m
1.2. 10mmØ x 7.5m
1.3. 10mmØ x 9m
1.4. 10mmØ x 10.5m
1.5. 10mmØ x 12m
1.6. 12mmØ x 6m
1.7. 12mmØ x 7.5m
1.8. 12mmØ x 9m
1.9. 12mmØ x 10.5m
1.10. 12mmØ x 12m
1.11. 16mmØ x 6m
1.17. 25mmØ x 9m
1.18. 25mmØ x 10.5m
1.19. 25mmØ x 12m
2. Tie Wires
sub total
F. MASONRY WORKS
1. Concrete Hollow Block (CHB) - 150mm
2. Cement (Portland Type 1)
3. Sand (Washed)
4. Gravel
sub total
G. SCAFFOLDING WORKS
1. Lumber (2" x 2" x 12')
H. ROOFING WORKS
1. Angle Bars (2" x 2" x 1/4")
2. Metal Tile Long Span Roof (4mm)
8. J Bolt
9. Welding Electrodes E60
sub total
I. CARPENTTRY WORKS
1. Doors
1.5. D6 (1/2" thk. Clear Glass with Analok Frame Sliding Glass Door)
2. Windows
1.1. W1 (1/4" thk. Clear Glass Analok Frame Fix Window)
1.2. W2 (1/4" thk. Clear Glass Analok Frame Fix, Awning Window)
1.3. W3 (1/4" thk. Clear Glass Analok Frame Sliding Window)
1.4. W4 (1/4" thk. Clear Glass Analok Frame Sliding Window)
1.5. W5 (1/4" thk. Clear Glass Analok Frame Sliding Window)
1.6. W6 (1/4" thk. Clear Glass Analok Frame Awning Window)
1.9. W9 (1/4" thk. Clear Glass Analok Frame Fix, Awning Window)
1.10. W10 (1/4" thk. Clear Glass Analok Frame Fix Window)
3. Door & Window Frames
J. PAINTING WORKS
1. CONCRETE PRIMER
sub total
K. TILE WORKS
1. Tiles
SUMMARY:
A. TEMPORARY FACILITIES, MOBILIZATION AND DEMOBILIZATION
C.2. Embankment
C.3. Back Fill
F. MASONRY WORKS
G. SCAFFOLDING WORKS
H. ROOFING WORKS
I. CARPENTTRY WORKS
J. PAINTING WORKS
K. TILE WORKS
TOTAL MATERIAL COST
PROFIT
TAX (12 % of OCM + PROFIT + LABOR COST +
*Note: Electrical Works, Sanitary Works, and some Architectural Works were still not include
Prepared by:
BILL OF MATERIALS
131.92 m3 ₱57.05
28.14 m3 ₱385.00
107.25 m3 ₱52.63
6.74 m3 ₱800.00
sub total
39.62 m3 ₱1,165.00
79.23 m3 ₱1,200.00
123 sheet ₱660.00
601 pc ₱65.00
36.06 kg ₱80.00
sub total
834 pc ₱148.00
30 pc ₱185.00
91 pc ₱222.00
366 pc ₱259.00
20 pc ₱296.00
121 pc ₱213.00
43 pc ₱266.00
30 pc ₱320.00
42 pc ₱373.00
106 pc ₱426.00
114 pc ₱379.00
33 pc ₱473.00
99 pc ₱568.00
99 pc ₱663.00
69 pc ₱758.00
17 pc ₱1,008.00
10 pc ₱1,512.00
8 pc ₱1,764.00
8 pc ₱2,016.00
1014 kg ₱80.00
sub total
47.81 m3 ₱1,165.00
42.07 m3 ₱1,200.00
sub total
2172 pc ₱65.00
130.31 kg ₱80.00
sub total
102 pc ₱1,700.00
118.91 m2 ₱500.00
63 pc ₱980.00
X 240cm. Plain G.I. Sheet) 25.00 pc ₱243.00
20 pc ₱250.00
118.91 m2 ₱150.00
2033 pc ₱4.00
96.00 pc ₱50.00
200 pc ₱120.00
sub total
Type Door) 1 set ₱23,000.00
Glass with Analok Frame) 1 set ₱16,000.00
Type Door) 1 set ₱5,000.00
6 set ₱5,000.00
Type Door) 6 set ₱5,000.00
36 pc ₱91.00
40 gal ₱600.00
40 gal ₱550.00
4 gal ₱500.00
40 gal ₱550.00
10 pc ₱70.00
10 pc ₱33.00
sub total
les (0.6 x 0.6) 426 pc ₱120.00
les (0.4 x 0.4) 447 pc ₱75.00
les (0.2 x 0.2) 467 pc ₱57.00
130 kg ₱15.00
29 bag ₱200.00
sub total
PROFIT
TAX (12 % of OCM + PROFIT + LABOR COST + RENTAL COST)
₱50,000.00
₱13,440.00
₱7,526.40
₱10,834.71
₱5,644.80
₱5,389.90
₱29,395.81
₱185,640.00
₱46,153.59
₱95,080.36
₱81,180.00
₱39,065.00
₱2,884.48
₱450,003.43
₱123,432.00
₱5,550.00
₱20,202.00
₱94,794.00
₱5,920.00
₱25,773.00
₱11,438.00
₱9,600.00
₱15,666.00
₱45,156.00
₱43,206.00
₱15,609.00
₱56,232.00
₱65,637.00
₱52,302.00
₱17,136.00
₱15,120.00
₱14,112.00
₱16,128.00
₱81,108.05
₱734,121.05
₱112,182.86
₱224,380.00
₱55,703.75
₱50,482.29
₱442,748.90
₱141,180.00
₱10,424.77
₱151,604.77
₱173,400.00
₱59,455.50
₱61,662.23
₱6,075.00
₱5,000.00
₱17,836.65
₱8,132.00
₱4,800.00
₱24,000.00
₱360,361.38
₱23,000.00
₱16,000.00
₱5,000.00
₱30,000.00
₱30,000.00
₱16,000.00
₱50,000.00
₱10,000.00
₱18,000.00
₱5,000.00
₱6,000.00
₱9,000.00
₱9,000.00
₱18,000.00
₱10,000.00
₱9,000.00
₱3,276.00
₱44,720.00
₱115.20
₱312,111.20
₱24,000.00
₱22,000.00
₱2,000.00
₱22,000.00
₱700.00
₱330.00
₱71,030.00
₱51,120.00
₱33,525.00
₱26,619.00
₱35,360.00
₱5,980.00
₱1,950.00
₱5,800.00
₱160,354.00
₱50,000.00
₱13,440.00
₱7,526.40
₱10,834.71
₱5,644.80
₱5,389.90
₱450,003.43
₱734,121.05
₱442,748.90
₱151,604.77
₱360,361.38
₱312,111.20
₱71,030.00
₱160,354.00
₱2,748,559.34
₱1,374,279.67
₱412,283.90
₱4,535,122.90
₱544,214.75
₱362,809.83
₱323,230.58
₱1,230,255.16
₱5,791,989.26
Project Name: PROPOSED TWO STOREY RESIDENTIAL BUILDING
Project Owner: MR. & MRS. JAMES IVAN MAGBANUA
Project Location: LOT 6, BLK-33 PUERTO REAL SUBDIVISION TABUC SUBA LA PAZ, Iloilo City
BILL OF QUANTIT
DESCRIPTION
C. EARTH WORKS
1. Excavation
2. Embankment
3. Back Fill
4. Gravel Bedding
D. CONCRETE WORKS
F. MASONRY WORKS
G. SCAFFOLDING WORKS
H. ROOFING WORKS
I. CARPENTTRY WORKS
J. PAINTING WORKS
K. TILE WORKS
*Note: Electrical Works, Sanitary Works, and some Architectural Works were still not included.
Prepared by:
Amigleo & Susmeña
CIVIL ENGINEERS
BA LA PAZ, Iloilo City
BILL OF QUANTITIES
C. EARTHWORKS
TOTAL
% PROJECTED MONTHLY ACCOMPLISMENT
PHYSICAL ACCOMPLISHMENT
% CUMULATIVE PROJECTED ACCOMPLISHMENT
PHYSICAL ACCOMPLISHMENT % ACTUAL MONTHLY ACCOMPLISMENT
% CUMULATIVE ACTUAL ACCOMPLISHMENT
SLIPPAGE (CUMULATIVE)
PROJECTED MONTHLY ACCOMPLISMENT
CUMULATIVE PROJECTED ACCOMPLISHMENT
FINANCIAL ACCOMPLISHMENT
ACTUAL MONTHLY ACCOMPLISMENT
CUMULATIVE ACTUAL ACCOMPLISHMENT
1 unit Stake/Cargo Truck, 6 - 7 To
1 units Dump Truck, 4.0 - 5.0 cu.m
EQUIPMENT UTILIZATION SCHEDULE 1 unit Backhoe, 0.70 - 1.00 cu.m.
1 units 1-Bagger Concrete Mixer
1 units Concrete Vibrator
Project Engineer
Construction Foreman
Mason/Carpenter
Steelman
Stake Truck Driver
MANPOWER UTILIZATION SCHEDULE
Dump Truck Driver
Backhoe Operator
1-Bagger Concrete Mixer Operator
Painter
Laborer
ALENDAR DAYS
UARY 28, 2019
April 1, 2018
Start of Project
PARTICULARS
UNIT COST AMOUNT % WT Ap
CALENDAR DAYS 1-8
PROJECTED
₱104,880.00 ₱104,880.00 1.81%
ACTUAL 4
PROJECTED
₱13,440.00 ₱13,440.00 0.23%
ACTUAL
PROJECTED
ACTUAL
PROJECTED
₱57.05 ₱7,526.40 0.13%
ACTUAL
PROJECTED
₱807.58 ₱22,726.88 0.39%
ACTUAL
PROJECTED
₱52.63 ₱5,644.80 0.10%
ACTUAL
PROJECTED
₱3,009.12 ₱11,305.85 0.20%
ACTUAL
PROJECTED
₱11,913.21 ₱943,927.20 16.30%
ACTUAL
PROJECTED
₱411.05 ₱1,539,892.32 26.59%
ACTUAL
PROJECTED
₱1,381.89 ₱928,710.10 16.03%
ACTUAL
PROJECTED
₱318,006.16 ₱318,006.16 5.49%
ACTUAL
PROJECTED
₱755,894.02 ₱755,894.02 13.05%
ACTUAL
PROJECTED
₱654,684.45 ₱654,684.45 11.30%
ACTUAL
PROJECTED
₱95.05 ₱148,992.53 2.57%
ACTUAL
PROJECTED
₱1,303.06 ₱336,358.55 5.81%
ACTUAL
₱5,791,989.26 100.00%
HLY ACCOMPLISMENT
ECTED ACCOMPLISHMENT
ACCOMPLISMENT
UAL ACCOMPLISHMENT
VE)
LY ACCOMPLISMENT
TED ACCOMPLISHMENT
CCOMPLISMENT
L ACCOMPLISHMENT
Stake/Cargo Truck, 6 - 7 Ton Capacity 1
Dump Truck, 4.0 - 5.0 cu.m. capacity 1
Backhoe, 0.70 - 1.00 cu.m. capacity
1-Bagger Concrete Mixer 1
Concrete Vibrator 1
1
n 1
2
2
1
1
xer Operator 1
Reviewed by:
G H
C4
l 1, 2018
t of Project
2018
April May
9-16 17-24 25-30 1-8 9-16
4 6
44.76%
44.76%
2,592,445.98 3
2,592,445.98 5
-
-
1 1
1
1 1
1 1
1 1
1 1
2 5
2 5
1 1
1
1 1
3 12
May
17-24 25-31
I J J,A A
H K
May
Perc. (%)
17-24 25-31
5 100%
61
80%
4
3
60%
1
25
26
40%
24
15
4
12
20%
8
5
7
4
6
0%
55.24%
100.00%
3,199,543.28
5,791,989.26
-
- 0.00%
1
1
1
1
1
5
5
1
12
Recommended:
I,J J
(FINANCIAL)
april may
51,580.33 53,299.67
13,440.00
7,526.40
22,726.88
5,644.80
11305.85424
641870.492994958 302,056.70
1,302,985.81 236,906.51
386962.540694213 541,747.56
148,402.87 169,603.28
755894.0248147
654684.45312
148992.528
336358.5504
2,592,445.98 3,199,543.28
44.76% 100.00%
C.2,C.3,
,E
5 6
C,G
(PHYSICAL)
april may
0.89% 0.92%
0.23%
0.13%
0.39%
0.10%
0.20%
11.08% 5.22%
22.50% 4.09%
6.68% 9.35%
2.56% 2.93%
13.05%
11.30%
2.57%
5.81%
44.76% 55.24%
7
8 G
9
E,F
13 A,F,H,K,I,J 14 A,K,I,J 15
H,K,I
H 10 H,K
NAME OF PROJECT :
CONTRACT NO. :
NAME OF CONTRACTOR :
CONTRACT AMOUNT :
NOTICE TO PROCEED :
CONTRACT DURATION :
TARGET DATE OF COMPLETION :
C. EARTHWORKS
TOTAL
% PROJECTED MONTHLY ACCO
% CUMULATIVE PROJECTED AC
PHYSICAL ACCOMPLISHMENT % ACTUAL MONTHLY ACCOMP
% CUMULATIVE ACTUAL ACCO
SLIPPAGE (CUMULATIVE)
PROJECTED MONTHLY ACCOM
CUMULATIVE PROJECTED ACCO
FINANCIAL ACCOMPLISHMENT
ACTUAL MONTHLY ACCOMPLIS
CUMULATIVE ACTUAL ACCOM
2
2
EQUIPMENT UTILIZATION SCHEDULE 1
2
1
Project Engineer
Construction Foreman
Mason/Carpenter
Steelman
Stake Truck Driver
MANPOWER UTILIZATION SCHEDULE Dump Truck Driver
Backhoe Operator
1-Bagger Concrete Mixer Opera
Painter
Laborer
PARTICULARS
QTY UNIT COST AMOUNT % WT November
CALENDAR DAYS 1-8
PROJECTED
1 ₱104,880.00 ₱104,880.00 1.81%
ACTUAL
PROJECTED
1 ₱13,440.00 ₱13,440.00 0.23%
ACTUAL
PROJECTED
ACTUAL
PROJECTED
131.92 ₱57.05 ₱7,526.40 0.13%
ACTUAL
PROJECTED
28.14 ₱807.58 ₱22,726.88 0.39%
ACTUAL
PROJECTED
107.25 ₱52.63 ₱5,644.80 0.10%
ACTUAL
PROJECTED
3.76 ₱3,009.12 ₱11,305.85 0.20%
ACTUAL
PROJECTED
79.23 ₱11,913.21 ₱943,927.20 16.30%
ACTUAL
PROJECTED
3,746 ₱411.05 ₱1,539,892.32 26.59%
ACTUAL
PROJECTED
672.06 ₱1,381.89 ₱928,710.10 16.03%
ACTUAL
PROJECTED
1.00 ₱318,006.16 ₱318,006.16 5.49%
ACTUAL
PROJECTED
1.00 ₱755,894.02 ₱755,894.02 13.05%
1.00 ₱755,894.02 ₱755,894.02 13.05%
ACTUAL
PROJECTED
1.00 ₱654,684.45 ₱654,684.45 11.30%
ACTUAL
PROJECTED
1,567.46 ₱95.05 ₱148,992.53 2.57%
ACTUAL
PROJECTED
258.13 ₱1,303.06 ₱336,358.55 5.81%
ACTUAL
₱5,791,989.26 100.00%
JECTED MONTHLY ACCOMPLISMENT
MULATIVE PROJECTED ACCOMPLISHMENT
UAL MONTHLY ACCOMPLISMENT
MULATIVE ACTUAL ACCOMPLISHMENT
AGE (CUMULATIVE)
ECTED MONTHLY ACCOMPLISMENT 23,9
LATIVE PROJECTED ACCOMPLISHMENT 23,9
AL MONTHLY ACCOMPLISMENT
LATIVE ACTUAL ACCOMPLISHMENT
unit Stake/Cargo Truck, 6 - 7 Ton Capacity 1
units Dump Truck, 4.0 - 5.0 cu.m. capacity 1
unit Backhoe, 0.70 - 1.00 cu.m. capacity 1
units 1-Bagger Concrete Mixer
units Concrete Vibrator
t Engineer 1
uction Foreman 1
n/Carpenter 6
man
Truck Driver 1
Truck Driver 1
oe Operator 1
ger Concrete Mixer Operator 1
r
er 10
C3 C3,C2 C2
A, B,C
C1,E C1,D,E D,E D,E,F
B 1
November 1, 2018
Start of Project C4 G
2018
November December January February March
9-16 17-24 25-30 1-8 9-16 17-24 25-31 1-8 9-16 17-24 25-31 1-8 9-16 17-24 25-28 1-8
0.41% 5.41% 11.96% 12.83% 13.
0.41% 5.82% 17.79% 30.62% 44.
1 1 1 1 1
1 1 1 1 1
6 6 10 15 15
5 8 8 8
1 1 1 2 2
1 2 1 2 1
1 1 1 1 1
1 1 1 1 1
1 2 2 2
10 15 20 20 20
PERT/CPM
A,G,H,I,J,K,L
D,F D,F,I F,I A,I,J,K
2019
March April May June
9-16 17-24 25-31 1-8 9-16 17-24 25-30 1-8 9-16 17-24 25-31 1-8 9-16 17-24 25-30
100%
80%
60%
40%
20%
20%
1 1 1 1
1 1 1 1
15 15 20 10
8 8 5
2 2 2 1
1
1
1 1 1 1
2 2 2
20 20 25 15
(FINANCIAL)
november
Perc. (%)
100%
242 13,001.65
30 9,856.00
80%
36 1,045.33
36
39
60%
15
150
151
40%
143
134
61
20%
20%
45
30
53
0%
23,902.99
0.00% 0.41%
Recommended:
(FINANCIAL)
3,584.00
6,481.07
17,676.47 5,050.42
2,171.08 3,473.72
11305.85424
5.82%
(PHYSICAL)
0.17%
0.02%
188785.439116164 151028.351292931
305,938.87 81,583.70
194,834.29 201,328.76
148992.528
145966.918098113 190391.63230189
0.41%
0 0.41%
(PHYSICAL)
0.06%
0.11%
0.31% 0.09%
0.04% 0.06%
0.20%
2.57%
2.52% 3.29%