Risk Assessment for Waterproofing Project
Risk Assessment for Waterproofing Project
Project Abu Dhabi Future School Program - Phase 8, Package 1, Al Falah KG
NOTE:- This Risk Assessment is prepared in line with the METHOD STATEMENT for Waterproofing Rev. 00; and it covers all activities described
in this Method Statement.
1
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
Material Delivery Falling of materials Workers, 3 4 12 H Ensure that all the pickup driver AEGC 1 3 3 L OSHAD-SF–COP
on Site Drivers, company/suppliers are informed 1.0 – Hazardous
Collision of Property Materials - V 3.0
about the project safety requirements
delivery truck/pick damage, prior to the delivery of the materials.
up with men and flagman, public OSHAD-SF–COP
materials. Ensure that all drivers and vehicle 2.0 – Personal
comply with the safety requirements. Protective
Slips, Trips & falls, Ensure that the delivery truck is Equipment - V 3.0
inspected at the project gate by the
2
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
3
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
4
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
Use of Hand Striking hand or Workers, 3 3 9 H Proper body position and safety glass AEGC 1 2 2 L OSHAD-SF –COP
Tools arms when using Personnel with side shields. 08.0 – General
hammer walking nearby Tool to be suitable for the purpose Workplace
intended and maintained in good Amenities – V 3.0
Struck by flying
object metals chips working order. Tools to be inspected OSHAD-SF –COP
etc. regularly in accordance with 14.0 – Manual
manufacturer’s instructions. Handling and
Eye injuries Hand gloves should be used when Ergonomics – V 3.0
using hand tools.
Laceration when OSHAD-SF– COP
using sharp tools All operatives to be given instructions
in the safe use of hand tools as part 47.0 – Machine
Defective tools Guarding Version
of their skill training. Tools which may
deteriorate are to be checked on a OSHAD-SF – CoP
regular basis and maintained or 36.0 – Plant and
replaced as necessary. Equipment – V 3.0
First Aider and First Aid items to be 3.0
made available on site.
OSHAD-SF –
Ensure that cables are routed safely
COP 35.0 –
and don’t pose a tripping hazard for
Portable Power
the workers/engineers etc
5
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
OSHAD-SF –
Element 6 -
Emergency
Management
OSHAD-SF –
COP 4.0 – First Aid
and Medical
Emergency
Treatment - V 3.0
6
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
OSHAD-SF –
the MSDS (Material Safety Data Element 2 - Risk
Sheet). Management
Ensure that the area is barricaded OSHAD SF-
while carrying out waterproofing Element- 5 –
works. Training and
Ensure that certified first Aider and awareness and
First Aid items and Eye Wash stations competency
are available on site. Emergency
OSHAD-SF –
arrangements to be made available.
Element 6 -
Emergency
Management
Unauthorized Workers, H Ensure the area is barricaded and AEGC 1 2 L OSHAD-SF - CoP
access Public, Staff 2 4 8 Suitable Signage is displayed to 22.0 – Barricading
7
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
of Hazards –
Version 3.0
prevent unauthorized access is 2
OSHAD-SF –
prohibited. CoP 17.0 – Safety
Signage and
Signals – V 3.0
8
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
OSHAD SF-
Element- 5 –
9
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
Training &
awareness and
competency
OSHAD-SF–
Element 6 -
Emergency
Management
10
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
OSHAD-SF –
Element 6 -
Emergency
Management
11 Emergency Fire All personnel 3 4 12 H All personnel to be safety inducted. AEGC 1 3 3 L OSHAD-SF –
situations Train and inform all employees Codes of Practice
Collision CoP 17.0 – Safety
regarding fire Emergency Evacuation
Electrocution Plan. Signage and
Initiate and maintain good Signals – Version
Failure to housekeeping 3.0
Evacuation
Ensure that all materials used in porta OSHAD-SF –
cabin construction are fire rated. Codes of Practice
Ensure that enough firefighting CoP 43.0 –
equipment are made available on Temporary
site. ( Fire Ex., Fire Hose Reel) Structures - Version
Ensure that fire alarm and Fire siren 3.0
are available on site and are fully
OSHAD-SF –
functional.
Codes of Practice
No smoking in non-designated areas. CoP 08.0 – General
Ensurre that smoke detectors are Workplace
installed inside all offices. Amenities – Version
Ensure that workers are trained- how 3.0
to fight fire, what to do in case of an
emergency OSHAD SF-
11
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
12
RISK ASSESSMENT
Document Risk Assessment
Abu Dhabi Future School Program - Phase 8,
Ref: No AEGC-KG-RA - 008
Package 1, Al Falah KG Sector 1C plot P3
Rev. 00
Date.
RISK LEVEL Control Measures Action By RESIDUAL RISK LEVEL Legal Reference
S.No Activity HAZARD & RISK Groups Exposed
P S R RL P S R RL
I have read, understood and accept the conditions of this method statement & Risk Assessment.
Name of Job Supervisor/Foremen/Site Engineer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
All operatives involved with this job must sign below
I have read, understood and accept the conditions of this method statement and Risk Assessment.