SIDE : PM-305 MIRROR WORK TITLE: GP2 GROUTING GROUTING INSPECTION CHECK LIST
DATE :
PROJECT OWNER: ALLEIMA INDIA PVT LTD RAJPUR CONSULTANT: LOCATION :
BUILDING :
MAIN MATERIAL :
CONCESSIONAIRE : PMC JLL CONTRACTOR : MARS ENTERPRISES START OF INSPECTION :
FINISH OF INSPECTION :
PREPARATION
No. DESCRIPTION OK NO REMARKS
1 Roughning (sufficent/ approved) Thick saw and hack out all unsound concrete
2 Cleanliness of Surface Free of dirt, oil, grease, loose material
3 Temperature (as per manufacture spec.) Minimum 10 oC - Maximum 40 oC
4 Thickness Not Exceeds 100mm Coarse aggregate needed if > 100mm
5 Formwork (size, firmly & water tight) Recommended to apply easy removal agent
6 Calculation Material to be Used To mix materials in sufficient amount
MATERIAL
No. DESCRIPTION OK NO REMARKS
1 Grouting Material Fosroc Conbextra approved material
2 Condition of Material
3 Water Clean water
4 Bonding SBR chemical Should be approved material
6 Clean Coarse Aggregate 10mm (if needed) Needed for thickness exceeds 100mm
7 Curring
EQUIPMENT
No. DESCRIPTION OK NO REMARKS
1 Low Speed Drill with Mixing Paddle max. 500-600 rpm
2 Container Clean and in sufficient size
3 Shovel/ Trowel/Spatula Note: immediately clean by water after use
APPLICATION (After all stipulated above are OK)
No. DESCRIPTION OK NO REMARKS
1 Damp the Surface of Concrete Saturated surface dry, but no standing water
2 Mixing until Even and Consistent 2-3 minutes
3 Pouring/ application Immediately and no leaking of form work
4 Thickness of Pouring Min. 10 mm, max. 100 mm per pour
RECORDING
No. DESCRIPTION RECORD REMARKS
1 Temperature oC
2 Batch Number IN1MF00792470A4
3 Quantity of Grouting Material kg Fosroc Conbextra: 30kg/ bag
4 Quantity of Water ltr flowable 4.5 ltr/ bag
5 Quantity of Coarse Aggregate (if needd) kg Maximum 50%
6 Time of Finished Mixing AM/PM Mixing 2-3 minutes,
7 Time of Finished Application AM/PM
9 During and After Treatment Photograph
INSPECTED BY: VERIFIED BY:
DATE: DATE: