Doc. No.
: YB-CH-HSE-CTCE-0013
Concrete
Check for proper working (PCC)
conditions of WORK ‐ CHECKLIST
hand tools such as shovels, trowels,
9 0
and levels. Rev No.:
Rev Date:
Implement dust suppression measures during cement handling.
10 Page No. ‐1‐ 1
Name of Project Location Inspected by: Muhammad
Ensure spill kits for handling chemical or material spills.
11 YAS ISLAND Designation: HSE ENG
RESIDENTIAL BUILDING AT PLOT C-33
Monitor weather conditions to avoid placing PCC during rain or extreme Sign:
12
heat.
Date:
Use proper equipment for pouring concrete to avoid manual handling
13
injuries.
Name of Contractor: ‐ CTCE
Use vibrators carefully to avoidSAFETY
over-vibration
CHECKS and ensure proper YES NO
14
ergonomics for operators.
1 Check Team have valid work permit?
Check & Ensure toolbox talk conducted via supervisor before each
15
start work.
Check the all worker’s wearing proper PPE’S?
2 Safety helmets
Ensure tools are used for their intended purpose and are stored
Safety boots
16
safely
Gloveswhen not in use. if handling cement)
(chemical-resistant
Safety goggles
Dust masks (for handling dry cement)
Emergency Contact List: Display emergency contact numbers clearly
Reflective vests
17
on-site.
Ensure a first aid kit is available and first aiders are on-site.
3
Ensure a designated area for washing out concrete tools and
18
equipment.
Confirm safe access and exit points for workers and equipment.
4
Check that the ground is leveled, compacted, and stable to prevent worker or
5 equipment accidents
Ensure adequate drainage to prevent water accumulation during work.
6
Ensure proper lighting, especially for night work or low-visibility conditions.
7
Inspect that concrete vibrators are functioning properly and operators are
8
trained in their use.