1 2 3 4 5 6 7 8 9 10 11 12 13 14
A
FIRST FLOOR LEVEL
FFL +10750
FIRST FLOOR LEVEL
FFL +10750
GHE
250
CONSULTANT ENGINEER
GULF HOUSE ENGINEERING
Architects & Engineers
MANAMA I KINGDOM OF BAHRAIN I LIC.NO.EPP/BN/105
TEL +973 17 822666 I FAX +973 17 820666 I www.ghe.com.bh
1975
B
ISO 9001, ISO 14001 and ISO 45001
200
PROJECT
+ 2400 + 2400 + 2400 + 2400
200
200
LVL LVL LVL LVL
200
KINGDOM OF BAHRAIN
1200
1200
MR-01
SA-03 W-05 MR-01 W-05 OWNER
C MR-01 W-05 W-05
2200
2200
2400
2400
D-18
W-03
SF-01
W-03
SF-01
D-18
W-03 W-03
EAGLE HILLS
SW-01 SW-01
SUB CONSULTANTS
1200
1200
ST-01 ST-01
SW-02
D SW-01 SF-01 ST-01
GROUND FLOOR LEVEL GROUND FLOOR LEVEL
FFL +6250 FFL +6250
10
10
NOTE
1. THIS DRAWING IS THE PROPERTY OF :
GULF HOUSE ENGINEERING, Architects, Engineers
2. REPRODUCING ITS CONTENTS IN ANY FORM EXCEPT FOR THE
PURPOSE OF WHICH IT IS INTENDED, IS PROHIBITED.
1 TOILET DETAIL - SECTION 01 2 TOILET DETAIL - SECTION 02 3. THIS DRAWING IS NOT TO BE SCALED, STATED DIMENSIONS ARE
1 : 25 1 : 25 ONLY TO BE CONSIDERED.
4. ALL DIMENSIONS ARE TO BE VERIFIED ON SITE AS PER ACTUAL SITE
E CONDITION PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION WORK.
5. ANY DISCREPANCIES IN DIMENSIONS & OR INFORMATION SHOULD BE
BROUGHT TO THE ATTENTION OF THE CONSULTANT IN WRITING.
6. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH STRUCTURAL,
MEP AND INFRASTRUCTURE DRAWINGS etc.
7. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS,
CONDITIONS OF CONTRACT, etc.
8. CONTRACTOR SHOULD CO-ORDINATE ALL WORKS WITH THE
STRUCTURAL, MEP, LANDSCAPE, INFRASTRUCTURE DRAWINGS etc.
9. SURROUNDING LEVELS VARIES AS PER HIGHEST POINT OF FOOTPATH
PROVIDED FROM INFRASTRUCTURE.
FIRST FLOOR LEVEL FIRST FLOOR LEVEL ISSUE / REVISION
FFL +10750 FFL +10750
F
00 14/09/2023 ISSUED FOR CONSTRUCTION N.E. KH.S.
G
REV DATE DESCRIPTION BY CHK'D
KEY PLAN
200
200
+ 2400 + 2400 + 2400 + 2400 NOR
200
TH
LVL LVL LVL LVL
210
1200
1200
1200
MR-01 SA-03
H
W-05 W-05
W-05 W-05
2400
2400
2400
D-15 D-15 D-15
2200
W-03 W-03
SA-03
W-03 W-03 SHEET TITLE
1200
1200
1200
MARASSI TERRACES 1
I Plot 135
SW-01 SF-01 ST-01 SW-01 SF-01
GROUND FLOOR LEVEL GROUND FLOOR LEVEL
TOILET DETAILS-02
10
10
10
FFL +6250 FFL +6250
ISSUE FOR
CONCEPT SCHEMATIC MUNICIPAL
DETAIL DESIGN TENDER FOR CONSTRUCTION
PROJECT NO. BH21-R049 SCALE 1:25 ON A1 SHEET SIZE
J DRAWN BY CHECKED BY APPROVED BY DESIGNED BY
N.E. KH.S. A.A. A.BUCHEERY
3 TOILET DETAIL - SECTION 03 4 TOILET DETAIL - SECTION 04
1 : 25 1 : 25 ISSUE DATE SHEET NO REV
AUG. 2023
AR-T1-876 00
FILE NAME: