The document contains load calculations for various two-way slabs for a proposed hotel building in Paje, Zanzibar, prepared by Abshir Kh. Mbarouk. It includes inputs for dimensions, load factors, and calculations for both factored and non-factored loads for multiple slabs. Each slab's ultimate load is calculated based on specific formulas and parameters provided in the document.

Uploaded by

lau
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views35 pages

KANUNI

The document contains load calculations for various two-way slabs for a proposed hotel building in Paje, Zanzibar, prepared by Abshir Kh. Mbarouk. It includes inputs for dimensions, load factors, and calculations for both factored and non-factored loads for multiple slabs. Each slab's ultimate load is calculated based on specific formulas and parameters provided in the document.

Uploaded by

lau
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

4/25/2025 LOAD CALCULATION FOR TWO WAY SLAB

ASSUMETHE FOLLOWING FIGURES

ENTER THE FOLLOWING VALUE


SLAB
L1 = 6 m L3 = 3 m THICKNES
L2 = 3 m L4 = 3 m 150

prtn = 2.5 KN/m2 finish 2 KN/m2


QK = 1.5 GK 8.1
OK
TOTAL FACTORED LOAD = 13.74
TOTAL NON-FACTORED LOAD = 9.6

L1/L4 2 OK
L2/L3 1 NOT OK, L2>L3

ULTIMATE LOAD

BEAM 1 - 1 = 0.625*Q*Lx = 12.8812 KN/m


BEAM 2 - 2 = 0.625*Q*Lx = 25.7625 KN/m
BEAM 3 - 3 = 0.625*Q*Lx = 12.8812 KN/m

BEAM A - A = Q*Lx*(1-1/(2α^2)+1/(8*α^3) 18.3558


= KN/m
BEAM B - B = Q*Lx*(1-1/(2α^2)+1/(8*α^3) 36.7116
= KN/m
preapred by ABSHIR KH. MBAROUK / 0712 276 582 -2018
BEAM C - C = Q*Lx*(1-1/(2α^2)+1/(8*α^3) 12.8813
= KN/m

NON-FACTORED LOAD
BEAM 1 - 1 = 0.625*Q*Lx = 9 KN/m
BEAM 2 - 2 = 0.625*Q*Lx = 18 KN/m
BEAM 3 - 3 = 0.625*Q*Lx = 9 KN/m

BEAM A - A = Q*Lx*(1-1/(2α^2)+1/(8*α^3)12.825
= KN/m
BEAM B - B = Q*Lx*(1-1/(2α^2)+1/(8*α^3)25.65
= KN/m
BEAM C - C = Q*Lx*(1-1/(2α^2)+1/(8*α^3)9= KN/m

OK

OK

preapred by ABSHIR KH. MBAROUK / 0712 276 582 -2018


PROFFESIONAL SCIENCE AND TECHNOLOGY CONSULTANCY COMPANY LIMITED
Subject Project Ref: DATE
PROPOSED HOTEL BUILDING TO BE BUILT
AT PAJE - ZANZIBAR …………………. OCTOBER, 2020

Calculation By: Cheacked by Sheet No:


ABSHIR KH. MBAROUK ENG. HAMISI JUMANNE MAULID SLAB S1

11/10/2019 LOAD CALCULATION FOR TWO WAY SLAB SINGLE SIDE

ENTER THE FOLLOWING VALUE


SLAB
L1 = 3.35 m L2 = 2.75 m THICKNES
prtn = 2.5 KN/m2 finish = 1.8 KN/m2 150
QK = 3 7.9
OK
TOTAL FACTORED LOAD = 15.86
TOTAL NON-FACTORED LOAD = 10.9
L1/L4 1.21818 OK

ULTIMATE LOAD
TRINGULAR = 0.625*Q*Lx 13.6297 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
15.9677

NON-FACTORED LOAD
TRINGULAR = 0.625*Q*Lx 9.36719 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3)
10.974= KN/m

preapred by ABSHIR KH. MBAROUK / 0712 276 582 -2018


PROFFESIONAL SCIENCE AND TECHNOLOGY CONSULTANCY COMPANY LIMITED
Subject Project Ref: DATE
PROPOSED HOTEL BUILDING TO BE BUILT
AT PAJE - ZANZIBAR …………………. OCTOBER, 2020

Calculation By: Cheacked by Sheet No:


ABSHIR KH. MBAROUK ENG. HAMISI JUMANNE MAULID SLAB 2
11/10/2019

ENTER THE FOLLOWING VALUE


SLAB
L1 = 3.5 m L2 = 3.35 m THICKNES
prtn = 2.5 KN/m2 finish 1.8 KN/m2 150
QK = 3 7.9
OK
TOTAL FACTORED LOAD = 15.86
TOTAL NON-FACTORED LOAD = 10.9
L1/L4 1.04478 OK

ULTIMATE LOAD
TRINGULAR = 0.625*Q*Lx 16.6034 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
17.3087

NON-FACTORED LOAD
TRINGULAR = 0.625*Q*Lx 11.4109 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
11.8956

preapred by ABSHIR KH. MBAROUK / 0712 276 582 -2018


PROFFESIONAL SCIENCE AND TECHNOLOGY CONSULTANCY COMPANY LIMITED
Subject Project Ref: DATE
PROPOSED HOTEL BUILDING TO BE
BUILT AT PAJE - ZANZIBAR …………………. OCTOBER, 2020

Calculation By: Cheacked by Sheet No:


ABSHIR KH. MBAROUK ENG. HAMISI JUMANNE MAULID SLAB 3
###

ENTER THE FOLLOWING VALUE


SLAB
L1 = 3.35 m L2 = 3.25 m THICKNES
prtn = 2.5 KN/m2 finish 1.8 KN/m2 150
QK = 3 7.9
OK
TOTAL FACTORED LOAD = 15.86
TOTAL NON-FACTORED LOAD = 10.9
L1/L4 1.03077 OK

ULTIMATE LOAD
TRINGULAR = 0.625*Q*Lx 16.1078 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
16.5857

NON-FACTORED LOAD
TRINGULAR = 0.625*Q*Lx 11.0703 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
11.3987

preapred by ABSHIR KH. MBAROUK / 0712 276 582 -2018


PROFFESIONAL SCIENCE AND TECHNOLOGY CONSULTANCY COMPANY LIMITED
Subject Project Ref: DATE
PROPOSED HOTEL BUILDING TO BE
BUILT AT PAJE - ZANZIBAR
…………………. OCTOBER, 2020

Calculation By: Cheacked by Sheet No:


ABSHIR KH. MBAROUK ENG. HAMISI JUMANNE MAULID SLAB M
###

ENTER THE FOLLOWING VALUE


SLAB
L1 = 6.6 m L2 = 5.5 m THICKNES
prtn = 3.5 KN/m2 finish 1.8 KN/m2 150
QK = 3 8.9
OK
TOTAL FACTORED LOAD = 17.26
TOTAL NON-FACTORED LOAD = 11.9
L1/L4 1.2 OK

ULTIMATE LOAD
TRINGULAR = 0.625*Q*Lx 29.6656 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
34.4176

NON-FACTORED LOAD
TRINGULAR = 0.625*Q*Lx 20.4531 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
23.7294

preapred by ABSHIR KH. MBAROUK / 0712 276 582 -2018


PROFFESIONAL SCIENCE AND TECHNOLOGY CONSULTANCY COMPANY LIMITED
Subject Project Ref: DATE
PROPOSED HOTEL BUILDING TO BE
BUILT AT PAJE - ZANZIBAR …………………. OCTOBER, 2020

Calculation By: Cheacked by Sheet No:


ABSHIR KH. MBAROUK ENG. HAMISI JUMANNE MAULID SLAB N
###

ENTER THE FOLLOWING VALUE


SLAB
L1 = 6.7 m L2 = 5.5 m THICKNES
prtn = 2.5 KN/m2 finish 2 KN/m2 150
QK = 3 8.1
OK
TOTAL FACTORED LOAD = 16.14
TOTAL NON-FACTORED LOAD = 11.1
L1/L4 1.21818 OK

ULTIMATE LOAD
TRINGULAR = 0.625*Q*Lx 27.7406 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
32.4992

NON-FACTORED LOAD
TRINGULAR = 0.625*Q*Lx 19.0781 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
22.3508

preapred by ABSHIR KH. MBAROUK / 0712 276 582 -2018


PROFFESIONAL SCIENCE AND TECHNOLOGY CONSULTANCY COMPANY LIMITED
Subject Project Ref: DATE
PROPOSED HOTEL BUILDING TO BE
BUILT AT PAJE - ZANZIBAR …………………. OCTOBER, 2020

Calculation By: Cheacked by Sheet No:


ABSHIR KH. MBAROUK ENG. HAMISI JUMANNE MAULID SLAB K
###

ENTER THE FOLLOWING VALUE


SLAB
L1 = 6.6 m L2 = 6 m THICKNES
prtn = 2.5 KN/m2 finish 1.8 KN/m2 150
QK = 3 7.9
OK
TOTAL FACTORED LOAD = 15.86
TOTAL NON-FACTORED LOAD = 10.9
L1/L4 1.1 OK

ULTIMATE LOAD
TRINGULAR = 0.625*Q*Lx 29.7375 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
32.3873

NON-FACTORED LOAD
TRINGULAR = 0.625*Q*Lx 20.4375 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
22.2586

preapred by ABSHIR KH. MBAROUK / 0712 276 582 -2018


PROFFESIONAL SCIENCE AND TECHNOLOGY CONSULTANCY COMPANY LIMITED
Subject Project Ref: DATE
PROPOSED HOTEL BUILDING TO BE
BUILT AT PAJE - ZANZIBAR …………………. OCTOBER, 2020

Calculation By: Cheacked by Sheet No:


ABSHIR KH. MBAROUK ENG. HAMISI JUMANNE MAULID SLAB L
###

ENTER THE FOLLOWING VALUE


SLAB
L1 = 6.7 m L2 = 6 m THICKNES
prtn = 2.5 KN/m2 finish 1.8 KN/m2 150
QK = 2 7.9
OK
TOTAL FACTORED LOAD = 14.26
TOTAL NON-FACTORED LOAD = 9.9
L1/L2 1.11667 OK

ULTIMATE LOAD
TRINGULAR = 0.625*Q*Lx 26.7375 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
29.4665

NON-FACTORED LOAD
TRINGULAR = 0.625*Q*Lx 18.5625 KN/m
TRAPEZOIDAL = Q*Lx*(1-1/(2α^2)+1/(8*α^3) = KN/m
20.4571

preapred by ABSHIR KH. MBAROUK / 0712 276 582 -2018


PROFFESIONAL SCIENCE AND TECHNOLOGY CONSULTANCY COMPANY LIMITED
Subject Project Ref: DATE
PROPOSED HOTEL BUILDING TO BE BUILT
AT PAJE - ZANZIBAR …………………. OCTOBER, 2020

Calculation By: Cheacked by Sheet No:


ABSHIR KH. MBAROUK ENG FAUZIA S. HASSAN SLAB S7

ENTER THE FOLLOWING VALUE


SLAB
L1 = 4.8 m L2 = 2.4 m THICKNES
prtn = 2.5 KN/m2 finish 1.8 KN/m2 150
QK = 2 7.9
OK
TOTAL FACTORED LOAD = 14.26
TOTAL NON-FACTORED LOAD = 9.9
L1/L2 2 OK
slab is two way, use the upper case

ULTIMATE LOAD

ONE SIDED LOAD = 0.5*Q*Lx = 17.112 KN/m

NON-FACTORED LOAD

ONE SIDED LOAD = 0.5*Q*Lx = 11.88 KN/m

preapred by ABSHIR KH. MBAROUK / 0712 276 582 -2018


11/13/2019 SUBFRAME ANALYSIS METHOD THREE SPAN CONTINOUS BEAMS 5-5
Beam Dimension SPAN LENGTH NOTE: Carefull fill in the cell written in the Blue ink
H(m) 0.55 L1(m) 6.60 for password call 0712276582
B(m) 0.3 L2(m) 6.70 The following abriv. Can help you to use this sheet
L3(m) 6.70 L1,L2,L3 Effective span of the beam
H(m) Depth of the beam
LOAD Column Dimension B(m) base of the beam
W1(KN/m) 28.22 h(m) 0.45 h(m) larger side of the column
W2(KN/m) 30.81 b(m) 0.3 b(m) Smaller side of the column
W3(KN/m) 30.81 Lcr column 3.50 W1,W2,W3 Uniform distributed load in KN/M
IB 0.0041594 IC 0.00227813
col AB BA col BC CB col CD DC col
K 0.0006509 0.00063021 0.00063021 0.00065089 0.0006208 0.0006208 0.0006509 0.0006208 0.0006208 0.00065089
JOINT A B C D
MEMBER COL AB BA COL BC CB COL CD DC COL
r 0.51 0.49 0.33 0.34 0.33 0.33 0.34 0.33 0.49 0.51
FEM -102.45 102.45 -115.25 115.25 -115.25 115.25
DEM 52.05 50.40 4.24 4.38 4.24 0.00 0.00 0.00 -56.26 -58.99
CO 2.12 25.20 0.00 2.12 -28.13 0.00
DEM -1.08 -1.04 -8.35 -8.62 -8.35 8.53 8.95 8.53 0.00 0.00
CO -4.17 -0.52 4.27 -4.17 0.00 4.27
DEM 2.12 2.05 -1.24 -1.28 -1.24 1.37 1.44 1.37 -2.08 -2.18
CO -0.62 1.03 0.68 -0.62 -1.04 0.68
DEM 0.32 0.31 -0.57 -0.59 -0.57 0.55 0.57 0.55 -0.33 -0.35
CO -0.28 0.15 0.27 -0.28 -0.17 0.27
DEM 0.14 0.14 -0.14 -0.15 -0.14 0.15 0.16 0.15 -0.13 -0.14
CO -0.07 0.07 0.07 -0.07 -0.07 0.07
DEM 0.04 0.04 -0.05 -0.05 -0.05 0.04 0.05 0.04 -0.04 -0.04
CO -0.02 0.02 0.02 -0.02 -0.02 0.02
DEM 0.01 0.01 -0.01 -0.01 -0.01 0.01 0.01 0.01 -0.01 -0.01
CO -0.01 0.01 0.01 -0.01 -0.01 0.01
DEM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUM 53.60 -53.60 122.27 -6.32 -116.04 122.85 11.17 -134.019 61.71 -61.71 SUPORT MOMENT
26.80 -3.16 5.59 -30.86
90.70 95.57 102.19 104.22 113.999 92.41 SHEAR FORCE
3.21 9.92 17.000
92.14 53.44 76.895 SPAN MOMENT

SUMMARY OF ESIGN DATA


DESIGN SUPPORT MOMENT = 134.02 KNm
DESIGN SPAN MOMENT = 92.14 KNm
DESIGN MOMENT OF THE COLUMN = 30.86 KNm

PREPARED BY ENG. ABSHIR KH. MBAROUK/ +255 712 276 582


DESIGN SHEAR FORCE = 114.00 KN

PREPARED BY ENG. ABSHIR KH. MBAROUK/ +255 712 276 582


4/25/2025 SUBFRAME ANALYSIS METHOD FOUR SPAN CONTINOUS BEAMS

Beam Dimension SPAN LENGTH NOTE: Carefull fill in the cell written by the Blue ink
H(m) 0.335 L1(m) 5.11 for password call for 0712276582
B(m) 0.2 L2(m) 5.09 The following abriv. can help you to use this sheet
L3(m) 5.11 L1,L2,L3 Effective span of the beam
L4(m) 5.09 H(m) Depth of the beam
LOAD B(m) Base of the beam
W1(KN/m) 26.80 Colum Dimension h(m) Larger side of the column
W2(KN/m) 26.80 h(m) 0.35 b(m) Smaller side of the column
W3(KN/m) 26.80 b(m) 0.2 W1,W2,W3 Uniform distributed load in KN/m
W4(KN/m) 26.80 Lcr column 3.20
Lcr column critical length of the column
IB 0.000627 IC 0.000715
col AB BA col BC CB col CD DC col DE ED col
K 0.000223 0.000123 0.000123 0.000223 0.0001231 0.000123 0.00022331 0.00012262 0.000123 0.000223 0.0001231 0.0001231 0.00022331
JOINT A B C D E
MEMBER COL AB BA COL BC CB COL CD DC COL DE ED COL
r 0.65 0.35 0.26 0.48 0.26 0.26 0.48 0.26 0.26 0.48 0.26 0.36 0.64
FEM -58.32 58.32 -57.86 57.86 -58.32 58.32 -57.86 57.86
DEM 37.65 20.67 -0.12 -0.22 -0.12 0.12 0.22 0.12 -0.12 -0.22 -0.22 -20.56 -37.30
CO -0.06 10.34 0.06 -0.06 -0.06 0.06 -10.28 -0.11
DEM 0.04 0.02 -2.72 -4.95 -2.72 0.03 0.06 0.03 2.67 4.87 2.68 0.04 0.07
CO -1.36 0.01 0.02 -1.36 1.34 0.02 0.02 1.34
DEM 0.88 0.48 -0.01 -0.01 -0.01 0.01 0.01 0.01 -0.01 -0.02 -0.01 -0.48 -0.86
CO 0.00 0.24 0.00 0.00 0.00 0.00 -0.24 0.00
DEM 0.00 0.00 -0.06 -0.12 -0.06 0.00 0.00 0.00 0.06 0.11 0.06 0.00 0.00
CO -0.03 0.00 0.00 -0.03 0.03 0.00 0.00 0.03
DEM 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.01 -0.02
CO 0.00 0.01 0.00 0.00 0.00 0.00 -0.01 0.00
DEM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUM 38.58 -38.58 66.00 -5.30 -60.69 56.57 0.29 -56.86 61.00 4.75 -65.846871 38.11 -38.11
19.29 -2.65 0.14 2.37 -19.06
67.45 69.50 69.02 67.40 67.66 69.29 73.65 62.76
2.52 7.69 12.72 18.06
46.30 28.18 28.56 35.37

DESIGN DATA
DESIGN SUPPORT MOMENT = 66.00 KNm
DESIGN SPAN MOMENT = 46.30 KNm
DESIGN MOMENT OF THE COLUMN = 19.29 KNm
DESIGN SHEAR FORCE = 73.65 KN

AT OUTER SUPPOERT = 0 KNm


USE SIMPLIFIED METHORD FROM BS

NEAR IDDLE OF END SPAN = 62.98239 KNm


AT FIRST INTERIO SUPPORT = 76.97847 KNm
AT MIDLE OF INERIOR SPANS = 48.9863 KNm
AT INTERIOR SUPPORT = 55.98434 KNm

AT OUTER SUPPOERT = 61.6266 KN


NEAR IDDLE OF END SPAN = 0 KN
AT FIRST INTERIO SUPPORT = 82.1688 KN
AT MIDLE OF INERIOR SPANS = 0 KN
AT INTERIOR SUPPORT = 75.3214 KN

Prepared by Abshir Kh. Mbarouk / +255 712 276582


4/25/2025 SUBFRAME ANALYSIS METHOD FIVE SPAN CONTINOUS BEAMS

Beam Dimension SPAN LENGTH LOAD NOTE: Carefull fill in the cell written by the Blue ink
H(m) 0.45 L1(m) 4.80 W1(KN/m) 37.35 for password call for 0712276582
B(m) 0.20 L2(m) 3.60 W2(KN/m) 37.90 The following abriv. can help you to use this sheet
L3(m) 3.60 W3(KN/m) 37.90 L1,L2,L3 Effective span of the beam
L4(m) 7.20 W4(KN/m) 43.40 H(m) Depth of the beam
L5(m) 4.80 W5(KN/m) 37.34 B(m) Base of the beam
Colum Dimension h(m) Larger side of the column
h(m) 0.18 b(m) Smaller side of the column
b(m) 0.18 W1,W2,W3 Uniform distributed load in KN/m
Lcr column 3.20 Lcr column critical length of the column
IB 0.001519 IC 8.748E-05
col AB BA col BC CB col CD DC col DE ED col EF FE col
K 2.734E-05 0.000316 0.000316 2.734E-05 0.000422 0.000422 2.734E-05 0.000422 0.000422 2.734E-05 0.000211 0.000211 2.734E-05 0.000316 0.00031641 2.73375E-05
JOINT A B C D E F
MEMBER COL AB BA COL BC CB COL CD DC COL DE ED COL EF FE COL
r 0.08 0.92 0.41 0.04 0.41 0.48 0.03 0.48 0.64 0.04 0.32 0.38 0.05 0.57 0.92 0.08
FEM -71.71 71.71 -40.93 40.93 -40.93 40.93 -187.49 187.49 -71.69 71.69
DEM 5.70 66.01 -12.72 -1.10 -12.72 0.00 0.00 0.00 93.66 6.07 6.07 -44.04 -5.71 -66.05 -65.99 -5.70
CO -6.36 33.00 0.00 -6.36 46.83 0.00 -22.02 3.03 -33.00 -33.03
DEM 0.51 5.85 -13.64 -1.18 -13.64 -19.60 -1.27 -19.60 14.07 0.91 7.04 11.39 1.48 17.09 30.40 2.63
CO -6.82 2.93 -9.80 -6.82 7.04 -9.80 5.70 3.52 15.20 8.55
DEM 0.54 6.28 2.84 0.25 2.84 -0.10 -0.01 -0.10 2.62 0.17 1.31 -7.12 -0.17 -10.68 -7.87 -0.68
CO 1.42 3.14 -0.05 1.42 1.31 -0.05 -3.56 0.66 -3.93 -5.34
DEM -0.11 -1.31 -1.28 -0.11 -1.28 -1.32 -0.09 -1.32 2.31 0.15 1.15 1.25 0.16 1.87 4.91 0.42
CO -0.64 -0.65 -0.66 -0.64 1.15 -0.66 0.62 0.58 2.46 0.93
DEM 0.05 0.59 0.54 0.05 0.54 -0.25 -0.02 -0.25 0.02 0.00 0.01 -1.15 -0.15 -1.73 -0.86 -0.07
CO 0.27 0.29 -0.12 0.27 0.01 -0.12 -0.58 0.01 -0.43 -0.87
DEM -0.02 -0.02 -0.07 -0.01 -0.07 -0.14 -0.01 -0.14 0.45 0.03 0.22 0.16 0.02 0.24 0.80 0.07
CO -0.03 -0.01 -0.07 -0.03 0.22 -0.07 0.08 0.11 0.40 0.12
DEM 0.00 0.03 0.03 0.00 0.03 -0.09 -0.01 -0.09 -0.01 0.00 0.00 -0.19 -0.03 -0.29 -0.11 -0.01
CO 0.02 0.02 -0.05 0.02 0.00 -0.05 -0.10 0.00 -0.06 -0.15
DEM 0.00 -0.02 0.01 0.00 0.01 -0.01 0.00 -0.01 0.09 0.01 0.05 0.02 0.00 0.03 0.13
SUM 6.67 -6.44 86.15 -2.10 -75.96 7.28 -1.39 -5.88 143.39 7.34 -191.49 155.71 -4.39 -150.57 3.33 -3.35
3.33 -1.05 -0.70 3.67 -2.20 -1.6726293
87.51 91.77 87.30 49.14 30.02 106.42 161.21 151.27 120.29 58.94
2.34 7.10 9.19 15.71 21.97166
96.07 24.58 6.01 107.92 43.19

DESIGN DATA
DESIGN SUPPORT MOMENT = 191.49 KNm
DESIGN SPAN MOMENT = 107.92 KNm
DESIGN MOMENT OF THE COLUMN = 3.67 KNm
DESIGN SHEAR FORCE = 161.21 KN
11/10/2019 SUBFRAME ANALYSIS METHOD SIX SPAN CONTINOUS BEAMS

Beam Dimension SPAN LENGTH LOAD NOTE: Carefull fill in the cell written by the Blue ink
H(m) 0.25 L1(m) 3.35 W1(KN/m) 30.24 for password call for 0712276582
B(m) 0.15 L2(m) 3.35 W2(KN/m) 30.24 The following abriv. can help you to use this sheet
L3(m) 3.35 W3(KN/m) 30.24 L1,L2,L3 Effective span of the beam
L4(m) 3.35 W4(KN/m) 30.24 H(m) Depth of the beam
L5(m) 3.35 W5(KN/m) 30.24 B(m) Base of the beam
Colum Dimension L6(m) 3.35 W6(KN/m) 30.24 h(m) Larger side of the column
h(m) 0.45 b(m) Smaller side of the column
b(m) 0.30 W1,W2,W3 Uniform distributed load in KN/m
Lcr column 3.50 Lcr column critical length of the column
IB 0.0001953 IC 0.0022781
col AB BA col BC CB col CD DC col DE ED col EF ED col EF FE col
K 0.0006509 0.0000583 0.0000583 0.0006509 0.0000583 0.0000583 0.0006509 0.0000583 0.0000583 0.0006509 0.0000583 0.0000583 0.0006509 0.0000583 0.0000583 0.0006509 0.0000583 0.0000583 0.0006509
JOINT A B C D E F G
MEMBER COL AB BA COL BC CB COL CD DC COL DE ED COL EF FE COL FG GF COL
r 0.92 0.08 0.08 0.85 0.08 0.08 0.85 0.08 0.08 0.85 0.08 0.08 0.85 0.08 0.08 0.85 0.08 0.08 0.92
FEM -28.28 28.28 -28.28 28.28 -28.28 28.28 -28.28 28.28 -28.28 28.28 -28.28 28.28
DEM 25.96 2.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -2.33 -25.96
CO 0.00 1.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -1.16 0.00
DEM 0.00 0.00 -0.09 -0.99 -0.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.09 0.99 0.09 0.00 0.00
CO -0.04 0.00 0.00 -0.04 0.00 0.00 0.00 0.00 0.04 0.00 0.00 0.04
DEM 0.04 0.00 0.00 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.00 0.00 -0.04 0.00 0.00 0.00 0.00 0.00 -0.04
CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DEM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUM 26.00 -26.00 29.36 -0.99 -28.37 28.24 0.04 -28.28 28.29 0.00 -28.29 28.28 -0.04 -28.24 28.37 0.99 -29.36 26.00 -26.00
13.00 -0.49 0.02 0.00 -0.02 0.49 -12.99993
50.55 50.77 50.70 50.62 50.66 50.66 50.66 50.66 50.62 50.70 51.66 49.66
1.67 5.03 8.37 11.73 15.07374 152.9282
16.24 14.12 14.14 14.14 14.12 14.76

DESIGN DATA
DESIGN SUPPORT MOMENT = -29.36 KNm
DESIGN SPAN MOMENT = 16.24 KNm
DESIGN MOMENT OF THE COLUMN = 13.00 KNm
DESIGN SHEAR FORCE = 51.66 KN

Prepared by Abshir Kh. Mbarouk /+255712276582


SUBFRAME ANALYSIS METHOD SEVEN SPAN CONTINOUS BEAMS B-B and C-C

Beam Dimension SPAN LENGTH LOAD NOTE: Carefull fill in the cell written by the Blue ink
H(m) 0.45 L1(m) 4.00 W1(KN/m) 37.50 for password call for 0712276582
B(m) 0.20 L2(m) 4.00 W2(KN/m) 37.50 The following abriv. can help you to use this sheet
L3(m) 4.00 W3(KN/m) 37.50 L1,L2,L3 Effective span of the beam
L4(m) 4.00 W4(KN/m) 37.50 H(m) Depth of the beam
L5(m) 4.00 W5(KN/m) 37.50 B(m) Base of the beam
Colum Dimension L6(m) 4.00 W6(KN/m) 37.50 h(m) Larger side of the column
h(m) 0.40 L7(m) 2.50 W7(KN/m) 20.20 b(m) Smaller side of the column
b(m) 0.20 W1,W2,W3 Uniform distributed load in KN/m
Lcr column 3.50 Lcr column critical length of the column

IB 0.00151875 IC 0.00106667
col AB BA col BC CB col CD DC col DE ED col EF ED col EF ED col EF FE col
K 0.00030476 0.0003797 0.00037969 0.00030476 0.00037969 0.000379688 0.00030476 0.00037969 0.00037969 0.00030476 0.0003796875 0.0003797 0.0003048 0.0003796875 0.0003796875 0.00030476 0.0003796875 0.0003796875 0.0003048 0.000380 0.0006075 0.0003048
JOINT A B C D E F F G
MEMBER COL AB BA COL BC CB COL CD DC COL DE ED COL EF FE COL FG FE COL FG GF COL
r 0.45 0.55 0.36 0.29 0.36 0.36 0.29 0.36 0.36 0.29 0.36 0.36 0.29 0.36 0.36 0.29 0.36 0.36 0.29 0.36 0.67 0.33
FEM -50.00 50.00 -50.00 50.00 -50.00 50.00 -50.00 50.00 -50.00 50.00 -50.00 50.00 -10.52 10.52
DEM 22.26 27.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -14.09 -11.31 -14.09 -7.01 -3.51
CO 0.00 13.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -7.04 0.00 -3.50 -7.04
DEM 0.00 0.00 -4.95 -3.97 -4.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.51 2.02 2.51 1.25 1.00 1.25 4.69 2.35
CO -2.47 0.00 0.00 -2.47 0.00 0.00 0.00 0.00 1.26 0.00 0.62 1.26 2.35 0.62
DEM 1.10 1.37 0.00 0.00 0.00 0.88 0.71 0.88 0.00 0.00 0.00 -0.45 -0.36 -0.45 -0.22 -0.18 -0.22 -1.29 -1.03 -1.29 -0.42 -0.21
CO 0.00 0.69 0.44 0.00 0.00 0.44 -0.22 0.00 -0.11 -0.22 -0.64 -0.11 -0.21 -0.64
DEM 0.00 0.00 -0.40 -0.32 -0.40 0.00 0.00 0.00 -0.08 -0.06 -0.08 0.04 0.03 0.04 0.31 0.25 0.31 0.11 0.09 0.11 0.43 0.21
CO -0.20 0.00 0.00 -0.20 -0.04 0.00 0.02 -0.04 0.15 0.02 0.06 0.15 0.21 0.06
DEM 0.09 0.11 0.00 0.00 0.00 0.09 0.07 0.09 -0.01 -0.01 -0.01 -0.04 -0.03 -0.04 -0.03 -0.02 -0.03 -0.13 -0.11 -0.13 -0.04 -0.02
CO 0.00 0.06 0.04 0.00 0.00 0.04 -0.02 0.00 -0.01 -0.02 -0.07 -0.01 -0.02 -0.07
DEM 0.00 0.00 -0.04 -0.03 -0.04 0.00 0.00 0.00 -0.01 -0.01 -0.01 0.01 0.00 0.01 0.03 0.02 0.03 0.01 0.01 0.01 0.04
CO -0.02 0.00 0.00 -0.02 0.00 0.00 0.00 0.00 0.02 0.00 0.01 0.02 0.02 0.01
DEM 0.01 0.01 0.00 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.01 -0.01 -0.01 0.00 0.00
CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -0.01 0.00 0.00 -0.01
DEM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SUM 23.46 -23.46 59.23 -4.33 -54.90 48.28 0.78 -49.07 50.39 -0.08 -50.32 49.51 -0.36 -49.15 52.38 2.09 -54.47 37.16 -11.35 -25.81 1.15 -1.18
11.73 -2.16 0.39 -0.04 -0.18 1.04 -5.67 -0.588461
74.05 75.95 76.65 73.35 74.67 75.33 75.20 74.80 74.19 75.81 79.33 70.67 35.11 15.39
1.97 6.04 9.99 14.01 17.98 22.12 25.74
49.64 23.44 25.27 25.09 24.25 29.44 4.71

DESIGN DATA
DESIGN SUPPORT MOMENT = -54.90 KNm
DESIGN SPAN MOMENT = 49.64 KNm
DESIGN MOMENT OF THE COLUMN = 11.73 KNm
DESIGN SHEAR FORCE = 79.33 KN 9

Prepared by Abshir Kh. Mbarouk/ +255 712 276 582


Full Report of RC Structural Design Under BRITISH STANDARD (BS) Assumption

PROFFESIONAL SCIENCE AND TECHNOLOGY CONSULTANCY COMPANY LIMITED


Subject Project Ref: Date

PROPOSED HOTEL BUILDING TO BE BUILT ……………………………….. OCTOBER, 2020


AT PAJE - ZANZIBAR

Calculation By: Cheacked by Sheet No:


ISSA M RASHIDI ENG. HAMISI JUMANNE MAULID SLAB 1

SLAB FLOOR DESIGN (RESTRAINED SLAB)


REFERENCE CALCULATIONS OUTPUT
BS8110:1: Design information
1997
fcu = 25 fy = 460 fyv = 460 N/mm2 25
Table 3.3 C = 25 ɸmain = 12 ɸdist = 12 mm 150
pge24 hf = 150 Ly = 4000 Lx = 2500 mm 1.6
OK 119
ly/lx = 1.6 dx = 119 dy = 107 mm 107
BS6399-1-
1996 Load and analysis
Qk = 2.5 Finish = 1.8 Prtn = 2.5 KN/m2 7.9
Table 1 Gk = 7.9 n = 15.06 KN/m 2
15.06
page 3 to 5 Analysis

Table 3.14 Enter the moment coeficient βsx = 0.078 support


pge43 βsx = 0.059 span
βsy = 0.037 Support
βsy = 0.028 span
Calculation of moment
For short span
cl3.5.3.4 Msx = βsx.n.lx^2 7.34 support 7.34
pge40 Msx = βsx.n.lx^2 5.55 span 5.55

For long span


cl3.5.3.4 Msy = βsy.n.lx^2 3.48 support 3.48
pge40 Msy = βsy.n.lx^2 2.64 span 2.64

Reinforcement design
Assume b = 1000 mm 1000
For short span
At mid-span
cl3.4.4.4 k = 0.016 z = 0.982 OR = 0.95d mm 113.05
pge29 Z = 113.05 mm Asx = 112.410 mm 2
112.41
As(prov)= 377 mm 2
377
Provide Y12 @ 300 c/c B1 (As 377mm2)

Prepared by Abshir Kh. Mbarouk


Latest Review - 2018
Full Report of RC Structural Design Under BRITISH STANDARD (BS) Assumption

SLAB FLOOR DESIGN (RESTRAINED SLAB) Cont . . .


At support 0.02
cl3.4.4.4 k = 0.021 z = 0.976 OR = 0.95d mm 101.65
pge29 Z = 101.650 mm Asx = 165.28 mm2 165.28
As(prov)= 377 mm 2
377
Provide Y12 @300c/c T2 (As 377mm2)
For long span
At mid-span
cl3.4.4.4 k = 0.0122 z = 0.986 OR = 0.95d mm 0.01
pge29 Z = 101.65 mm Asx = 59.33 mm 2
101.65
As(prov)= 377 mm2 59.33
Provide Y12 @ 300 c/c B2 (As 377mm2) 377
At support
cl3.4.4.4 k = 0.0074 z = 0.992 OR = 0.95d mm 0.01
pge29 Z = 101.65 Asx = 165.276 mm2 101.65
As(prov)= 377 mm2 165.28
Provide Y12 @ 300 c/c T1 (As 377mm ) 2

377

CHEACK FOR DEFLECTION


BS 8110-1-
1997 for continuous slab
Table 3.9 basic span /effectictive depth ration = 26
pge35 M/bd^2 = 0.39
fs = 85.72 85.72
MF = 2.00 0.39
2.00
Table 3.10 Allowable span/depth ration = 52.00 52.00
pge36 Actual span / depth = 21.01 21.01
DEFLECTION IS OK

CHEACK FOR SHEAR


cl3.5.3.7 Enter Shear force Coefficient βvx = 0.45 0.45
pge45 βvx = 0.45
βvy = 0.33 0.33
βvy = 0.33 0.02

cl3.5.5.2 Msy = βvy.n.lx = 0.0169 KN


Msy = βvx.n.lx = 0.0124 KN
pge47 v = V/(b*d) = 0.00 <0.8*fcu^0.5 = 4.00 OK
Table 3.8 vc = 0.79*((100As/(bv*d)^1/3)*(400/d)^1/4)/ɣm = 0.58
v<vc = NO SHEAR RAINFORCEMENT IS NEEDED

Table 3.25 CHEACK FOR MINIMUM REINFORCEMENT


pge88 As = 0.13*Ac/100 = 195 mm2 > As(prov) OK

Prepared by Abshir Kh. Mbarouk


Latest Review - 2018
Full Report of RC Structural Design Under BRITISH STANDARD (BS) Assumption

BEAM DESIGN OF SECONDARY BEAMS BEAM B-B and C-C


REFERENCE CALCULATION OUTPUT
BS8110-1-
1997 Design information

FOR SPAN REINFORCEMENT/SPAN MOMENT IS USED

Moment= 49.64 KNm


Shear = 79.33 KN
Depth = 450 mm
Rib width= 200 mm
ɸmain = 16 mm
ɸlink = 8 mm
Cover = 25 mm
49.64

Effective length of the beam = 4000 mm 409

d = 409 be=b = 760 Muf = 428.36 760


428.36
THE NEUTRAL AXIS LIE WITHIN THE FLANGE
NUMBER
Reinforcement design OF
cl3.4.4.4 K = 0.0156182 z = 401.77 OR = 388.55 mm BARS
pge29 Z = 388.55 As = 292.35 mm2 1.5
Asprov= 804 mm 2
292.35
804
Provide 4Y16 (As = 804mm2)
FOR SUPORT REINFORCEMENT/SURPORT MOMENT IS USED

Moment= 54.9 KNm


Shear = 79.33 KN
Depth = 450 mm
Rib width= 200 mm
BS8110:1- ɸmain = 16 mm
1997 ɸlink = 8 mm
CL3.2.2 M.Redist 0 %
54.9

0.156*fcu*b*d^2
Mrc = 0.156*fcu*b*d^2 = 130.47918
OK
OK

Prepared by Abshir Kh. Mbarouk


Latest Review - 2018
Full Report of RC Structural Design Under BRITISH STANDARD (BS) Assumption

BEAM DESIGN Cont . . .


d = 409 K = M/(fcu*b*d^2) = 0.06563805811778
cl3.4.4.4 z = 376.61 OR = 388.55 z = 376.61 mm
pge29 As = 333.58 mm2
Asprov= 804 mm2

Provide 4Y16 (As 804 mm2)

CHEACK FOR DEFLECTION


BS 8110-1- BSED/ED = 20.8 fs = 111.51 111.51
1997 MF = 2.91 M/bd^2 = 0.39 0.39
Table 3.9 2.91
Table 3.10 Allowable Deflaction = 41.60 41.60
Actual Deflaction = 9.78 9.78
DEFLECTION IS OK

DESIGN FOR SHEAR


cl3.4.5.2
pge47 v = V/(b*d) = 0.97 < 0.8*fcu^0.5 = 4
OK
Table 3.7 vc = 0.79*((100As/(bv*d)^1/3)*(400/d)^1/4)/ɣm = 0.62

v<vc = NOT OK, SHEAR REINFORCEMENT IS NEEDED GO TO Table 3.7, BS8110-1


Asv= 100.54
0.5*vc < v < (vc+0.4)= 1 (vc+0.4) < v < 0.8*SQRT(fcu) = FALSE

PROVIDE LINKS 1

Table 3.7 LINKS 1 = 549 mm Provide Y8 @ 225 c/c (As 646mm2)

LINKS 2 = 637 mm Provide Y8 @ 200c/c (As 646mm2)

Table 3.25 CHEACK FOR MINIMUM AREA


pge88 Asmin = 0.48*Ac/100 = 432 mm2 > As(prov)

OK, AREA OF REINFORCEMENT IS ENOUGH

CHEACK FOR MAXIMU AREA


cl3.12.6.1 Asmax = 0.04Ac = 3600 mm2 < As(prov)

OK
CHEACK FOR MAXIMUM SPACING
s <= 3d or 750mm 750 mm
OK, THERE IS NO NEED OF EXTRA BARS

cl3.4.5.5 CHEACK FOR MAXIMU SPACING OF LINKS


S = 0.75*d = 306.75 > links spac 549
NOT OK

Prepared by Abshir Kh. Mbarouk


Latest Review - 2018
Full Report of RC Structural Design Under BRITISH STANDARD (BS) Assumption

DESIGN OF EXTERNAL COLUMN


REFERENCE CALCULATION OUTPUT

BS8110-1- Biaxial method


1997 Design information

column size
h = 400 mm
b = 300 mm
cover = 25 mm

ɸmai = 16 mm
ɸlink = 8 mm
fcu = 25 N/mm2
fy = 460 N/mm2
fcu = 250 N/mm2

Moment about x axis = 59.6 KNm 359


Moment about y axis = 59.6 KNm 259

N(Reaction of one floor) = 206.7 KN

Number of floors = 3 359


From table 32 below Beta (β) = 0.88

Total axial Load = 620.0


N/bhfcu= 0.2 1.66E+05
depth = 359 b' 259 h' = 359 mm 5.2
Mx/h = 165877.44 My/b 165877.44 n = 132.19

Reinforcement design

N/bh = 5.2 100As/bh= 1.1


use chart

M/bh^2 = 2.8 As = 1320 mm2 1320


Asprov = 1608 mm 2

d/h 0.90

Provide 8T16 (As 1608mm2)

Prepared by Abshir Kh. Mbarouk


Latest Review - 2018
Full Report of RC Structural Design Under BRITISH STANDARD (BS) Assumption

DESIGN OF EXTERNAL COLUMN Cont . . .


Design for stirrups
Asv = 100.5
Sv = (0.95*fyv*Asv)/(0.4*bv) = 198.993333 mm
or
Svmax = 12*ɸmain = 192 mm

Provide Y8 @ 175 c/c (As 646mm2)

Prepared by Abshir Kh. Mbarouk


Latest Review - 2018
Full Report of RC Structural Design Under BRITISH STANDARD (BS) Assumption

REFERENCE CALCULATION OUTPUT

DESIGN OF EXTERNAL COLUMN


CALCULATION OF LOADS
L1 = 4 m L3 = 2.5 m
L2 = 4 m L4 = 0 m

prtn = 2.5 KN/m2 finish = 1.8 KN/m2

LIVE LOAD OF THE FLOOR = 3 KN/m2


HEIGHT OF FLOORS = 3.5 m
NUMBER OF FLOORS = 2
swb&c = 7.56 10.08 8.64
sw = 3.6 KN/m2 Gk = 7.9
SERVICE LOAD (DEAD) = 113.32
SERVICE LOAD (LIVE) = 30
TOTAL LOAD (SERVICE) = 143.32
TOTAL LOAD (ULTIMATE) = 206.648

Design information

Fcu = 30.00 ɸmain = 16

from limit of Total Axial load ultimate = 206.65 350


slenderNess Minimum Column dimension should be = 350
ENTER YOUR WIDTH ENTER YOUR DEPTH
400 mm 200 mm
OK NOT OK

As = 804 mm2 Provide 4T16 (As 804mm2) -3872.00519

Links = 192 mm2 Provide Y8 @ 200 c/c (As 646mm2)

DESIGN OF FOUNDATION (external)…


REFERENCE CALCULATION OUTPUT

Design information
Fcu = 30 ɸmain = 16 ɸlink = 16 mm
cover = 50
Soil Bearing Pressure (Pb) = 175 KN/m2

Total Axial load (Ultimate) 206.65 KN


Total Axial load (service ability) =143.32 KN
A = 0.82 m2 Length = Width = 904.97 mm

Propose your Length and width =2500 mm OK

Minimum Depth 172.322 mm


Enter your depth of base 500 mm OK

Prepared by Abshir Kh. Mbarouk


Latest Review - 2018
Full Report of RC Structural Design Under BRITISH STANDARD (BS) Assumption

Total weight under the footing = 218.32 KN


Cheack for bearing 34.93 KN/m2 OK
Calculate maximum bearing pressure = 45.06 KN/m2 281.648
Effective depth of the base (d) = 442 mm 1150
maximum moment at the face of column = 74.50 KNm
K = 0.0127106 z = 419.9 mm

As = M/(0.95*fy*z) = 162.392 mm2/m

Asprovided = 1005 mm2/m


Provide Y16 @ 250c/c (As = 804mm2)

Distribution of bars =(3c/4)+9d/4) = 1294.50 mm


OK, Follow Below Information
The reinforcement should be distributed uniformly over Length of the Base

Determine Depth of the foundation

Depth = Pb/ɣ = 8.75 m 8.75 m

Dfmin = 2.5 Dfmax = 8.75 m

Cheack for shear

SHEAR AT THE FACE OF THE COLUMN

V = 259.11623 KN

va = V/(W*d) = 0.04 vb = 0.8*SQRT(fcu) = 4.3817805


va < vb

TRUE

Prepared by Abshir Kh. Mbarouk


Latest Review - 2018
Full Report of RC Structural Design Under BRITISH STANDARD (BS) Assumption

DESIGN OF FOUNDATION Cont . . .


SHEAR AT 1.0d FROM FACE OF THE COLUMN
Projection = (L-wc)/2-d = 608
V = Vulti*L*Projection = 68.50
va = V/(W*d) = 0.06

Table 3.9 Vc = 0.28


0.55
v < 2vc
TRUE
PUNCHING SHEAR

SHEAR AT 1.5d FROM FACE OF THE COLUMN

Perimeter = column perimeter+8*1.5d = 6904


Area of P = (Colum w+3d)*(Colm h+3d)= 2633876
V = Vulti*(Atotal - Area of P = 147.40
v = V/((Perimeter*d) = 0.05
Table 3.9 Vc = 0.20
v < vc
1
THERE IS NO NEED OF PUNCHING SHEAR REINFORCEMENT

SUMMARY DATA OF FOOUNDATION

Length of the base 2500 mm


Depth of the base 500 mm
Asprovided 1005 mm2/m
Diameter of bars 16 mm

Prepared by Abshir Kh. Mbarouk


Latest Review - 2018
SUMMARY B SHEET FOR SLAB DESIGN ANDANALYSIS
STATICAL Ly/Lx Reinforcemen
SYSYTEM Z(mm) t
KNm ) ) )
βsx(+VE)= ve(+) = Provide Y12-
113.05 195 58.85 377
0.068 6.18 300c/c-B1
βsx(-VE)= ve(-) = Provide Y12-
113.05 195 185.2 377
S8,S22 0.051 8.24 300c/c-T1
1.4
βsy(-VE)= ve(-) = Provide Y12-
101.65 195 90.7 377
0.037 4.42 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 139 377
0.024 2.91 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 115.0 377
0.028 6.65 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 197.7 377
S9,S23 0.037 8.79 300c/c-T1
1.0
βsy(-VE) ve(-) = Provide Y12-
101.65 195 153.8 377
0.032 7.6 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 150 377
0.024 5.7 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 115.3 377
0.024 5.7 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 165 377
0.031 7.36 300c/c-T1
1.0
S12,S26 βsy(-VE) ve(-) = Provide Y12-
101.65 195 128.28 377
0.032 7.6 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 153.8 377
0.024 5.7 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 115.3 377
0.024 5.7 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 165 377
S10,S24 0.031 7.3 300c/c-T1
1.0
βsy(-VE) ve(-) = Provide Y12-
101.65 195 128.28 377
0.032 7.6 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 153.8 377
0.024 5.7 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 40.9 377
0.059 4.04 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 111.73 377
S37 0.048 4.96 300c/c-T1
1.7
βsy(-VE) ve(-) = Provide Y12-
101.65 195 90.9 377
0.032 2.69 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 54.5 377
0.024 2.02 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 134.6 377

1.0
113.05 195 134.6 377
0.039 7.12 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 208.46 377
S46 0.03 9.26 300c/c-T1
1.0
βsy(-VE) ve(-) = Provide Y12-
101.65 195 160.35 377
0.037 8.79 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 177.825 377
0.028 6.65 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 78.12 377
0.052 5.38 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 161.35 565
S47 0.039 7.17 300c/c-T1
1.3
βsy(-VE) ve(-) = Provide Y12-
101.65 195 121.01 377
0.037 5.1 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 103.227 377
0.028 3.86 300c/c-T2
βsx(+VE) ve(+) = 68.7 377 Provide Y12-
113.05 195
0.055 4.97 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 149.99 565
S48 0.041 6.66 300c/c-T1
1.4
βsy(-VE) ve(-) = Provide Y12-
101.65 195 111.81 377
0.037 4.48 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 90.727 377
0.028 3.39 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 44.84 377
0.07 3.450 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 102.66 565
S49 0.053 4.560 300c/c-T1
1.9
βsy(-VE)= ve(-) = Provide Y12-
101.65 195 77.73 377
0.000 0.000 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 0.000 377
0.034 2.210 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 0 377
0 0 300c/c-B1
βsx(-VE)= ve(-) = Provide Y12-
113.05 195 26.97 565
SA,SC 0.105 3.18 300c/c-T1
2.0
βsy(-VE)= ve(-) = Provide Y12-
101.65 195 71.59 377
0.058 1.76 300c/c-B2
βsy(+VE)= ve(+) = Provide Y12-
101.65 195 35.6 377
0.044 1.33 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 111.38 377
0.039 4.95 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 71.9 565
SD,SJ,SH 0.03 3.81 300c/c-T1
1.0
βsy(-VE) ve(-) = Provide Y12-
101.65 195 85.68 377
1.0
101.65 195 85.68 377
0.037 4.69 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
0.028 3.55 101.65 195 95.01 377 300c/c-T2
STATICAL Ly/Lx Reinforcemen
SYSYTEM Z(mm) t
KNm ) ) )
βsx(+VE) ve(+) = Provide Y12-
113.05 195 38.86 377
0.057 1.73 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 26.973 377
SB 0.043 1.3 300c/c-T1
1.8
βsy(-VE) ve(-) = Provide Y12-
101.65 195 0 377
0 0 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 29.32 377
0.044 1.33 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 179.92 377
0.063 7.99 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 61.628 377
SE,SG 0.048 6.09 300c/c-T1
1.8
βsy(-VE) ve(-) = Provide Y12-
101.65 195 82.171 377
0.032 4.06 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 137.08 377
0.024 3.04 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 179.92 377
0.063 7.99 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 61.628 377
0.048 6.09 300c/c-T1
1.8
SL,SN βsy(-VE) ve(-) = Provide Y12-
101.65 195 82.171 377
0.032 4.06 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 137.08 377
0.024 3.04 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 83.56 377
0.037 3.71 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 48.734 377
SF,SM 0.028 2.81 300c/c-T1
1.1
βsy(-VE) ve(-) = 101.65 195 64.97 377 Provide Y12-
0.032 3.21 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 63.23 377
0.024 2.41 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 185.71 377
0.037 8.25 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 108.316 377
SS,SU 0.028 6.24 300c/c-T1
1.1
βsy(-VE) ve(-) = Provide Y12-
101.65 195 144.422 377
0.032 7.13 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 140.54 377
1.1

101.65 195 140.54 377


0.024 5.35 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 234 377
0.078 10.42 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 91.916 565
SP 0.059 7.88 300c/c-T1
1.5
βsy(-VE) ve(-) = Provide Y12-
101.65 195 121.654 377
0.045 6.01 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 177.39 377
0.034 4.54 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 255.52 377
0.039 11.35 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 164.952 377
SV 0.03 8.73 300c/c-T1
1.0
βsy(-VE) ve(-) = Provide Y12-
101.65 195 217.972 377
0.037 10.77 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 196.55 377
0.028 8.15 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 282.02 377
0.047 12.53 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 183.439 377
SY 0.036 9.6 300c/c-T1
1.0
βsy(-VE) ve(-) = Provide Y12-
101.65 195 242.787 377
0.045 11.99 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 216.01 377
0.034 9.06 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 211.33 377
0.074 9.39 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 87.307 565
SW 0.055 6.98 300c/c-T1
1.4
βsy(-VE) ve(-) = Provide Y12-
101.65 195 115.55 377
0.045 5.71 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 157.07 377
0.034 4.31 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 220.85 377
0.044 9.81 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 126.37 377
SAA 0.033 7.36 300c/c-T1
1.1
βsy(-VE) ve(-) = Provide Y12-
101.65 195 166.987 377
0.037 8.25 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
101.65 195 165.64 377
0.028 6.24 300c/c-T2
βsx(+VE) ve(+) = Provide Y12-
113.05 195 282.02 377
0.047 12.53 300c/c-B1
βsx(-VE) ve(-) = Provide Y12-
113.05 195 215.811 377
1.0
113.05 195 215.811 377
SAB 0.036 9.6 300c/c-T1
1.0
βsy(-VE) ve(-) = Provide Y12-
101.65 195 242.787 377
0.045 11.99 300c/c-B2
βsy(+VE) ve(+) = Provide Y12-
0.04 10.66 101.65 195 216.01 377 300c/c-T2
Subject Project Ref: Date
………………………. ……………….. 4/25/2025
Calculation By: Cheacked by Sheet No:
Abshir Kh. Mbarouk MR S.MARTIN 1
REFFERENC CALCULATION OUT PUT
Subject Project Ref: Date
RESIDENT BUILDING TO BE
4/25/2025
Calculation By: Cheacked by Sheet No:
Abshir Kh. Mbarouk MR S.MARTIN 1
24 F 24 Review your calculation
89 A 89 A
45 D 45 D
78 B+ 78 B+
31 F 31 F
65 B 65 B
78 B+ 78 B+
80 A 80 A

RESIDENT BUILDING TO BE
BUILT AT MPENDAE
βsx(+VE) ve(+) = AREA
0.078 7.34 165.28
βsx(-VE) ve(-) =
1.6 0.059 5.55 112.410
βsy(-VE) ve(-) =
0.037 3.48 165.276
βsy(+VE) ve(+) =
0.028 2.64 59.33