NOTE :
A B C
9300
5300 4000
1200
A B C
9300
5300 4000
01 01 MANHOLE 28
28 OPENING
WATER TANK-3
CAP.=60KL
26
WATER DEPTH= 4.1M MH-01 SLOPE TO 25
24
AREA=17 SQ.M DRAIN
3800
3800
4300
SL 23 22
KEY PLAN
O
SU PE SUMP
MP TO
(600x600x300)
21 20
MH-02 MANHOLE
OPENING
20
19 18
02 02 MANHOLE
17 OPENING
WATER TANK-2
200
CAP.=60KL
15
WATER DEPTH= 4.1M
PUMP ROOM
MH-03
AREA=17 SQ.M
13
11400
11400
3800
3800
SL
O
SU PE T
MP
SUMP 11
O (600x600x300)
MH-04 09 MANHOLE
OPENING
REVISIONS
RV. DESCRIPTION DATE
08
03 07 03 MANHOLE
OPENING R0 CRD FOR APPROVAL 25-08-2025
WATER TANK-1 05 DRAWING STAGE
CAP.=60KL
WATER DEPTH= 4.1M MH-05 03
CRD
AREA=17 SQ.M SLOPE TO
3800
3800
DRAIN CONSTRUCTION REFRANCE DRAWING
SL SUMP
O
SU PE T (600x600x300) UP TO
MP O
MH-06 GROUND MANHOLE 2 MLD WTP
LVL OPENING
SUMP
(800x800x800) NAME OF WORK:-
04 04 HAR GHAR NAL KA JAL
CONTRACTOR
RCC RETAINING AVIAN INFRASTRUCTURE PVT LTD
WALL (As/Structure) ROOF PLAN UGT DRAWING TITLE :-
PLAN UGT
DETAILED PLAN FOR
UGT (UNDER GROUND TANK)
SCALE - NOT TO SCALE
SHEET- A2 NORTH
N
DATE - 15-08-2025