MATERIAL CONSUPTION STATEMENT
Name of the work:-Construction of market complex at Govindtola Daily market , Sambalpur ,[Link].2
Sl.N Boulder or
o. Item Qnty,& unit Cement Sand Metal Chips spall Bricks M.S Rod
1 Sand filling in f&p including
watering ,cost ,conveyance,roya
ltycomplete. 6.78 cum - 6.78 cum - - - -
2
Cement concrete ([Link]) using
40 mm sized H.B.H.G metal
including cost ,complete, 9.05 cum 15.57 Qntl 4.34 cum 8.69 cum - - - -
3 Cement concrete ([Link]) using
12 mm sized H.B.H.G metal
including
cost,conveyance,royalty ,compl
ete, 8.92 cum 28.81 Qntl 4.01 cum - 8.03 cum - - -
4 Brick work in cement motar
(1:6) in s/s in cluding
cost, ,conveyance,royality,cur
ring,[Link]. 2.75 cum 1.85 Qntl 0.77 cum - - - 962.5 nos
5 R.C.C works in c.c (1:1 1/2:3)
using 12 mm sized c.b.h.g chips
including cost complete. 0.18 cum 0.77 Qntl 0.081 cum - 0.162 cum - -
6 12 mm thick c.p in c.m (1:6)
including cost,
conveyance,labour
etc,complete. 25.30 sqm 1.26 Qntl 0.53 cum - - - -
7 Supplying,cutting
bending,binding,fitinfand
placing in position including,all
cost,conveyance,taxes,labour
&M.S rod (HYSD BAR)complete. 0.19 qntl 0.19 Qtl.
A.S floorig ([Link])
108.10 sqm 0.65 12.97 - 2.4863
Verified tile 108.10 sqm
White washing 2 coat
580.93 sqm
Painting 2 coat with
85.90 sqm
Water proffing cement paints
198.20 sqm
Distempering 2 coat
402.73 sqm
M.S door ,window
208.45 Kg
Fitting,fixing of M.S
clamp ,door & window 6.24 sqm
Total= 48.26 Qntl 16.52 cum 8.69 cum 8.19 cum 962.5 nos 0 Qtl.
or 96.51 bags
or say = 274 bags
DEVEATION STATEMENT
Name of the work:-Renovation of building of OSRTC garage at Sambalpur.
[Link]. Item As per Estimate As per Agrement As per work done
Amout in Amout in
Qnty. Unit Rate Rs. Qnty. Unit Rate Rs. Qnty. Unit Rate Amout in Rs.
1 Earth work in excavation in
h&g soil in F & P 5.63 cum 87.55 492.9 5.63 cum 87.55 492.9 6.78 cum 87.55 593.589
2 Sand filling in f & p curring
labour etc. complete. 6.84 cum 345.20 2361.2 6.84 cum 345.2 2361.168 6.78 cum 345.20 2340.456
3
Cement concrete ([Link]) 9.13 cum 2996.20 27355.3 9.13 cum 2996.2 27355.31 9.05 cum 2996.20 27115.61
4 Cement concrete ([Link])
using20 mm sized down
graded C.B.H.G chips 9.13 cum 4702.30 42932.0 9.13 cum 4702.3 42932 8.92 cum 4702.30 41944.516
5 R.C.C works in c.c (1:1 1/2:3)
using20 mm sized down
graded C.B.H.G chips 0.19 cum 7038.55 1337.3 0.19 cum 7038.55 1337.325 0.18 cum 7038.55 1266.939
6 M.S Reinforcement
0.19 qntl. 6609.6 1255.8 0.19 qntl. 6609.6 1255.824 0.19 qntl. 6609.60 1255.824
7 Brick work in Super Structure
(1;6) 2.78 cum 2864.0 7961.9 2.78 cum 2864 7961.92 2.75 cum 2864.00 7876
8 12 mm cement plasterin c.m
(1:6) 30.00 sqm 81.4 2442.0 30 sqm 81.4 2442 25.30 sqm 81.40 2059.42
9 A.S floorig ([Link])
108.10 sqm 186.1 20117.4 108.1 sqm 186.1 20117.41 108.10 sqm 186.10 20117.41
10
Verified tile 108.10 sqm 929.5 100479.0 108.1 sqm 929.5 100479 108.10 sqm 929.50 100478.95
11 White washing 2 coat
580.93 sqm 7.2 4182.7 580.93 sqm 7.2 4182.696 580.93 sqm 7.20 4182.696
12 Painting 2 coat with
96.00 sqm 71.2 6835.2 96 sqm 71.2 6835.2 85.90 sqm 71.20 6116.08
13 Water proffing cement paints
213.84 sqm 20.25 4330.3 213.84 sqm 20.25 4330.26 198.20 sqm 20.25 4013.55
14 Distempering 2 coat
402.73 sqm 36.3 14619.1 402.73 sqm 36.3 14619.1 402.73 sqm 36.30 14619.099
15 M.S door ,window
209.00 Kg 70.0 14630.0 209 Kg 70 14630 208.45 Kg 70.00 14591.5
16 Fitting,fixing of M.S
clamp ,door & window 6.47 sqm 70.1 453.5 6.47 sqm 70.1 453.547 6.24 sqm 70.10 437.424
10
TOTAL 251785.6 251785.6 249009.063
As per site condition the above items are deveated ,but as a whole it is within the estimated cost.
Junior Engineer Assistant Engineer Municipal Engineer
Sambalpur Municipal Corporation Sambalpur Municipal Corporation Sambalpur Municipal Corporation