Construction Material Usage Report

The document outlines the material consumption statement for the construction of a market complex at Govindtola Daily market and a deviation statement for the renovation of the OSRTC garage at Sambalpur. It details quantities, unit rates, and costs associated with various construction materials and works. The total costs for the renovation work are noted to be within the estimated budget despite some deviations in item quantities.

Uploaded by

paduu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views4 pages

Construction Material Usage Report

The document outlines the material consumption statement for the construction of a market complex at Govindtola Daily market and a deviation statement for the renovation of the OSRTC garage at Sambalpur. It details quantities, unit rates, and costs associated with various construction materials and works. The total costs for the renovation work are noted to be within the estimated budget despite some deviations in item quantities.

Uploaded by

paduu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

MATERIAL CONSUPTION STATEMENT

Name of the work:-Construction of market complex at Govindtola Daily market , Sambalpur ,[Link].2

Sl.N Boulder or
o. Item Qnty,& unit Cement Sand Metal Chips spall Bricks M.S Rod
1 Sand filling in f&p including
watering ,cost ,conveyance,roya
ltycomplete. 6.78 cum - 6.78 cum - - - -
2
Cement concrete ([Link]) using
40 mm sized H.B.H.G metal
including cost ,complete, 9.05 cum 15.57 Qntl 4.34 cum 8.69 cum - - - -
3 Cement concrete ([Link]) using
12 mm sized H.B.H.G metal
including
cost,conveyance,royalty ,compl
ete, 8.92 cum 28.81 Qntl 4.01 cum - 8.03 cum - - -
4 Brick work in cement motar
(1:6) in s/s in cluding
cost, ,conveyance,royality,cur
ring,[Link]. 2.75 cum 1.85 Qntl 0.77 cum - - - 962.5 nos
5 R.C.C works in c.c (1:1 1/2:3)
using 12 mm sized c.b.h.g chips

including cost complete. 0.18 cum 0.77 Qntl 0.081 cum - 0.162 cum - -
6 12 mm thick c.p in c.m (1:6)
including cost,
conveyance,labour
etc,complete. 25.30 sqm 1.26 Qntl 0.53 cum - - - -
7 Supplying,cutting
bending,binding,fitinfand
placing in position including,all
cost,conveyance,taxes,labour
&M.S rod (HYSD BAR)complete. 0.19 qntl 0.19 Qtl.
A.S floorig ([Link])
108.10 sqm 0.65 12.97 - 2.4863

Verified tile 108.10 sqm


White washing 2 coat
580.93 sqm
Painting 2 coat with
85.90 sqm
Water proffing cement paints
198.20 sqm
Distempering 2 coat
402.73 sqm
M.S door ,window
208.45 Kg
Fitting,fixing of M.S
clamp ,door & window 6.24 sqm

Total= 48.26 Qntl 16.52 cum 8.69 cum 8.19 cum 962.5 nos 0 Qtl.
or 96.51 bags
or say = 274 bags
DEVEATION STATEMENT
Name of the work:-Renovation of building of OSRTC garage at Sambalpur.

[Link]. Item As per Estimate As per Agrement As per work done


Amout in Amout in
Qnty. Unit Rate Rs. Qnty. Unit Rate Rs. Qnty. Unit Rate Amout in Rs.
1 Earth work in excavation in
h&g soil in F & P 5.63 cum 87.55 492.9 5.63 cum 87.55 492.9 6.78 cum 87.55 593.589
2 Sand filling in f & p curring

labour etc. complete. 6.84 cum 345.20 2361.2 6.84 cum 345.2 2361.168 6.78 cum 345.20 2340.456
3
Cement concrete ([Link]) 9.13 cum 2996.20 27355.3 9.13 cum 2996.2 27355.31 9.05 cum 2996.20 27115.61
4 Cement concrete ([Link])
using20 mm sized down
graded C.B.H.G chips 9.13 cum 4702.30 42932.0 9.13 cum 4702.3 42932 8.92 cum 4702.30 41944.516
5 R.C.C works in c.c (1:1 1/2:3)
using20 mm sized down
graded C.B.H.G chips 0.19 cum 7038.55 1337.3 0.19 cum 7038.55 1337.325 0.18 cum 7038.55 1266.939
6 M.S Reinforcement
0.19 qntl. 6609.6 1255.8 0.19 qntl. 6609.6 1255.824 0.19 qntl. 6609.60 1255.824
7 Brick work in Super Structure
(1;6) 2.78 cum 2864.0 7961.9 2.78 cum 2864 7961.92 2.75 cum 2864.00 7876
8 12 mm cement plasterin c.m
(1:6) 30.00 sqm 81.4 2442.0 30 sqm 81.4 2442 25.30 sqm 81.40 2059.42
9 A.S floorig ([Link])

108.10 sqm 186.1 20117.4 108.1 sqm 186.1 20117.41 108.10 sqm 186.10 20117.41
10

Verified tile 108.10 sqm 929.5 100479.0 108.1 sqm 929.5 100479 108.10 sqm 929.50 100478.95
11 White washing 2 coat

580.93 sqm 7.2 4182.7 580.93 sqm 7.2 4182.696 580.93 sqm 7.20 4182.696
12 Painting 2 coat with
96.00 sqm 71.2 6835.2 96 sqm 71.2 6835.2 85.90 sqm 71.20 6116.08
13 Water proffing cement paints

213.84 sqm 20.25 4330.3 213.84 sqm 20.25 4330.26 198.20 sqm 20.25 4013.55
14 Distempering 2 coat

402.73 sqm 36.3 14619.1 402.73 sqm 36.3 14619.1 402.73 sqm 36.30 14619.099
15 M.S door ,window

209.00 Kg 70.0 14630.0 209 Kg 70 14630 208.45 Kg 70.00 14591.5


16 Fitting,fixing of M.S

clamp ,door & window 6.47 sqm 70.1 453.5 6.47 sqm 70.1 453.547 6.24 sqm 70.10 437.424

10

TOTAL 251785.6 251785.6 249009.063

As per site condition the above items are deveated ,but as a whole it is within the estimated cost.

Junior Engineer Assistant Engineer Municipal Engineer


Sambalpur Municipal Corporation Sambalpur Municipal Corporation Sambalpur Municipal Corporation